HomeMy WebLinkAbout5.4 Accept Proposal for 2108 Reservoir 5N Rehabilitation Project 8/27/2019 BoardDocs®Pro
v „tllr, T-77
Agenda Item Details
Meeting Mar 20, 2018 - SPECIAL MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 5. CONSENT AGENDA
Subject 5.4 Motion to accept proposal for 2018 Reservoir 5N rehabilitation project design and
construction engineering services in an amount not to exceed $29,374.
Access Public
Type Action (Consent)
Preferred Date Mar 20, 2018
Absolute Date Mar 20, 2018
Fiscal Impact Yes
Dollar Amount 29,374.00
Budgeted Yes
Budget Source Water and Sewer Fund
Recommended Action Accept the proposal for 2018 Reservoir 5N Rehabilitation project design and construction
engineering as submitted by Burns & McDonnell Engineering of Downers Grove, Illinois in an
amount not to exceed $29,374.
Public Content
Information
Background
As part of our ongoing preventive maintenance efforts, the north 1,000,000 gallon steel ground water storage tank
(5N) at Booster Pumping Station 5, located at 112 E. Highland Avenue (map Attachment A) was inspected in 2017.
The inspection found that the tank needs rehabilitation. Specific items recommended include blasting and recoating of
the tank interior; spot repair and topcoat of the tank exterior; and replacement of ladders, manholes and railing to
comply with current OSHA regulations.
The engineering work necessary to prosecute this project consists of the preparation of bid documents, bid phase
services, and construction management and inspection. Staff asked four (4) area firms that perform this type of work
to submit proposals to assist the Village with design, bid phase services and on-site construction observation.
Request for Proposals
To design these improvements, staff require technical assistance from a qualified civil engineering consultant.
Accordingly, staff prepared a detailed request for proposals (RFP) necessary to solicit these services. A copy of this
RFP is enclosed as Attachment B. Consulting engineers were asked to submit a technical proposal detailing the firm's
background, key personnel, and approach to the project. In addition, each firm was also asked to submit a separate
cost proposal indicating work effort anticipated and a not-to-exceed fee. The required scope of work included review
of an evaluation document of the reservoir that was conducted in October of 2017; preparation of plans and bid
documents; meetings and obtaining all necessary regulatory permits. RFPs were distributed to (4) engineering firms
with expertise in the design and construction of rehabilitation to water reservoirs.
RFP Results
https://go.boarddocs.com/il/vomp/Board.nsf/Private?open&login 1/3
8/27/2019 BoardDocs®Pro
Two (2) technical proposals and two (2) cost proposals were received. Each proposal was evaluated based on the
background of the firm, related project experience, proposed services and scope of work, schedule work effort and
proposal content. Each firm received a point ranking (total points = 100) for each criteria. Table 1 below summarized
this analysis:
Category Max. Points Burns & McDonnell Tank Industry Consultants
Background 20 17 20
Experience 20 17 20
Scope 25 23 20
Schedule 15 15 10
Work effort 10 10 7
Content 10 9 8
Totals: 100 91 85
The technical proposals indicated all of the participating firms were qualified to perform the specified work. All of the
firms had adequate experience and appropriately trained staff to design and implement a successful reservoir
rehabilitation project. Accordingly, the evaluation results were closely distributed. The highest rated firm was Burns &
McDonnell Engineering of Downers Grove, Illinois.
The Burns & McDonnell proposal provided numerous examples of successful reservoir and tank rehabilitation projects
similar in scale and scope as the proposed work. Examples cited included projects for the Northwest Suburban
Municipal Joint Action Water Agency (JAWA), Newport and Rantoul. All references checks indicated Burns & McDonnell
performed well. A copy of Burns & McDonnell's technical proposal is enclosed as Attachment C.
In addition, Burns & McDonnell has successfully completed several engineering projects for the Village over the course
of the last 10 years including the development of a Water Main asset management program and water rate study,
Sanitary sewer flow monitoring, Sewer Smoke testing, reporting compliance with the Metropolitan Waste Water
Districts inflow and infiltration program and the Maple street and Evergreen water main improvement's. All of their
work has been satisfactory.
Each firm was asked to submit a cost proposal as well. Table 2 below summarizes staff's analysis of costs.
