COMMITTEE OF THE WHOLE
AGENDA
KIMBERLY A. DEWIS
Deputy Village Clerk
ALL
Meeting Location: Meeting Date and Time:
Mount Prospect Senior Center Tuesday, June 22, 1999
50 South Emerson Street 7:30 p.m.
4iayor Gerald L. Farley
Trustee Timothy Corcoran Trustee Daniel Nocchi
Trustee Paul Hoefert Trustee Michaele Skowron
Trustee Richard Lohrstorfer Trustee Irvana Wilks
Ile ACCEPTANCE OF MINUTES OF JUNE 8,1999
Ills CITIZENS TO BE HEARD
IV, 0 ISC'U$S ION, O1NA..N,9 gHOU'LiDg.,,�,,POLICY FOR, VILLAGE, g1,REETS
The Village has long followed a policy of installing stone shoulders at the edge of pavement where
no curbs exist. Thereis a very small percentage of Village streets without curbs as highlighted in the
map enclosed in the packet. The policy regarding streets without curbs is to repair existing stone
shoulders or to install a 24" -wide stone shoulder wherever a non -curbed street is included in the street
resurfacing program. This discussion is being brought forward at the request of residents of Golfview
Estates.
Glendale Lane was resurfaced in 1998 and a new 24" -wide stone shoulder was Installed according
to Village policy. Numerous residents that live on Glendale Lane objected to the presence and
appearance of the stone shoulder. Residents also attended a Coffee with Council meeting in the fall
of 1998 to voice their concerns directly to the Village Board. At the Coffee with CouncIl meeting, the
Mayor and attending Village Board members reiterated the policy regarding the stone shoulders for
non -curbed streets. A number of residents remained dissatisfied with the response at the Coffee with
Council meeting so a follow-up meeting was held on April 7, 1999 at the Public Works facility. The
meeting at the Public Works facility included the Engineering staff and 27 residents representing 20
homes in the Golfvie'w area. The residents raised a number of concerns including safety, visual
DIY and maintenance issues. Engineering staff communicated why stone shoulders are
utilized. Engineering staff responded by stating there is a need to protect the pavement edge from
crumbling due to traffic and to allow parkin ' g without damaging yards and the pavement edge. The
use of stone shoulders is typical for non -curbed streets in surrounding communities as well.
Residents from Golfview Estates have been invited to the me
o eting so that they can voice their
concerns directly tthe Village Board In an effort to discuss this policy and provide direction to Village
staff as to whether the policy should be altered. Appropriate Engineering staff will be present to
e
facilitatthe discussion.
01 OF #1
il, MAX
In an effort to save the General Store which is the oldest remaining commercial structure in the
Village, over a year ago, the building was offered to anyone who could relocate and renovate the
building. As a result of this offer, an individual came forth with a plan to move and renovate the
building. Unfortunately, he focused on a location that was not under the Village's control and the
current owner was not interested in selling the property for the building to be relocated.
Following this private attempt to relocate the building, Trustee Hoefert has been attempting to
coordinate the relocation and reuse of this historical building for general office/professional space in
the downtown area. He has secured the commitment of the local high school and Nipper School
trade programs and of local businesses for labor and materials that will underwrite a significant portion
of the project costs. While significant donations will be made, there will also be a level of financial
assistance required by the Village to cover the cost to move the building, utilities, and skilled trade
work necessary to renovate the building at the new site.
0
The proposal that is being forwarded for consideration by the Village Board is to move the building
to a Village -owned site on Pine Street adjacent to Tri-State Electronics, across from the Clocktower
Condominiums. Given that there was concern about the relocation by the residents of the Clocktower
Condominiums, the ClocKtower Condominium Association convened a meeting last ..vening, June
21, to discuss the proposal. Results of that meeting will be reported out by Trustee Hoefert at the
Committee of the Whole meeting this evening. Residents and representatives of the Clocktower
Condominium Association have been invited to the meeting this evening as another opportunity to
offer input regarding the proposal.
V1. VILLAGE Y2K PLAN
The Village Manager convened a Task Force of Village staff representing all Departments in March
of this year in an effort to formulate a Village Response Plan for the Y2K rollover at the end of this
year. Y2K is the common designation for Year 2000 issues relating to computers recognizing the
year 2000 instead of the year 1900 in the memory and date functions of the computers. The Village
Plan is divided into four critical elements. These elements include the following:
1. Ensure critical system compliance for internal and external systems.
2. Citizen/employee education.
3. Special needs individuals.
4. Communications apparatus.
The Task Force reviewed operations as they related to the Village in its effort to provide service to
the residents. In many instances, the Village does not provide service directly such as the case for
telephone, natural gas, electricity and water and sanitary service to a portion of the Village served by
Citizens' Utilities. The Village participates as a joint service provider for the Northwest Central
Dispatch System, the Joint Water Agency and the Water Reclamation District. Task Force members
reviewed *Internal systems relating to computers and other related systems, which may be at risk and
have undertaken appropriate action to minimize any Y2K impact. Discussions with external service
providers have yielded assurances that the service providers will be prepared for the changeover.
However, since no one knows for sure what will occur, members of the Task Force formulated plans
to provide Village core services in the event that there are disruptions to basic utilities.
The Task Force has drafted a citizen education piece, which is a Special Newsletter set to be
distributed, after July 4 to all Village residents and em'ployees of the Village. This info rmatiort piece
summar I i,zes many of the preparations, which the Village, has undertaken for the Y2K weekendlo, Staff
has geared the response plan to maintaining core services during the critical weekend period Of
December 31 to January .1
The Human Services Department has an ongoing program where people with special needs can
notify i• for follow-up calls and visits if necessary depending on weather and other related
situations which may put these individuals at risk. While this program has-been underway for almost
a yeAr, information Is included h theSpec"a s an
j, I Y21K Newsletter for additional s'i ign-ulp, d follow-up
'The Emer en,qy Oporations Center at the Police a,nd F"i ilding will be
during the Y2K, weekend, 9 ro bu
activated duringthe Y,2K weekend and6taftd by appropriate Village personnel to answer calls and
coordinate responses to citizens depending on service disruptions or for other information purposes.
While the staffing needs have yet to be finalized for the Communications Center, it is the intention of
the Task Force that this Center will remain open during the entire weekend and Departmental phones
will be transferred to the Call Center in addition to the special Y2K information line which has been
s t up and is advertised in the Special Y2K Newsletter.
There have been minimal expenditures for Y2K related 'Items to date, however, depending on the
level of preparedness the Village Board Is comfortable with, there are some expenditures highlighted
in the material that include generator rental and rewiring expenses for generator back-up of some key
municipal facilities. Staff is requesting Village Board input 'Into the Plan itself and direction as to
whether staff should consummate the necessary contracts to ensure generator availability for critical
building facilities. While the rental of the generators highlighted in the memorandum from D. eputy
Public Works Director Sean Dorsey is not required by the proposed Plan, their inclusion would
provide an extra level of preparedness.
