Loading...
HomeMy WebLinkAbout10/01/2019 Bid Result - 2019 Backyard Drainage Improvements Project 10/4/2019 BoardDocs®Pro IL Agenda Item Details Meeting Oct , 2019 REGULAR MEETINGI - . Category 5. CONSENT AGENDA Subject ion to accept bidfor 2019 BackyardDrainage Improvements rjct in an amount not to exceed $142,855. Access Public Tye Action (Consent) Preferred to Oct 011 201 Absolute Date Oct 01f 2019 Fiscal Impact Yes Dollar 142,r855.00 Budgeted Yes Budget orce Flood Control Construction Fund Recommended Action Accept the lowest cost, responsive, i for the 2019 BackyardDrainage r r Improvements (tern to Bid as submitted by Mauro Sewer Construction, Inc. of Palatine, Illinois, in an amount not to exceed $142,,855. Public Content Information Many properties in Mount Prospect experience recurring backyard flooding after any significant rain event. Often water will pond in their yards and remain there for a considerable length of time. On May 13, 2008, the Village Board authorized Staff to proceed with the Backyard Drainage Program in an effort to assist residents in reducing the backyard flooding they experience. Staff has received requests for assistance through the Backyard Drainage Program for over 200 residential properties. Surveys of existing conditions have been completed and plans have been prepared to improve surface drainage at each of these properties. Each design includes an inlet in the backyard draining through a pipe connecting to the existing sewer system in the public right of way. To protect the receiving system from being overwhelmed, each design includes a restrictor that controls and slows the discharge into the receiving sewers. These restrictors, while serving to protect the Village sewer systems, may cause water to pond in the backyards during heavy rain events for a short duration. To accommodate this ponding water, rain gardens are installed around the inlets. These rain gardens provide a place for any ponding water to accumulate, and provide a mechanism for the water to infiltrate into the ground quickly. Following construction, the property owners are responsible for maintenance of the storm sewer and rain gardens on the private properties; however, it is the Village's responsibility to maintain the new storm sewer in the public right of way. Each design is contained on a single property, avoiding the need for easements or agreements between property owners. Staff identified sixty-nine (69) of the properties that experience ponding severe enough that floodwaters reach the house foundation. Thus far, forty-two (42) properties have benefited from the program. https://go.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 1/3 10/4/2019 BoardDocs®Pro At the February 10, 2015, Committee of the Whole Meeting, the Village Board determined to continue moving forward with the Backyard Drainage Program while requiring a cost share element from the property owners. The Village Board committed to paying the majority of the cost of the improvements, a minimum of 75% of the total cost. The property owner is required to pay 25% of the cost up to a maximum of $5,000. Staff estimates the average total cost for the improvements to each property to be over $25,000, so the homeowner cost is estimated to be $5,000. All the property owners participating in the 2019 Backyard Drainage Program have submitted checks covering their participation in the programs. Bids were previously opened for this project on August 26, 2019. It included improvements at 4 backyard drainage site locations. Unfortunately the prices came in too high and over budget. The project was subsequently rebid on September 23, 2019 with a base bid of four sites and an alternate bid consisting of 3 sites. Bid Notice i r n the Demandstar by Onvia website and it was publishedin a local newspaper. The bid opening for the 2019 BackyardDrainage r r s held on September 23,, 2019., at 1:00 PM. Four ( ) contractors submitted bidsfor this project. The bids ranged from low of $179,,993 by Concept Plumbing., Inc. to a i $211,687 by Canyon Contracting,, Inc. Below is a summary of the bids: 2019 Backyard Drainage Program Bid Results Bidder Base Bid Alternate Bid Concept l in , Inc. 17 1 Mauro Sewer Construction, Inc. 7 ,869 vici Construction, Inc. $137f955 Canyon Contracting,, Inc. $211f68- $173f917 e e Engineer's Estimate 755 Discussion II bidders submitted i bond in the amount % of the total bid as required in the bid proposal packet. All bids were checked for their accuracy. All bidders correctly signed their bids and bid . The low bid for the Base Bid, consisting of 4 sites, is again over the available budget ($145,000). However, the lowest cost bid for the Alternate Bid, consisting of 3 sites, is within budget. Staff recommends that a contract be awarded for the lowest cost Alternate Bid. The low bidder for the Alternate Bid, Mauro Sewer Construction, Inc. is qualified to complete the work involved with this project and meets the requirements of the contract documents. Mauro Sewer Construction, Inc. was awarded the recent Forest Avenue Drainage Improvements Project and has recently substantially completed the project. Their work was completed to the satisfaction of the Village and on schedule. Staff recommends including a 10% contingency in the project award to allow for quantity variances and unanticipated conflicts. For this project, a 10% contingency added to the lowest bid would result in a total contract award of $142,855 (Alternate Bid: $ + Contingency: $12,986 = Total Recommended Award: $142,855) Alternatives 1. Accept lowest cost Alternate Bid for 2019 BackyardDrainage r r . 2. Action discretion ill o r . Staff Recommendation Staff recommends the Village r ccp the lowest cost, responsive, i for the 2019 BackyardDrainage Program Improvements l rat i submitted y Mauro Sewer Construction, Inc. of Palatine, Illinois, in an mount not to exceed142, . Mauro i .pdf (305 KB) Speci i i i it - - (3,996 KB) 212 N Elmhurst . . pdf (110 KB) https://go.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 2/3 10/4/2019 BoardDocs®Pro 206 Prospect . pdf (116 KB) Administrative Content Executive Content All items under Consent Agenda are considered routine by the Village Board andwill be enacted by one motion. There will be no separate discussion of those items unless a Boardr or member from the audience so requests, in which the item will be removed from the Consent Agenda andconsidered in its sequence n the agenda. Motion &Voting Accept the monthly financial report for August 2019. Motion y Richard Rogers, second by Paul Hoefert. Motion Carries Yea: William Grossi, Eleni Hatzis, l Hoefert, Richard Rogers,, Colleen Saccotelli, Michael Zadel https://go.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 3/3