Firm Hours Total Cost Cost / Hour
Burns & McDonnell 216 $26,374 $122
Tank Industry Consultants 550 $60,750 $110
The lowest cost proposal was submitted by Burns & McDonnell. A copy of Burns & McDonnell submitted cost proposal
is enclosed as Attachment D. It is the opinion of staff that Burns & McDonnell has allocated sufficient work effort (216
hours) to successfully prosecute this project.
Tank Industry consultants is proposing to have a full time resident engineer on site. Staff agrees that a full time
resident engineer is not necessary for a project of this scope.
Staff recommends including a 10% contingency in the award for this proposed contract due to the fact that time
spent on construction engineering and inspection can vary due to circumstances beyond the engineering consultant's
control. For example, contractor delays, material availability and inclement weather are all parameters that can
lengthen anticipated construction time.
It is the staff opinion that Burns & McDonnell understands the proposed project, has prepared a thorough proposal
based on extensive experience, and is well qualified to perform the work.
Alternatives
1. Accept Burns & McDonnell proposal engineering services for 2018 Reservoir 5N Rehabilitation project.
2. Action at discretion of Village Board.
Staff Recommendation
Staff recommends that the Village Board accept the proposal for 2018 Reservoir SN Rehabilitation project design and
construction engineering as submitted by Burns & McDonnell Engineering of Downers Grove, Illinois in an amount not
to exceed $29,374.
https://go.boarddocs.com/il/vomp/Board.nsf/Private?open&login 2/3
8/27/2019 BoardDocs®Pro
Attachment A Map Tank 5N.pdf (3,324 KB) Attachment B Station 5 N Rehab - RFRpdf (909 KB)
Attachment C Station 5 N Rehab - Burns & Mcdonnell Proposal.pdf (5,429 KB)
Attachment D Burns and Mac Cost Proposal.pdf (246 KB)
Administrative Content
Executive Content
All items under Consent Agenda are considered routine by the Village Board and will be enacted by one motion. There
will be no separate discussion of those items unless a Board member or member from the audience so requests, in
which the item will be removed from the Consent Agenda and considered in its sequence on the agenda.
Motion &Voting
Accept the monthly financial report for February 2018.
Motion by Paul Hoefert, second by Colleen Saccotelli.
Final Resolution: Motion Carries
Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel
https://go.boarddocs.com/il/vomp/Board.nsf/Private?open&login 3/3
I........
ism
........................
IM
co
(D to
MI
kZ
now
611w,617 3 21 39
P 5 2. 41 IIN
1p / '/ CNI
po"i"
"///? ...........
1143
T, 3
�10 IN
'133 4,
9 2
6
609
616 7
6,114 5
6 1
3
6 1
�/T M"I'
la k 5
I im 60, 9
"I m
pg
A/IJ
qgyp
60
7
601 ...........
KIP
60
TOM
C/
co U
T� T" C q, C N1
BONN I
5', 21
23
61 011
........
REQUEST FOR PROPOSALS
Professional Services l
Rehabilitation of the 1,000,000 !Gallon Station SN Ground Storage tank.
February 7, 2118
Summary
The Village of Mout Prospect (Village) is seeking proposals Brum qualified
consultants for engineering and inspections services associated with the
rehabilitation of the Station 5N ground storage tank. (Attachment A, Map)
Background
As part of our ongoing preventive maintenance efforts, a field observation and
inspection was completed in September of 2017 at the reservoir (Rooster Pumping
Stadion 5N, located at 112 E. Highland Avenue in Mount Prospect (Attachment B„
Inspection Report), The purpose of the inspection was to determine any changes
in condition of the tanks interior, exterior, visible foundation and accessories since
the time of the last evaluation.
Problem Statement
The Village seeks a qualified Consultant to provide specified civil engineering services
necessary to let, award, and implement a rehabilitation construction project utilizing
contracted resources, The scope and scale of this proposed project will be limited by
available fending..
Project Scope
The consultant will provide professional engineering services and provide, at a minimum,
the following:
Des gnIBidd rng Phase
1. Consultant shall prepare detailed plans and specifications suitable for
bidding, Plans and specifications shall conform to all current Village of
Mount Prospect„ Illinois Environmental Protection Agency, and Standard
Specifications for"Dater tank facilities Construction in Illinois design criteria.
. Consultant will make application for and obtain any and all necessary
permits.
8, Consultant shall supply a detailed engineer's estimate of costs for
construction of the project.