Members of the Y2K Task Force and Department Directors will be in attendance at the meeting to
facilitate any discussion and answer any questions that the Village Board or public may have
regarding the Village Y2K Preparedness Plan.
LTR
14q Kim 4_11R9 **I [411L I
LAND ACQUISITION:
9 ILCS 120/2 (c) (5) —"The purchase or lease of real property for the use of the public body, including meetings
held for the purpose of discussing whether a particular parcel should be acquired."
HAGEN\Cow\Agenda\62299 COW Agenda.doc
MINUTES
COMMITTEE OF THE WHO10
JUNE 8w 1999
Mayor Farley called the meeting to order at 6:19 p.m. Present at the meeting were: Trustees
Timothy Corcoran, Paul Hoefert, Richard Lohrstorfer, Daniel Nocchi, Michaele Skowron and
Irvana Wilks. Staff members present included Village Manager Michael Janonis, Assistant
Village Manager David Strahl, Community Development Mctor Bill Cooney, Finance Director
Doug Ellsworth, Police Chief Ron Pavlock, Deputy Police Chief Ron Richardson, Deputy Finance
Director Carol Widmer, Fire Chief Mike Figolah, Deputy Fire Chief John Malcolm, Public Works
Director Glen Andler and Deputy Public Works Director Sean Dorsey.
Approval of Minutes of May 25,1999. Motion made to approve the Minutes by Trustee Wilks and
Seconded by Trustee Hoefert. Minutes were approved. Trustee Corcoran abstained.
0=1 -
low
IV W V
IR
0 K AT i
LT, C I
1W
40 40 01
46
ot
Community Development Director Bill Cooney provided an overview of the ongoing
Streetscape Program in the downtown area, the Downtown Redevelopment Projects and corridor
improvements scheduled in the CIP Program. He stated his staff 'is looking at Grant opportunities
for funding assistance for various iprograms including the Streetscape Program. The increases
that are depicted in the CIP for corridor improvements include some monies earmarked for non -
TIF areas. The corridor improvements include creation of templates to identify Mount Prospect
from other communities as people drive into town from other communities. Mr. Cooney also
stated that there is money identified for expenditure for the Village Hall once a decision has been
made.
Fire Chief Mike Figolah provided an overview of three projects that the Fire Department has
major Opts is the conversion of the self-contained breath*
the CIP. One of the ing apparatus to
a newer model w.hich!mee rw rrFire Standards.
Deputy Fire Chief John Malcolm stated that the current air cylinders are nearing the end of their
useful life and there is a need to purchase new cylinders anyway. He stated the change to the
new cylinder with the necessary devices required by National Fire Standards would be
recommended.
There was a., discussion regarding the expansion of the, Northwest Central Dispatch, in relation to
the Village of Streamwood and the Village of Hoffman Estates signing on to the ,Dispatch System.
There was also a discussion regarding the increase im calls generated, through wireless devices
and its 'Impact on Central Dispatch.
Police Chief Ron Pavlock summarized the replacement schedule of the mobile data I terminal
over a five-year period. N i
General comments from Village Board members included thelfollowing items:
There was a discussion regarding the investment of the Village in the entire "Infrastructure and
compare the percentage of annual investment to the overall infrastructure value. There was also
a discussion regarding details of the bridge rehabilitation work. Board members were also
appreciative of the document as a planning tool. There were also comments regarding money in
0
the CIP for a possible widening of Busse Road. Trustees pointed out that even though moriby
may be earmarked for a future year for Busse Road widening, no decision has been made
regarding the status of that road.
Village Manager Mike Janonis stated the Finance Commission had recommended approval of
the 2000.,2011
CIP. He also stated that the Village Hall status is tied to the downtown
redevetbWeot' timing. Staff is currently reviewing options in preparation for discussion with the
Village Board regarding future of the Village Hall.
IMM3=
0
V*
one'.
Vl*
Village Manager Janonis stated that Coffee with Council is scheduled for June 12 from
9:00 a.m. until 11:00 a.m. He also stated that the Farmers' Market will run from June 20 to
October 31. He also stated the 4th of July Carnival will soon be upon us and recommended
residents look in their mailbox for the upcoming issue of the Village Newsletter for a summary of
the scheduled events.
CLOSED SESSION
Motion made by Trustee Hoefert and Seconded by Trustee Corcoran to move into Closed
Session to discuss Personnel. Meeting was adjourned into Closed Session at 8:10 p.m.
1
Meeting reconvened into Open Session at 9:55 p.m.
VII. ADD OURNMENI,
Since there was no further business, the Meeting was adjourned at 9:57 p.m.
Respectfully submitted,
iii
NII
DAVID STRAHL
Assistant Village Manager
DS/rcc
HAGEN\Cow \M1nutes\60899 COW Minutes.doc
K
MAI,NTAIN
Mount Prospect Public Works Department
sit
0 INTEROFFICE MEMORANDUM
TREE CITY USA
TO: VILLAGE MANGER MICHAEL E. JANONIS
DIRECTOR OF PUBLIC WORKS GLEN ANDLER
FROM: VILLAGE ENGINEER
DATE: JUNE 18, 1999
SUBJECT: STONE SHOULDER POLICY
Recently our policy concerning stone shoulders was questioned by residents in the
Golfview Estates Subdivision. Most of the streets within the Village have curbs installed
at the edge, of pavement,, There is, a small, percentage of streets without' curbs. A map
is at,tached whw ich highlight,s, the rion-curbed streets in, Mount Prospect. Our policy is to
repair I existing stone, shoulder or to 1"nstall a 24 wide stone shoulder, whenever a
non -curbed street is included in the resurfacing program. Their specific
concern is
about Glendale Lane. This street was resurfaced in 1998 and a new 24" wide stone
shoulder was installed in conformance with our policy.
The residents on Glendale Lane objected to the presence and the appearance of the
stones. In the fall of 1998, several residents attended a Coffee with Council and voiced
their objections. At that meeting, the Mayor and the attending Council members upheld
the staf-rs policy of maintaining existing stone shoulders and installing stone shoulders
on streets that do not have curb and gutter. Since the residents were not satisfied with
this response, they requested a second meeting,. The residents voiced the following
concerns, atthat April 7, 1999 meetilng which was, held at the Public Works, Facility:
0 Safety Concerns:
*
Lawnmowers may pick up stones and project them at bystanders.
0 Stones that get kicked onto the pavement are hazardous to bike riders,
skateboarders and walkers.
* Visual concerns:
The majority of residents at the meeting prefer the look ofgrass alongside the
edge of pavement rather than the stone edge.
Maintenance concerns:
0 The shoulders need inspections and possibly repair on ayearly basis.
* Snowplows pushed some stone into the lawn areas, which required cleanup by
Public Works.
0I Future concerns:
'01 Greenbriar Lane is scheduled for resurfacing, and shoulder installation this year.
Page 2
Stone Shoulder Policy
June 15, 1999
Staff has addressed the safety concerns of the residents. Last year the shoulders were
installed using stone up to 3/4" in size. That has been removed and a fine aggregate, a
limestone sand type of material, has been installed. This should reduce the flying stone
and bike/rollerblade hazard potential of the larger stone while maintaining the structural
integrity of the shoulder.
