Loading...
HomeMy WebLinkAbout03/17/2020 Parkway restoration4/14/2020 BoardDocs® Pro Agenda Item Details Meeting Mar 17, 2020 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m. Category 5. CONSENT AGENDA Subject 5.11 Motion to accept bid for parkway restoration in an amount not to exceed $79,150. Access Public Type Action (Consent) Preferred Date Mar 17, 2020 Absolute Date Mar 17, 2020 Fiscal Impact Yes Dollar Amount 79,150.00 Budgeted Yes Budget Source General Fund Recommended Action Accept the lowest cost, responsive bid for the 2020 and 2021 parkway restoration contract in an amount not to exceed $79,150 in 2020. Expenditures in 2021 will be limited to the amount authorized for this purpose in the annual budget. Staff also recommends that the Village Board authorize a one (1) year contract extension (2022) if performance is satisfactory and the contractor agrees to hold pricing. Public Content Information Sealed bids for parkway restoration were opened on March 4, 2020. This proposed contract provides sodding of parkways following excavations by Public Works crews. The bid documents requested prices that include removal of backfill, rototilling, installation of topsoil and placement of sod. The proposed contract term is for calendar years 2020 and 2021. Additionally, the specifications include an option to extend the contract for a third year (2022), at the same bid prices as 2021, if both the contractor and the Village agree. Eleven (11) bids were distributed, and the bid was placed on the online bid service Demandstar. Four (4) bids were received. Bid results were as follows: Bidder 2020 Cost 2021 Cost Total Cost Alvarez Landscaping, Inc. $79,150.00 $79,150.00 $158,300.00 Barrington, IL Fleck's Landscaping, Inc. $97,500.00 $97,500.00 $195,000.00 Wheeling, IL The Langton Group, Inc. $115,000.00 $118,450.00 $233,450.00 Woodstock, IL American Landscaping Inc. 1 $160,000.00 1 $165,000.00 1 $325,000.00 https://go.boarddocs.com/il/vomp/Board.nsf/Private?open&login 1/2 4/14/2020 Schaumburg, IL BoardDocs® Pro The apparent low responsive bidder is Alvarez Landscaping, Inc. of Barrington, Illinois (Alvarez). Alvarez has not performed this type of work for the Village in the past. However, as required as part of the bid submittal, references were provided. Alvarez has completed similar contracts for the City of Chicago, Illinois Department of Transportation (IDOT) and O'Hare Airport. All references were contacted and indicated that Alvarez had completed projects with satisfactory results. Alternatives 1. Accept lowest cost, responsive bid for parkway restoration. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board accept the lowest, cost responsive bid submitted by Alvarez Landscaping, Inc. of Barrington, Illinois for the 2020 and 2021 parkway restoration contract in an amount not to exceed $79,150 in 2020. Expenditures in 2021 will be limited to the amount authorized for this purpose in the annual budget. Staff also recommends that the Village Board authorize a one (1) year contract extension (2022) if performance is satisfactory and the contractor agrees to hold pricing. Administrative Content Executive Content All items under Consent Agenda are considered routine by the Village Board and will be enacted by one motion. There will be no separate discussion of those items unless a Board member or member from the audience so requests, in which the item will be removed from the Consent Agenda and considered in its sequence on the agenda. Motion & Voting Approve the List of Bills - February 26, 2020 - March 10, 2020 - $5,008,266.13 Motion by Michael Zadel, second by William Grossi. Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel https://go.boarddocs.com/il/vomp/Board.nsf/Private?open&login 2/2