4 Consultant shall submit all bid documents to the Village for review and
approval prior to distribution.
n
h. Consultant shall advertise and solicit bides, for the proposed project from
qualified, capable, and experienced Water tank construction contractors,
All prospective bidders will obtain plans and specifications from the
Consultant. (Printing of documents will be billed at cost to the parties
requesting plans.)
6. Consultant shall evaluate bids, check references, verify contractor
representations, and make a written recommendation for award to the
Village,
". Consultant shall assist the Village in assembling ,all construction contract
documents for necessary for execution of the awarded contract,
Construction Management and Inspection Phase
1. Consultant shall conduct a precornstruction conference with
representatives of the Owner, Contractor(s), Utilities and other interested
parties affected by the proposed construction,.
2, Consultant shall provide resident engineers„ inspectors, technicians, and
surveyors for the project as follows:
i. Provide a resident Engineer/Inspector (RE/1) for daily
observation of the work during the construction period to
observe and record construction progress under the
general guidance of the Engineer, On the basis of on-site
observation, the Engineer will keep the Owner informed of
the progress of the work, shall endeavor to guard the
Owner against defects and deficiencies in the work of the
Contractors, and may disapprove or reject work as failing
to conform to the contract documents.
ii Provide one set of construction survey stakes, The
projects are to be staked only once in the field, Any
additional staking will be at the contractor's expense.
iii. Prior to the start of construction,the Consultant shall make
a digital photographic survey of the targeted work zone(s)
to document existing conditions of both public and private
property. The survey shall be conducted at a scale
sufficient to note defects in driveways, sidewalks,
structures, and landscaping in or adjacent to probable
construction work areas,
iv Prepare written daily inspection reports. Reports are to be
delivered to Owner in an electronic format. Digital
photographs documenting work tasks in progress as well
as any potential problems or unusual conditions shall also
be included with each report.
RFP for Professional Sam=BWater Mam Construct=Design and Inspection, February 7,2018
Page 3 of 5
"
V, Assist the Owner in preparation of any necessary change
order and/or field directives.
vi. Process monthly applications for payment submitted b
the Contractor(s), and forward to Owner with
recommendations for approval and payment.
vii. Assist the Owner with the resolution of inquiries,
complaints, or concerns raised by residents or the general
public..
viii. Review shop drawings and other equipment/material
submittals as may be required by the contract documents.
ix. Perform a field observation of all completed work before a
final application for payment is processed for the
Contractor.
k Revise the original plans in accordance with construction
observation records of the Resident Engineer" Inspectors,
and the Contractor, and supply the Owner with one set of
as-built drawings in a suitable electronic format..
Technical Proposal
The Consultants technical proposal shall be organized so that the outtin+e generally follows
the format of this request for proposals. The proposal shall cover the approach and the
methodology the Consultant intends to use in carrying out the project. The technical
proposal should also include statements setting forth the Consultant's line of business,.
organizational structure, summary of past experience, and specific descriptions of at least
three ( ) projects completed in the Chicago metropolitan area that are similar in subject,
sizer and complexity to the scope of services specified herein. These descriptions must
include contact information for reputable references that can attest the Consultant's
representations.
Cost Proposal
The consultant will quote a not-to-exceed price for each phase of the services described
under Scope of Services. Each price quote should include a breakdown by personnel
classification and estimated number of hours spent by each. Pace proposals should be
submitted as a distinct document in a separate sealed envelope marked:.
Cost Proposal for Engineering Services
Rehab illitation of the 11 000,000 Gallon Station 5N Ground Storage tank
Proposals due February 16, 2018
Present Work Load
A complete tabulation of the Consultant's current project workload'is to be included. Each
project shall be identified by name, type, size, duration, and personnel assigned.
RFP 1br PrOfessional Services/Water gain cansiructio n Designs aria inspact on February 7,20118
Page 4 a4 5
I �
1w
vz y.
ztt, n
,Iry
oz
I if:
olkz
rlr
i
r k
{ r�
V9 U
tr9 LZ oz
9 sz 190zo
VoCz
zz
zz
Eq
oz
0 fp
i �
yam,'
•�rr' ;�' �_ J cls
e
x
v y "
r
k
yH
,
4C14
r 1
I
r, t
x� f
r
I
I
I w»
I
;r r
ru w..e r
ffff,�J yy;
rr
✓i ie,,/ivrr�ia>��iiia, „„�,%/ ,,,,%„ '
OEM=,
�d
� Won
v
i
i
A
BURNS MCD ONNELL
�February 16, 2018
■
Casey Botternian, Water/Sewer SLip erintendent
Village of Mount Prospect
1700 W, Central Road
Mount Prospect, IL 60056
Re: Proposal for Englineering Services-Rehatibillitation of the 1,000,000 Gallon Station 5N Ground
Storage Tank
Dear Mr, Botterman:
Maintaining water infrastructure in an,economical way can be a challenge for municipalities like the
Village of:Mount Prospect(Village). Meeting this challenge requires a strong partner that understands
your goals.