The installation of stone shoulders is a standard of non -curbed pavement design.
Attached is a Typical Section of the Resurfacing Program Pavement Improvements.
According to the Paving Textbook "Principles of Pavement Design", "Performance
surveys have indicated that increased pavement performance will result whenever
stabilized shoulders are used." The aggressive paving program the Village has
undertaken and the desire to maximize the pavement life require that staff incorporate
the best design standards in pavement design.
The specific engineering and maintenance benefits of the stone shoulders are:
& Structural benefits:
0 Stone shoulders provide lateral support for the asphalt pavement, which help to
reduce pavement edge cracking.
# As opposed to grassed shoulders, stones shoulders provide better vertical
support for parked vehicles.
10 Unlike grassed shoulders, stone shoulders retain their support properties when
wet.
• Maintenance benefits:
• Stone shoulders are easier and cheaper to repair if damaged. Yearly
inspections and repairs are made.
• Stone shoulders minimize sod damage from plowing.
• Visual benefits:
Stone shoulders help delineate and emphasize the edge of pavement at night
and during rainfall.
• Stone shoulders eliminate the need for pipes and boulders which are used by
many property owners to delineate the pavement edge and prevent rutting of the
grass parkways.
Finally, discussions with Des Plaines and Arlington. Heights indicated that both
Engineering Staffs also consider stone shoulders a standard pavement design feature
of non -curbed streets.
\\PU BLICWORK\SYS2\Fi LES\ENG I NEER\RES U R FAC\RESURF99\CORRES\MEMOJAN3. DOC
Village of Mount Prospect� .
Mount Prospect, Illinois
I I I'm 7*4 "1,, Per" wgA I, f,I Fitt
pil
INTEROFFICE MEMORANDUM
TOW MAYOR GERALD L. FARLEY AND BOARD OF TRUSTEES
FROM: TRUSTEE PAUL WM. HOEFERT
DATE: JUNE 18, 1999
SUBJECT: MOVING THE GENERAL STORE AND CREATING A
DOWNTOWN POCKET PARK
This memo serves as an update and expansion of the memo I sent to the Board on
May 17.
We have discussed various outcomes for the General More over the past year as
property acquisition has occurred and redevelopment of the Northwest Highway
frontage has gotten closer. With redevelopment now imminent, a final proposal to "save
the General Store" has been generated which centers around moving the building from
its current location to the Village -owned lot on Pine Street. Once relocated, the building
would be renovated, inside and out, and begin its next 100 years as a living, usable
structure. The following outline summarizes the major points of the proposal and is
meant to be used as a basis for discussion by the Board at the June 22, 1999
Committee of the Whole meeting. Also included with this memo are two articles
detailing similar projects in West Dundee and Itasca.
Vacant Village -owned triangular shaped lot bounded by the Tri-State
Electronics parking lot to the south, the ComEd substation to the north, and
Pine Street to the east.
Kurt Muehlfelt, of J. C. Muehlfelt & Sons Building Movers in Wheaton, has
inspected the building. He has indicated that the building is solid and straight
and easily able to make the short move to Pine Street. He estimates the
move, itself, at $25,000-$30,000. 1 have attached a list of 35 moves made by
Muehlfelt & Sons since 1983 (Exhibit #11). 1 believe Muehlfelt to be a highly
reputable, skilled and insured building mover. Many of their moves were
done f& municipalities and, as such, will provide an excellent basis for
reference checks.
..... . .. .
• District 214: Forest View Vocational School Program
• Maryville Academy: Nipper School Vocational Program
• Home Depot: Volunteer support (project oriented)
At this point, Edward Hines Lumber, Home Depot and Menard's have offered
support of the project through donations of various building materials needed
for the renovation such as drywall, lumber, shingles, siding, conduit, etc. I am
confident that numerous other businesses in the Village would support this
project, as well.
. ........ . it,
• Keith Youngquist has offered to provide architectural support to the project as
needed.
Foundation
Norwood Builders has offered to form up and pour the new foundation when
they pour for the new condominiums on the Northwest Electric site.
• While there would be obvious oversight by the Building Department and
Inspection Services during the renovation, management of the overall project
could be a burden. As such, I would recommend that a local resident,
possibly a senior citizen with experience, be hired to perform, manage and
coordinate theproject. We may have a number of people in the Village that
could do this work. One person who comes to mind is Walt Rutkowski who
did an outstanding job as project manager for the Mount Prospect Historical
Society's Dietrich Friedrichs House Museum renovation. I have spoken to
Walt and he is considering the position. I would suggest that the individual be
paid a nominal hourly rate.
Time Frame
• 1 would anticipate the move to occur sometime in mid -summer thereby
IS w0uld clear the way for
removing the building from its current locaflon., Th'
redeve1opment of the Northwest Highway frontage which, from the latest
estimates, will begin in the fall of this year, or, early spring 2,000. This timing of
the move will have the General Store in place at its new location in time to
begin renovation 'at the beginning of the school year.
0)
Exterior: I would recommend that the exterior of the building be renovated to
look much as it did at the turn of the century with any additional or
modification to be made in keeping with the look of that era.
Interior: I would suggest that the interior be remodeled into an up-to-date
space for an office/professional use.
• Once renovated, the building can be leased as an office or professional
space. Interest has been expressed in this type of use.
The existing building is approximately 1,500 square feet on the first and
second floor not including the basement. Using a reduced cost per square
foot, given the donations of labor and materials, it is estimated that the all in
costs to move and renovate the building would be approximately $100,000*.
This includes a small addition on the rear of the building for ADA accessible
washroom facilities. In an effort to reduce costs, interior renovation could be
limited to the first floor. This would save approximately $20,000 reducing the
cost of the project to $80,000**. Additionally, the home at 15 North Wille
behind Northwest Electric which the Village now owns and is to be torn down
to make way for the new condominiums has a newer furnace. It is possible
that this furnace could be removed and used in the General More saving
approximately $2,000.
Given that the Board had committed approximately $50,000 in equity support
for the Saewert plan, I feel that the Village's underwriting of these costs could
be considered to be both reasonable and appropriate.
Tull Renovation
1,500 square feet x $25 per square foot $40,000
Cost to Move 30,000
Washroom Addition 20$000
Miscellaneous 10,000
91
'First Floor Renovation
750 square feet x $25 per square foot $20,000
Cost to Move 30,000
Washroom Addition 20,000
Miscellaneous 101000""
I would propose that the remainder of Ten South Pine property be made into a
downtown, passive pocket park with brick paver walkways, park benches and
landscaping. A Site Plan is attached (Exhibit #2). In addition, I would suggest that the
ComEd substation which is an obvious necessity, but an unfortunate eyesore, be
fenced with a new wooden fence and appropriate perimeter landscaping. This would
certainly be a specific benefit to the residents of Clocktower as well as the surrounding
businesses and would help beautify the downtown in general. Com Ed is being
contacted by staff to assist with the 'Construction and/or funding of these improvements
around the substation. As a note, given the proposed position of the General Store on
the northern edge of the Pine Street property, the building itself will block the view of the
substation for many of the Clocktower residents in the southern most condominium
building, as well.
I believe this framework provides a viable plan to save the General Store and a solid
basis for our Committee of the Whole discussion.
`JO,�u� � orY� . � ��CI
PAUL WM. HOEFErxI vtoco)
Village Trustee
11
DailYflerald,
SUB
Friday, June 4, 1999
UM
lEst
on1c
l
ic,hoo
s
just� st
By KATE CLEMENTS
My Herald Staff Writer
Mary Reber wiped tears from her
eyes as a crew of men and
machines moved the Centerville
schoolhouse across the street to its
new home in Randall Oaks Park
Thursday inorn, big.
"I never thought it would affect
me like this," the West Dundee resi-
dent said. I can't believe this.",,
. The, oldone-roorn schoolhouse,
where Reber a�ttended grades one
'Ulu, , ough three in the Mid1940s,,was
o,
g,to betorn down'to make roo
, t
for two additional lanes of Randallm
Road.
"Hearing of the histon'c", buildings,
hmm'ent dermise, a grou,7 i Of, coM, -
InttWty members, spm ig,� nto action
'to give, the Schoolhouse a,, newt life.
Built in 1884 southeast of Randall
and Bm*m'e roads, Centerville was
used as a one -room schoolhouse for
stuadents, wi, first through eighth
des
't' '94 It was then con-
Fd
d to a n to I reslidence, said.
ee P'Historx'cal Soci-
�owns
ety President Marge Edwards.
Kane County board member Don
Rage threw his support behind the
moveto savel't and managed, to"
convince, s eofleagues on the!
board, to supply,, $99,000mi river oat
fun&, to pay, for the relocation and
thelbulk, of the restoration,
The Dundee Tomaishlip, Park D1S,_
trict agreedto(donate space in
daU Oaks Park for the school's new,
home.
Supl)orters, ofthe project gati'll-
ered at the Pat* Th=day morning,
i
cameras, "i, hand, to celebrate, tlxilf�
success and watch the building be
mounted on a truck and moved out
of the way of the bulldozers already
at work on the Randall Road expan-
sion.
Rage was struck by the contrast
of Pro ss, and preservation.As,
the ra=* ation of the am"a moves
forward and the road expands to
handle more traffic, a piece of histo-
ry is being saved, he said.
The Dundee Township Historical
Society, with the help of the Dundee
Township Park District and a slew
of volunteers, is planning to restore
the building to the way it looked in
the early 1900s.
The building will be used for
School tours, living history pro -
1s, natureelasses and other
k dis-trict, and historical, society
programs, Edwards said.
"We had so much fun here," said
Arnie Lauber of St. Charles, who
was a student at Centerville in the
late 1940s. "Now it's going to be
saved for generations to enjoy."
Renovation work on the school is
far from over.
The historicalsociety is looking
for vol untee rs to, help; t the
inside and outside of the building,
demolish non -historic interior
walls, do plaster work, floor work
and more.
Edwards is looking for antique
desks, blackboards and other fur-
nishings to complete the look Pho-
tos of Centerville School from 1903
are helping to guide the renovation,
she said.
To donate money, time or
antiques to the project, contact the
Dundee Township Historical Soci-
ety at 426 Highland Ave. in West
Dundee.
Traffic was halted for about 15 minutes Thursday morning on
Randall Road in West Dundee while a tractor pulled Centerville
School across the road and Into Randall Oaks Park.
Daily Herald Photos/George LeClair(
ir W1#
� Onc,
"I St al emmm ss
stlives Lo s,ave,, h1ouse
By LESLIE CUMMINGS
Daily Herald Staff Writer
He was the first,ftasca village
president ,and", postmaster.
fle A.G. Chessman may be long
gone.,,, his house remains.
Now the village h 'istorical comn-fis-
sion would like to make
sure Chessman's house continues to
be part, of the village's heritage.
The house, on 'Tho dale Avenue
just east of Prospect Road, is on
ComEd property. The commission
hopes to move it to a different Itasca
location and restore it.
"We'd love to save the house if
poss')
*,btel," Commissioner Joyce
Usher said
.
"But right now we are just trying
to get an iii, onto that Com,Ed
property to check out the house and
see what kind of condition it is in,"
Usher szdd.
The house looks a bit run-down,
she said. I
"We want to. find out if the struc-
ture is even stable enough to be
moved," Usher said.
Chessman settled in the village,
then known as agone, in the 1,840s.
He ran the post Office out of
his hoit:se for many, Years. He was
eleeted village president in 1890.
Ifthe house "'IS movable, the, h1s,tol'..-
ical, commissiozi, plans to ask the vi1
]age,, board to desligiiatethe building
as a histon'cal lapdmark'.
The designation would give the
building spiCialstatus, which would
prevent it fivmbeIng destroyed.
The status also woidd help
the, co,inmission o,bt:a,jn, grants.
to play for the move and restoration.
"We hope to move it somewhere
where it could have multiple uses.
We could move, it somewheret along
the biqycle path, and, 11t, could be like
a rest stop for people," Usher
said. "Maybe we'd put a museum to
The Itasca Historical
Commission seeks to relocate
and restore the A.G. Chess-
man house on Thorndale
Avenue just east of Prospect
Road. Daily Herald Photo/Tanit Jarusan
Chessman inside. But we have to
put the house in a place where we
know it won't be vandalized."
The commission wants to return
the house to "its on' inat look.
When the house wz;ts bui'l,tt itwas
coni dered ati. expensive wid,stylish
rei
st
deti,ce,
111,t is, a prairie -style house,, but it
was very nieein its t, 'me Usher
sad
I'it it were to be restored,, it
wouid, be very be a"utim''Ll'
The commission has been infor-
rnally, questioning Itasca residents
and gt,-,ou,.ps,a,l�ot,itwl,,iether they, sup -
poll" sal ingthe house,
"We've had a very enthusiastic
response," Us,ber said, "'Everyone
sees a greatreason forsiaving it "' 11,
do
e n't want to see ffiris go( the
way of Elijah Smith's, (the village
fowide,r) house,," she -said.
"There was ititerest in saving it,
but no one wotil' ' d, donate the land
where we could put it, so it was
demolished," Usher said.
7096681586 NUEHL!ELT 952 P02 MPY 11 '99 16:56
J,
Eff
INC. 0�S
HOUSE MOVING
Mor"bOrJAIM
J,,C. MUEHLFELT &SONS, INC,,
O 53 Gqry -Ave,Hue, Wheat,on,, IL 6018 7
Phe (6 0) 668-1439 Fox (630) 668-1586,
Established In 1927
JOB HISTORY
EXHIBIT #1
12/98 Harry W Kuhn. Relocate:32'wide utility building 8 miles down Rt 38 and Rt. 64 to their and.
10/98 Plote -Dick -Webber. Relocate, 30'x60r building for the'village of South [3arn'ngton.