Burns & McDonnefl understands,the objectives for this project and is qualified to provide the design
and construction services outlined in the February 7, 2018, request for proposals. We, bring the
following advantages to the Village:
i roven Track Record of Delivering Profetts to the Village Burns&McDonnell Ibnngs i-.i unique
perspective given Our track record of delivering successful projects to the Village. For over a decade,
we have worked with you to plan,design and construct iniprovernents,to your water systern. We
understand Village standard contract documents and construction details.That perspective rrake,s us an
invaluable partner
Unique novel dl e^at the Vffla,g6ls Water System Burns& McDonnell has a long history supporting the
Village with planning, designing and constructing limp rovernents to the Village's water system.We know
the issues that are rnost important to you,like managing cost arid delivering well coordinated projects.
Experience with Des,ign&Construction for the Village Randy Patchett,our proposed project rnanager,
Joe Darlington, OUr proposed design manager and Steve Crede,our proposed construction manager,
all have experience providing design and construction Phase services successfully for the Village. Most
recently, Randy, Joe and Steve provided services to the Village for the Isabella Drainage limproverne tits
project and the Maple and Evergreen Water Main Improvements project,which included piping
rnodificabons and a connection to the Village"s,elevated tank. These projects were delivered on schedule
and within budget.
Enclosed, please find Our submittal in response to your request for propos,a;ls. (Feel free to contact me
at 630-724-3276 or rp Tj ±e.tt.,,&bur if you have any questions,
Sincerely,
U11,cv;/116'
Randall L. Patchett, PE
Water& Municilpal Services Manager'.
1431 Op,vs PV ace, u(e,100 F)own',�rs Gtove,IL 605 5
0 650-7; 3200 burnsrnccacom
r
r, I�r rp�iir rrrrr 1 f,
4 Company profile
'7 Project approach methodology
® 9 Scope of services
12 Project tea
ReSU4"4"Bes
22 Summary of past experience
rs t work
Cost proposal 9 raite sealedew ra )
■
■
Cl
Co nI■
lle .
MEMO=
N- 13r..jrns & McDxinell, oiAr engir�eers, BURNS & McD,ONN� ELL
c(1nstn"VCton prof,essionals, scienbsts ar)d
ANKIN�GS
conisi,,ftants clo rnore u'iari sirnply pan, IN�DUSTRY R
desagrand consl.ri_uct. wo) a rriissbn
r_mchari,ged Ir Ir 18,98. ....... t() r'j-')ake or,.)r
chentr,-,; as_icc_'essfi,.O —, OLP- ff)01-e thain ID,700 aeeog N '(oed
prof'ession�3�s partner wiU"i yol,� t a ta 1,<e 03
orr t�"ie c�iall(,',mr)ges, constanfly
IM
W0p1�Jrq' tc rrk- U')e world EH E'Weri 'or)) , �) o ci 4,,e T 4%Vq#a0*
arnazang pfiac'e. td psq)
Local PIS esenice & Depth of Staff Corporate Sitructu�re & Services
Based in Kansas City, Missouri, Burns & McDonnell We provide comprehensive services that cover the
has more than 40 offices nationwide, allowing us full life cycle of a project, finding cost-effectilve
to provide innovative, timely and cost-effective solutions to meet YOW' specific needs. Our services
service to clients, With over 5,700 employee- cover all markets in the engineering and
owners, Burns & M�cD,onnell has professionals construction sectors to bririg you and your projects
with, extensive experience in an Wde range of searnless breadth and depth of knowledge and
engineering, construction and environmental skills.disciplines.