09198 Fermilab. Relocate buildings Within Ferm. !lab property.
04/98 City ol`Glenviw Move 120 tor' house from South side of Glenview Naval Airbas6 to the
north side,.
04/98 Lombard His-'ton%cal Society.Repface wood be In historical house.
12/97 Envirocon. seise and shore u ' I
p buildAngs, for radioactive cleanup in West Chicago.
1997 Elmhurst Memorial Flo-spftal. Relocate -3 new homes.
07/96 Franklin Park - Mayor Dan Pritcheft. Relocate - B12 railroad tower.
04196 Naperville S'afi?ty Town - Mayor George Pradel. Move railroad caboose to site.
06/95 Greg Lits. R61ocate historical Stacy Mansion.
03195 Roberta Tyns'ki. Relocate historical house. The mute being through downtown Nciperville.
10/34 Le)dngt,o,n Homes - Dick Lamb, Construction Manager. Move three model trailers that were
connected side by side.
08/94 John & Patricia Myeftki. Move a 120year old, three story house through downtown Glenco.
07/94 Joseph Corp. Move a two story house in Aurora.
1
07/93 Greg Watts. Move a tri -level house in Arlington Heights.
05/93 Altovian Builders. Move two houses in Lake For'est
70866el586 NUEHLFELT
Ely
INCO
HOUSE MOVING
100
952 P03 NA"y' 11 '99 16: 56
JOB HISTORY - PAGE 2
03/93 Schaumburg Park District Move a solid stone smoke house. The stone walls were 24" thick.
10/92 John Surin, Architect. Warren Tavern restoration, Warrenville.
08/92 Christine Poll, Preservation Planner. Kane County Development.
08/92 Mr. & Mrs. Randy Hultgren. House move in Wheaton.
07/92 Marvin Worlet, Architect. Oak Park Residence Corporation.
11/91 DuPage Airport Authority. Williams and Pollack, Architect. Move McChesney two story house
with solid 12" brick walls.
10/91 Mrs. Eve Johnson, Garfield Farm.
08/91 Streamwood Park Distftt
12190 Anthony Bonavolouta. Roselle Historical Society.
09190 Naperville Historical Society.
11/89 Mrs. McNeil. Patch House in Glen Ellyn.
09189 McChesney''House and roof, Glen Ellyn.
08/88 Illinois Railroad Museum, Union.
03/88 McHenry C. ounty Historical Society.
11/87 Dunham Hunt Preservation Society.
06/86 Lombard Historical Society.
1984 Wight & Co., Architect. Stateville Correcdonal Center. Move concrete block guard house to
park grounds.
02183 Winfield Histoftal Society,
1983 Wasco Railroad Station for the American Legion.
01 1;
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: MAYOR FARLEY AND VILLAGE BOARD OF TRUSTEES
FROM: ASSISTANT VILLAGE MANAGER
DATE: JUNE 15, 1999
SUBJECT: VILLAGE Y2K PREPAREDNESS PLAN
Enclosed is a packet of material highlighting the work of the Village Y2K Task Force over
the last several months. A summary of the material included in the Y2K plan includes the
following:
• Y2K Response Plan Outline
• Y2K Response Plan Report
• Draft of the Special Y2K Newsletter for Residents and Staff
Memorandum from Deputy Public Works Director summarizing potential expenditures
for back-up generator rental and identifying Village buildings for which additional wiring
may be required to take advantage of generator usage.
• Draft of a letter from the Village Manager to Village employees describing the Village
Y2K Response Plan.
The Task Force discussed numerous potential scenarios due to Y2K, but many of the
services the Village provides directly to residents are limited. The potential for service
disruptions by utilities is a possibility, however, the Village has no impact on addressing
Y2K plans of external service providers. The Y2K issue has been on the minds of many
people for a lengthy period of time, and the fact that businesses have been preparing
contingency plans to respond to service needs does raise the level of comfort, but since
no one can predict exactly what might occur, the Village plan focused on providing core
Village services based on realistic resources. The Task Force also created a
communications apparatus to respond to questions and concerns of residents so that
emergencies and other service needs can be addressed. Generally, the sincere hope is
that little or nothing will occur during the Y2K weekend, but we are confident that the
Village is prepared to respond nonetheless. I
VILLAGE Y2K PREPAREDNESS PLAN
June 15, 1999
Page 2
It would be nearly impossible to prepare for every eventuality within realistic budget limits,
however, the information attached is quite comprehensive and is designed to address
major concerns. Hopefully, residents will prepare for the Y2K weekend utilizing the
suggestions in the special newsletter so that the Village response necessary to assist
residents will be minimal.
E
c*: Village Manager Michael E. Janonis
Y2K Task Force Members
H:\GEN\Y2K\Y2K Plan Cover Merno.doc
MAYOR
Gerald L. Farley
VILLAGE MANAGER
Michael E. Janonis
TRUSTEES
Timothy J. Corcoran
Paul Hoefert
0
V ""
ILLAGE C
VLERK
Velma "we
Richard M. Lohrstorfer
Daniel A. Nocchlu8/818-5
ommunity Development partment Phone: 47 328
Michaele W. Skowron
Irvana K. Wilks
Fax: 847/818-5329
100 South Emerson Street Mount Prospect, Illinois 60056 TDD: 847/392-6064
i.
AGENDA,
MOUNT PROSPECT ZONING BOARD OF APPEALS
MEETING LOCATION.* MEETING DATE & T.IME
Senior
Center Thursday
50 South Emerson Street June 24, 1999
Mount Prospect, IL 60056 730 p.m.
I.
CALL TO ORDER
Ii.
ROLL CALL
Ill.
APPROVAL OF MINUTES — Minutes of May 27,1999 meeting
A. ZBA-05-99 401 Larkdale Lane
B. ZBA- 12-99 716 Prospect Manor
C. ZBA- 13 -99 Hobby Lobby
D. ZBA- 14-99 31 S. Helena Ave
E. ZBA-15-99 307 N. School Street
IV.
OLD BUSINESS
VW,
NEW BUSINESS
A. ZBA- 1 -991 Village of Mount Prospect 1Text Amendments
B. ZBA- 17-99 601 S. Louis St./ Variations to permit construction of driveway and
patio that would exceed maximum of one driveway per single -family parcel and
the maximum lot coverage prescribed by Zoning Code
C. ZBA-18-99 / 105 E. Prospect Avenue / Conditional Use and Variations to pennit a
PUD for construction of a 5-unit townhouse development
NOTE: All Above Cases are Village Board Final
VI.
QUESTIONS AND COMMENTS
VIL
ADJOURNMENT
ZBA CASE NO, ZBA-05-99 Hearing Date: May 27, 1999
PETITIONER: David Jackolin
401 Larkdale Lane
Mount Prospect, IL 60056
PUBLICATION DATE. May 12,1999 JOURNAUTOPIC S
It
REQUEST. Conditional Use to construct an unenclosed porch within 25 feet of the front
property line.
MEMBERS PRESENT: Arlene Juracek, Chairperson
Leo Floros
Ronald Cassidy
Elizabeth Ixem
Richard Rogers
MEMBERS ABSENT: Marshall Pend
STAFFMEMBERS PRESENT: Michael Blue, AICP, Deputy Director of Community Development
Jeffery Perkins, Planner
0
INTERESTED PARTIES, David Jackolin
Jennifer Jackolin
Irene Lessnau
Richard Lessnau
Chairperson Juracek introduced Case No. ZBA-05-99, a request for Conditional Use approval to construct a
unenclosed porch within 25 feet of the front property line, at 7:43 p.m., and asked if notice of the case had bee
given.
11! 0
Barbara Swiatek, Planning Secretary, stated that public noti"ce for this case had been given in the form of a
newspaper legal ad, signs posted at the property, and a mailing to property owners in the 250' surrounding area.
0
Mr. Perkins then 'Introduced the staff memorandum for the item. The subject property is an existing house on
comer lot 'in a single-family residential neighborhood. The home is currently set back 3 V from the front lot lin
and meets the minimum front setback requirement. The applicant proposes to construct a second floor addition th
'11 meet setback requirements'and an unenclosed porch across the entire front and west sides of the house.
wi Th
�11
porch is approximately six feet (6) deep. The portion of the porch on the west side of the structure will meet a
setbacks.
The petitioner 'is seeking a Conditional Use to allow the portion of the porch addition along the front of the
structure to encroach 5 ' "Into the required front yard. The porch would be attached to the front of the existing home
and set back 25' feet from the front property line. The petitioner states that the proposed front porch is necessary to
"tie-in" the proposed second story addition with the existing structure and improve the appearance of the finished
structure, N
0
Mr. Perkins summarized staff s findings regarding the Zoning Code Conditional Use standards. The propose
additions will meet all zoning requirements except the encroachment of the porch into the front setback that is thl-
Zonl"ng Board of Appeals ZBA-05-99
Arlene Juracek, Chairperson Page 2
subject of the Conditional Use petition. The proposed porch is part of a large addifion to the exisfing structure that
will enhance its appearance and value. The proposal would have limited negative impacts on the adjacent area,
utility provision or public streets. The proposed Conditional Use will be in compliance will the Comprehensive
Plan'. would not alter the essential character of the neighborhood, and would not have any significant effect on the
public welfare.
Mr. Perkins gave staff s recommendation, based on those findings, that the Board make a recommendation to the
Village Board to approve the proposed Conditional Use. He informed the ZBA that the �Vfllage Board's decision is
final for this case.
Mr. Floros askedMr. Perkins if 'the proposed addition was actua Ily to be on the east side of the existing structure
9 1
and 'if there would be living space above the garage. Mr. Perkins said there would be and, yes, the addition wou la
be on the east and north sides.
With no further questions for Mr. Perkins, Ms. Juracek asked the petitioner 'if he would like to speak
IF 1W
OW
lot
Leo Floros made a motion to Approve the request for Cononal Use approval for the construction ot an
unenclosed porch within 25 feet of the front property line, seconcied by Elizabeth Luxem.
UPON ROLL CALL: AYES: Cassidy, Floros, Juracek, Luxem, Rogers.
Motion to approve was approved 5-0.
The ZBA heard four more cases. Leo Floros made a motion to adjourn, seconded by Richard Rogers. The motion
was approved by voice vote. Meeting was adjourned at 8,-58 p.m.
H:\GEN\PLNG\ZBA\ZBA 1999\Minutes\ZBA-05.99 Jackolin (401 Lar dale Lane),do
MINUTES OF THE REGULAR MEETING OF THE
MOUNT PROSPECT ZONING BOARD OF APPEALS
CASE NO. ZBA-12-99 Hearing Date: May 27, 199t
PETITIONER: David Kennebeck
716 N. Prospect Manor
Mount Prospect, IL 60056
PUBLICATION DATE: May I2, I999 JOURNAUTOPICS,
REQUEST: Variation to permit a 768 square foot garage 3' from the property linj
MEMBERS PRESENT: Arlene Juracek, Chairperson
Ronald Cassidy
Leo Floros
Elizabeth Luxern
Richard Rogers
MEMBERS ABSENT; Marshall Ponzi
STAFFMEMBERS PRESENT: Michael Blue, AICP, Deputy Director of Community Development
Jeffery Perkins, Planner
INTERESTED PARTIES,0 David Kennebeck
Cindy Kennebeck
Bob Foley
Wes Carlson
Pat Foley
W Ir 41
Chairperson Juracek introduced Case No. ZBA-12-99, a request for a I variation to permit a 768 square foot
garage 3' from the property line at 7:53 p.m. Ms. Juracek opened the public hearing and *inquired if notice
of the case had been giv en.
10
11tarbara Swiatek,
pPlanning Secretary, stated that public notice for this case had been given in the form of a
newsaper legal ad, sigg ns posted at the property, and a mailinto property owners in the 250' surrounding
area.
Mr. Perkins then introduced the staff memorandum for the item, •a proposal for a Variation to the maxl*mum
size and setback requirements for garages to allow construction of a •768 square foot garage setback 3' from a
interior side property line. The subject property 'is an existing home in a resiaential neighborhood. The
home currently has a 20' X 22' two -car garage with a 1.5' setback from the property line. The petitioner i's
seeki*ng to replace the exiting garage with a 768 square foot two -car garage, The Zoning Code sets the
maximum size for detached garages at 600 square feet and the minimum setback at five feet. The petitioner
is seeking Variations to allow the proposed garage to exceed the 600 square foot maximum size requirement
And to be 3' from the lot line.
0
Mr. Perkins summarized staff s findings regarding the Zoning Code Variation standards. The reasons for the
proposed variation are primarily for the convenience of the petitioner, rather than financial. The petitioner
proposed the oversized garage to accommodate a camper and a workroom. Although the garage 'i's somewhat
the character of the neighborhood — a single-family residential area would not be affected by the
oversized,
proposed variations, nor would the proposed variations have any significant effect on the public welfare.
Zonl*ngBoard of Appeals ZBA- 12-99
Arlene Juracek, Chairperson Page 2
The subject parcel 'is a rectangular 8,544 square foot parcel that is relatively 1"0 1 9pt of any flood zone, and
developed With a single family home and a detached garage. No particul -nakcs the
cow n
ar of the lot i
proposed 768 square foot garage necessary. The petitioner simply wou h=
Id like to a larger garage tnan in
permitted by code. This is not sufficieftt justification for a Variation by the above standards.
The petitioner states that the proposed 3' setback forlhe garage is necessary with the. larger garage because
maneuvering a vehicle into,the proposea garage would be'diffilbult if the required setback is - met. However,
the proposed garage is 26' behind the structure and a standard two -car garage could be over 30" behind the
structure. Those distances would appear to leave ample room tamlaneuver most vehicles into the garage.
Therefore, no hardship exists for the subject parcel.