`Water&'Transportation Cornmerball, Retail&
Locally, Burns & Mcf onnellll has been providing EnvironrnentM Institutional
water services to municipal clients in northeastern Construction Manufacturing &
illinois, for over 20, years. We have lloc ll offices aAvOtion Industrial
located in Downers Grove and the City of Chicago Governmental, Military Oil& Gas
with a combined staff of over 330 professionals. We & Municipal ► Power
anticipate that afl of the services in the Jammry 16,
2018, reClUeSt for proposal will be provided Iby staff Industry Rankings & Recognitions
located inn our Downers Grove office. We will call Burns & MdDonnel'11 has a reputation for providing
upon national experience as required. ClUaRy service and innovative solutions to
Our Downers Grove office location: clients. Engineering News-Record(ENP) ranks
Buirns & McDonnell in, the top 5 percent of the
Burns & McDonnell Engineering Company, Inc. leading 500 US des in firms and the top one-third
1431 Opus Place, Suite 400 of the leading i program, management firryis, design-
Downers, Grove, Illinois 60515 build firms, construction rnanagerrent-for-fee firms
630-72'4-320O � www.burnstncd.corn, and coinistruction management-at-risk firms.
BURres,\'MSD:ONNELr
In 20117, ENR t4idwest named Burns 9: McDonnell) to identify,assess and develop Plans to mitigate
No.2 Designer of the Year. Also in 2017,29,of our risks and create project instrUCtiOns, which include
Specific Industry services earned spots in the top 40 scope and responsibilities, schedluJe and budgets
in their field In ENP,"s industry-sipecific rankings, and project-specific requirements, We buildsix-
step internal',quality reviews into project schedules
FORITU N Burns& I c uonnelll has earned that involve regular coordination meetings and
acknowledgment that calls attenition evaluations by experienced professionals at strategic
to cur industry leadership and milestones, throughout the design and construction
10 0� stability, growth and low turnoveir, processes,
experience, and financial strength.
BE S� T We have appeared onFortune Commitment to the
C ■
0 M PAN I I S magazine's 100 Best Companies to Village of: Mount Prospect
TO WORK FOR* Work For list for five consecutive OUr mission is "to make our clients,successful",
2 10 years,,, ranking No. 16 for 2017. and we accomplish this by developing long-term
relationships, based upon Mutual respect, technical
4e ax For the sixth consecutive competence and responsiveness, Burns,& McDonnell
Year, the Protessiona/Services is 100%ernployee-owned,and our clients tell LAS they
Managernent Journal(PSMJ) has see our pride of ownership in,our work,Over 90%
PREMITER AWARD
'a.CUR.r 5.11MKIM. presented! Burns & McDonnell of our work is repeat business with existing clients,
with the Prernier Award for Client Satisfaction which demonstrates their level of satisfaction with
for receiving award-winning ratings in, key client our services,
service categiories. PSMJ, the leading publisher,
trainer and consultancy to the A/E/C, industry, Burns& McDonnell has been successfully providing
annually conducts an, independent survey of consultingi, design and construction services to
A/E/C service provider clients to determine overaH the Village for 15 years. Our proposed staff are
satisfaction levels in seven categories: helpfulness, experienced in working with the Village on similair
responsiveness, quality, accuracy, Schedule projects, We keep projects on budget and or)
adherence, budget adherence and scope and fees, schedule while rnaintainingi effective communication.
We pride Ourselves,on being qualified and
Commitment to Quaility responsive, We value our partnership and look
Delivering quality I Cpl 1 forward to continuing to serve the Village of Mount
work is a cornerstone Prospect,
of our firrn. Backing
the skills, knowledge
Fro
rnlrq
F ilpv�
%,/,", J,
and experience of
our professionals is
va
Our robust Quality
r/
Assurance/Quality
4/7//g
.........
,u Sg
"
p,
Control (QA/QQ1
Prograrn.
Providing the franiework
to,confirm our project
excellence, our QA/QC Program includes check
and balances based, on lessons learned throughout
or snore than 118-year history and the experience
of our employee-owners. We perform risk reviews,
BURNS&MSDONNELL: 01
■
Projw%. ao% nroach p .ethoidology.
■
■
■
■
........ ......
Folroject o
eth, odology.