Mr. Perkins then gave staff s recommendation that the ZBA make a recommendation of dental of the
proposed Variations, based on the lack hardship and i rme
finNl for this case. nfo i clthe ZBA that the Village, Board's decision is
Mr. Bob Foley, 7151 Prospect Manor was sworn in. He statect lie was the neighbor who,
would, be looking at
the
'*&it_was, necessary totbuild it garage and Khe approve& wholeheartedly of the plannedfhew gafage� He sai
in the proposed space because the old garage is rottin& away because it i's always wet and muddy around that
area.
Mr. . Kennebeck po inted out that -all the dr s ack yard and the two objecting owners
ainage remain innIS b
homes were two stories high and would not be blocked by his garage.
Ms. Juracek called for a motion and read 1he standards for hardship to the Board. Mr. Cassidy said the
0
hardship was that the garage was rotting away and the petitioner needed a new garage. Mr. Rogers again
stated hewould be against changing the location of the garage and Iosing the old Ma
ple tree. Ms. Luxem,
pointed out the garage would be deeper, not wider, and would not affect the neighbors to the rear. Ms.
Juracek summarized Board members' comments and said the advantages 'would outweigh any perceived
disadvantages. I
I
aa 176&� square foot
ssidy made,a motion �Ao approve�Ahe request for�_Variation for the constructiom�of%
garage 3 feet from a side property line, seconded by Mr. Floros.
UPON ROLL CALL: AYES.- Cassidy, Floros, Juracek, Luxem, Rogers
NAYS: None.
H:\GEN\PLNG\ZBA\ZBA 1999\Minutcs\Z8A- 12-99 Kennebeck (716 N. Prospect manor),,doc
Zoning Board of Appeals
Arlene Juracek, Chairperson
Motion to approve was approved 5-0.
ZBA-12-9%
Page 3
The ZRA heard three more cases. Leo Floros made a motion to adjourn, seconded by Richard Rogers. ThIl
motion was approved by voice vote. Meeting was adjourned at 8:58 p.m.
H:\GEN\PLNG\ZBA\ZBA 1999Unutes\ZBA- 12-" Kennebock (716 N. Prosped manor).doc
CASE NO. ZBA-13-99 Hearing Date: May 27, 199 .1,
PETITIONER: Patrick McCune
for Kirrico Realty
5737 Bigger Road
Dayton, OH 45440
PUBLICATION DATE: May 12, 1999 JOURNAL/TOPICS
REQUEST: Conditional Use Approval for an amendment to an existing Planned Unit
Development to permit construction of a 26,113 square foot building addition
to an existing shopping center.
MEMBERS PRESENT: Arlene Juracek, Chairperson
Ronald Cassidy
Leo Floros
Elizabeth Luxem
Richard Rogers
0
MEMBERS ABSENT, Marshall Ponzi
STAFFMEMBERS PRESENT,* Michael Blue, AICP, Deputy Director of Community Development
Jeffery Perkins, Planner
a
INTERESTED PARTIESS Patrick McCune
Patrick Rooney
Norm Johnson
Chris Perry
Chai*rperson Juracek introduced Case No. ZBA-13-99, a request for a Conditional Use approval for an amendment
to an existing Planned Unit Development to permit construction of a 26,113 square foot builffing addition to an
existing shopping center, at &: 16 p.m.
Ms. Juracek opened the public hearing and inquired if notice of the case had been given.
Barbara Swiatek, Planning Secretary, stated that public notice for this case had been given 'in the form of a
newspaper legal ad, signs posted at the property, and a mailing to property owners in the 250' surrounding area.
Mr. Perkins then 'Introduced the staff memorandum for the 'Item, a proposed P.U.D. amendment to the existing B i
K -Mart shopping center. The modification would permit a 26,113 square foot building addition that would b
combined with the space currently occupied by the Payless and vacant space to house a 55,051 square foot Hobb
Lobby store. The addition would be built to the north of the existing structure, extending into an existing parkin
lot that 'is 'in poor condition and seldom used. The existing center contains 167.,321 square feet of retail space wit
the 130,017 square foot Big -K store as the principal tenant, Kentut. I Kyrried Chicken franchise and Enterprise Ca
Rental as secondary tenants. A portion of the remaining retail space is currently occupied by regional busines,
offices for Payless Shoes. The Payless offices would remain in operation during construction and vacate whe
construction 'i's complete.
[Mr. Perkins described the proposed site plan for the item. The proposed addition would maintain the current 76'
rear and 434" front setbacks provided for the existing structure in that area. The side setback would be
0
approximately 111'. The parking and driveway areas adjacent to the addition would retain their existing 10'
Zoning Board of Appeals ZBA-13-
Arlene Juracek, Chairperson Page 3
Ms. J'uracek asked 'if Kimco owned the entire shopping center. Mr. McCune said they owned the entire center.
However, the parcel at the northeast corner of the site is separate from the center and under separate ownership. He
stated that Kimco has attempted to purchase the parcel but has been unable to do so.
I
Mr. Norm Johnson, 601 Huntington Commons Road, was sworn 'In. He stated that he had no objections to the
proposed development but wanted to caution the petitioner that large rains may cause flooding in their store.
Ms. Juracek asked what were Kimco's objections to the landscaping condition. Mr. McCune said the 250' of shru
buffer zone was the objection. Kimco would prefer using trees at 75' rather than ornamental ground cover.
Board members said they thought the buffer area would not be necessary since there is a large grassy area an
private residences are 250away.
Richard Rogers made a motion to amend the landscaping condition to require trees at 50' intervals, seconded b
Elizabeth Luxem.
UPON ROLL CALL: AYES: Cassidy, Floros, Juracek, Luxem, Rogers.
NAYS: None
Moto
ion was approved 5-0.
Richard Rogers then made a motion to approve the proposed Planned Unit Is Development modification with thil
conditions set forth in the staff report, as modiffied by the above mofion, seconaed by Leo Floros.
'4PON ROLL CALL: AYES: Cassidy, Floros, Juracek, Luxem, Rogers.
PLYAV&J
0_ §NL$ITI
Inq I I I I Ino I
The ZBA heard two more cases. Leo Floros made a motion to adjourn, seconded by Richard Rogers. The motion
was approved by voice vote. Meeting was adjourned at 8:58 p.m.
H:\GEN\PLNG\ZBA\ZBA 1999\Minutes\ZBA-13-99 Big -K (1550 S. Elmhurst Road).doc
CASE NO, ZBA-14-99 Hearing Date: May 27, 1999
0
PETITIONROEDonald S. Craig
160K Bateman Rd.
Barrington Hills, IL 60010
PUBLICATION DATE. May 12, 1999 JOURNAUTOPICS
REQUEST,4, Map Amendment* from RX Single-family Residential to RI Sm*gle- tatnily
Residential for two parcels located at 3 10 S. Helena Avenue and 23 15 White Oak
Street
0
MEMBERS PRESENT, Arlene Juracek, Chairperson
Ronald Cassidy
Leo Floros
Elizabeth Luxem,
Richard Rogers
MEMBERS ABSENT. Marshall Ponzi
STAFF MEM13ERS PRESENT,o Michael Blue, 'Atc, Director of Community Development
10puty I
Jeffery Perkms�,Plon�t
INTERESTED PARTIES: Donald S. Craig
Chairperson Juracek introduced Case No. ZBA-14-99, a request for a Map AMe , a from RX
dment
Residential to R1 S ingie-ram, fly Residential for two parcels located at 3 10 S. Helena and 23 15 Wh i
at 8:45 p.m.
Ms. Juracek opened the public hearing and "Inquired if notice of the case hae
d been *
givn.
fo
Barbara Swiatek, Planning Secretary, stated that public notice for this case had been iven in the form of
newspaper legal ad, signs posted at the property, and a mailing to property gowners 'in the 250' surrounding area. I
Mr. Perkins then introduced the staff memorandum for the itern, a proposal to rezone two parcels from RX to R
Single-Farnifly Residential. The rezoning would allow the peoner to build r« residence on one of th -
parcels and bring the single-family residence on the other parcel 'Into compliance with zoning requirements. H
informed the ZBA that the subject parcels were annexed into the V1*114ge in 1986 and zoned RX pursuant to thi,,
requirements of the Illinois Statutes.
The existing single-f=4,;*j4�ocp meets all RI zoning district bulk regulations, except for a patio in the side yard
which encroaches onto Ib -0 V�4t4bt parcel. That encroachment will have to be removed prior to construction of a
residence on the vacant parcel. The vacant parcel contains a shed serving the north parcel. That shed would be a
legalaccessory structure to a residence constructed on the parcel and could remain if the owner chose to do so.
Proposed development of the south parcel 'i's a singie-tarnifly residence, which would not ordinarily be reviewed by
the ZBA. Submission ofp lans meeting all pod
rovisions of the Zning Orinance, Building Code, and Development
Code will be a requirement ot wilding permit issuance.
The property Is identified as Single Family Residential in the Village's Comprehensive Plan, •as are all parcels in
the existing single-family neighborhood surrounding the site. The proposed residential zoning and residential
Zoning Board of Appeals ZBA- 14-99
Arlene Juracek, Chairperson Page 2
structure are compatible with these designations. Although much of the property in the area is zoned RX, the
houses were built with development standards more similar to RI. The properties to the west of the subject parcels
were rezoned to RI last year. The proposed RI zoning district and the proposed use of the parcels will be
compatible with surrounding land uses and zoning districts. The parcel is suitable for the proposed use and the
proposed single-family residence will be complementary to similar uses located in the vicinity.
Mr. Perkins then informed the ZBA that the Village Board's decision is final for this case and gave staff's
recommendation that the ZBA make a recommendation of approval of the proposed Rezoning, based on positive
findings with respect to the Map Amendment Standards of the Zoning Code.
Mr. Donald S. Craig, 160K Bateman Rd., Barrington Hills, IL was sworn in. He stated that he had nothing to add
x.
to what Mr. Perkins had told the Board, except that he was willing to move the patio and retain as many trees as
possible.
ossl
Ms. Juracek asked if this project would be incorporated into his Douglas project of the previous year. Mr. Craig
said it would.
Mr. Rogers made a motion to recommend approval of the requested Map Amendment from RX to RI for the
subject properties with the condition included in the staff report, seconded by Ms. Luxem.
UPON ROLL CALL: AYES.- Cassidy, Floros, Juracek, Luxem, Rogers.
NAYS: None
Motion to approve was approved 5-0.
The ZBA heard one more case. Leo Floros made a motion to adjourn, seconded by Richard Rogers. The motion
was approved by voice vote. Meeting was adjourned at 8.-58 p.m.
CASE NO. ZBA-15-99 Hearing Date: May 27, 1999
PETITIONER: Anthony Scaletta
307 N. School St.
Mount Prospect, IL 60056
PUBLICATION DATE.
May 12, 1999 JOURNAL/TOPICS
REQUEST* Conditional Use to permit the addition of an unenclosed front porch within 25' of
the front property I m*e
MEMBERS PRESENT: Arlene Juracek, Chairperson
Ronald Cassidy
Leo Floros
Elizabeth Luxem
Richard Rogers
MEMBERS ABSENT., Marshall Ponzi*
STAFF MEMBERS PRESENT: Michael Blue, AICP, Deputy Director of Community Developmen�
Jeffery Perkins, Planner
Kathleen Scaletta
Louis Goodman
Chairperson Jumcek introduced Case No. ZBA-15-99, a request for a Conditional Use to permit the addition of a covered
front porch within 25' of the front property line at 8:50 p.m.
Ms. Juracek opened the public hearing and *inquired if notice of the case had been given.
Barbara Swiatek, Planning Secretary, stated that public notice for this case had been given in the form of a
newspaper legal ad, signs posted at thp. property, and a mailing to property owners in the 250' suffounding area.
0
Mr. Perkins then 'Introduced the staff memorandum for the 'item. The subject property 'i's an existing home located
on a singie-tam fly lot on a residential street. The part of the house where the porch 'i's proposect is set back 3 3' 5 VV
from the front lot line and meets the minimum front setback requirement. The applicant proposes to construct an
uncovered front porch approximately eight feet (8') deep by 17 wide. The porch will meet side setback
requirements.
The subject parcel for the proposed Conditional Use 'is for a single-family home in a singie-tamily neighborhood.
The proposal i's for the addition of a small, uncovered porch that extends five feet (5) into the front setback. The
small size of the porch and the fact that it is uncovered will ensure that it will have little visual impact on the
neighborhood. The proposed development would have no 'Impact on utility provision or public streets. The
proposed Conditional Use will be 'in compliance will the Comprehensive Plan and the Zoning Ordinance
requirements. The essential neighborhood's character — a single-family residential area — would not be affected by
the proposed Conditional Use and the Conditional Use would not have any significant effect on the public welfare.
Mr. Perkins then informed the ZBA that the Village Board's decision 'is final for this case and gave staff'
M that the ZBA make a recommendation of approval of the proposed Condonal Use, based o
p, itive findings regarding the Zoning Ordinance's Conditional Use standards.
osi I I I I i
Zoning Board of Appeals
Arlene Juracek, Chairperson ZBA- 15-99
Page 2
Mr. Anthony Scaletta was sworn in. He stated that he and his wife have resided, in Mount Prospect for 37 years.
They are Senior Citizens — his wife is retiring next year — and they want to have kont:',p,Orch to sit on.
Mr. Floros asked if his home had previous additions. Mr. Scaletta said one addition was done 25 years ago and that
he recently had it resided.
Louis Goodman, 31 School St., was sworn in,01, He said he approves of the addition and the Scalettas were
0 1919
excellent n-eignoors,
Mr. Cassidy made a m' otion to approve the request for Variations for the construction of an uncovered front porch
encroaching 5 feet into the -front setback, seconded by,Mr". Rogers.
UPON ROLL CALL: AYES.- Cassidy, Floros, Juracek, Luxem, Rogers.
NAYS -, None
Motion to approve was approved 5-0.
Leo Floros made a motion to adjourn, seconded by Richard Rogers. The motion was approved by voice vote.
4#
Meeting was aajourned at 8:58 p.m.
ti
Barbara Swiatek, Planning Secretary