Background cost Burns& McDonnell receirntly supported the
The north ll, -ballon steel groundwater 'Villapfe with deevelopernent of a Water Dain Asset
storage tank at the Village of fount Prospect Management Program and Water Rate Study,
Booster Purrnpuin i Station SIN was inspected by other's so we understand that this project is the start,of
in 201!2 and again in 24 1 . The inspections, found many projects the"Village will be completingcomplet4ig in the
that the tame needs rehabilitation, Specific iter ns u.upnccirvnhng years. Managing const is key to making
recommended in the r"rnost recent inspection include sure the Village can implement their program
blasting & recoatin i of the tank interior', spot rel air the way it was intended. Simple design decisions
and topcoat of the tank exterior; and replacement of Nike coating type and nnethodologyr (e.g. overcoat
ladders„ nnanh�oles and ra�lhrngs to conn lyr with current vs, full bluest &recoat)can have a drastic effect on
OSHA re,cguulations. cost, The Village needs an opportiun4yr to consider
these Nssiues to,make data-driven decisions. We
The rehabilitation of the 1l,000,00 Galloon Station will udentifyr feasible options, discuss there wsvith the
N Ground Storage 'Tank project consists of the Village,then design,and bid the psro,gect in a manner
preparation of bud documents, bud phase services, that allows for bid alterrnatives.,This w rlll allow the
and constr°uctican management emernt inspection for the Village to obtain competitive parking and deride
�
Village-owvirned water storage tank at the Booster what to do bossed on actual installed costs.
Purnnpairng Station 51N, located at 112 E. Hhland S,treet Heavy Metal Abatement&Disposal l'The 201
in Mount Prospect. inspection report identified the potential presence
of head in the e'x'terior and interior coating s,~ stenns,
Project Approach Appropriate disposal of lead-based paint cern add
We intend to deliver a successful project by cost to the project, We will complete additional
providlinu proactive project m nagerxnent and testing of the existing coating sy terms to verify
coordination with the "Village to cornfirrrn than "Village's the po�tentiai for the presence of heavy nnetals.
objectives can be rrnet„ prro�ect costs are mininniaed The project specifications w,rill include nneasures
and an efficient plan to complete the project has for proper verification and disposal of heavy rnnetal
been developed, Our clear, concise communication based paints. Burns&McDonnell has over 60
will contribute to the delivery of this project on erMronmoerntal staff,located in our Downers Grove
budget and on schedule while minimizing impacts, office that can assist the Village, if needed.
to the public. Effective Communication is critical to Permitting The puroposed imp"nroverrnenwnts wuwM require
the public and Village Administration's lperception of obtaining a construction paerirnnrt From IEPA. We, have
the Project, an excellent relationship with IEPA and are confident
that this will l result in a timely pnerrrnit review and
Resolution of Key Considerations issuance,
The successful design and construction o�f the
Project wvilll present sor"rne uni uue con side rat ions,
The followving paragraphs identify and discuss keys
consideratrorns for completing the prrolect as well as
how the Burns& MicDonneM toearn intends to manage
and resolve these conusiderations.
Buuurrus&MWONINELLn
services .
Scope of se 'i "s ■
Des,igin, Engineering & Bid Phase Task S. Bid Phase Support
Services Provide Bid IDocumenits Electronic copies of the
Task 1. Project Coordination final tissued for bid documents will be made available
Ll Kickoff Meeting Coordinate and conduct to prospective bidders, in PDF format for a nornnat
a project kickoff meeting to introduce key fee. Bidders will be abale to,purchase hard copies of
project team members, review the scope of the documents at printing cost.
work, Village Budget, objectives, information, Attend and:Coordinate One (1)Pre-Bid Meeting
and coordination that will be, reciluired. Prepare meeting agenclaand meeting notes.
U Project Managernent Complete project Provide Bidding Assistance Review bidder
management and administration tasks,. questions and, requests for clarification,resporid
L3, Design Review IMeeting Conduct one project to questions in writing and prepare addenda as
status meeting with the ViHage to review the necessary,
design package�. Attend and Coordinate One (1) Bid Opening,
Bid Review and Recommendation Review and
Task 2. Preliminary Design evaluate bids for completeness,deveiop and review
2.1 Existing Data Review Request and review bid tabulation, verify contractor representations,
existing data Pertinent to the project. This check references and make a wriitten,
is anticipated to, indUde as-built drawings recommendation for contract awaird,
Asseirrible Construction Contract Documents for
provided by the V01age and the 2012 ands 2017 execution of the awarded contract.
inspection reports.
12 Field Investigation Identify existing conditions. Construction Mainageiment & Inspection
23 Coating adhesion and heavy metal testing Task 1: Project Coordination
Cornp]ete testing to confirm existing, Pireconistruction Conference Coordinate, attend
conditions. and conduct one Preconstruction co,nfereince
with representatives of the Village,contractor(s),
Task 3. FInal Desl_qn Utilities and other interestedparties affected by the
Construction did Documents Prepare specifications proposed construction. Prepare meeting agenda
for bidding. Prepare and SUbmit a fiinall PCC, and rneeting notes.
Submit up to three (3) hard copies to the Village. o Project Mainagernent Compiete project
Documents will conform, to Village, IEP A and managef'Tleflt and administration tasks.
Standard Specifications for Water& Sewer Main
Construction in Illinois requirements, Effort to make Task 2:Resident Engineering,& inspection
bid documents comphant with third-party financial * Preconstruction Photographs Prior to the start of
and reqUirements is not included. construction, make a digital photographic survey'
of the targeted work zone(s)to document existing
Task 4:permitting Supo
prt conditions,
* submittal Re,view IF eview Contractor's schedw:ie
Prepare and submit a construction permit of values,work schedule-, shop,drawings and other
application to IEPA. permit application fees are not equipment/materiM submittals as may b'e required
included in this proposal. by the contract documents,
8URNS,\,,'M5D0NN ELL'
0
Project Administration Task 3:Project Closeout
a Assist the Owner in preparation of any necessary Punch Ust Perform a fieId observation of all
change order and/or field directives. cornpleted work before a final application,for
4 Process,nnonthly applications for, payment payrnent us processed for the Contractor. Prepare
submitted by the Contractor(s), and forward to PLMCh list,,and complete a field visit to confirm items
Owner with recornmenclations for approval andl have been addressed,
Payment, ► Conformingto Construction Icurnents Revise
* Assist the Owner with the resol0on of inquiries, the originals plans in accordance w,ith construction
comlpllairits,or concerns raised!by residents or the observation records of the. Resident Engineer,
pubhc. Inspectors,, and the Contractor,and supply the
Resident Engineering Provide a [Resident Project Owner with one set of as-bulft drawings in a suitabie
Representative (RPR) for part-time observation electronic format.
of the work during the constrLIC0011 period to
observe and record construction,progress unidler
the generall guidance of the Engineer. Based on on-
site observation,the Engineer will keep the Owner
inforirned of the pro�gress of the work�, shall endeavor
to guard!the Owner aigiainst defects and deficiencies
in the work of the Contractors and may disapprove,
or regect work as failing to conform to the contract
documents, Other tasks include:
Prepare written inspection reports whein on-
site. Reports are to be delivered to Owner
in an electronic format. igital photographs,
docurnenting work tasks in progress as weIl as any
potenitiall problerns or uniuslual conditions shall also
be included with each report.
Complete site visits to inspect Contractor's work
and confirm it comphes with the specifications.
Site visits will)occur at the following key
milestones in the project.
....................................................... ....................
ttlwtt
Miflestone/Work Activity
--
...... .....7---—-- ---------/
...................
mt iiv
W,0401,10 4410
774
00016111/1100,00 MCIAh"o 0014,00,40
tolt
BURNS k&NISDONNELL:
■
Projoect ,tela
Projec. %. tea ■
Every member of Burns ,% McDonnell's project We have successfully completed tank projects
team has extensive experience designing andl for the Village, Randy Patchett and Joe
constructing waiter storaige tanks throughout the Darlington were both part of our design tearn
Midwest for municipalities and private sector for piping mocIfficatbnIs to,the Wlage's elevated
clients. Each member of our project tearni has, water storage tank and Steve Crede was the
experience working on,successful projects that Construction Manager for the construction of
are similar to the Rehabilitation of the 1,0i010,,0001 thiis connection, W? understand Village standard
Gallon Station 5N Ground Storage Tank project contract d0CUrnents and construction details,
(Project). Our team offers the following v,alues,. Randy Patchett was part of our team that
supported the Village by developing the 2017
Employee-owners willing to gua the extra mile Water and Sewer Rate Study,That studly proposed
An enthusiastic and innovadve spirit utility rates to adequately and equitably recover
■ Proven track record with the Village costs for the Village's water and sewer utilities.
Proven record of serving as probkirri salvers rather This project was,included in the rate study, so we
than propagators know the Village's budget expectations and the
100IIXi Comrinitment to the success of the Wlage need to the got frost of their money.
Familiarity with the Village & this Project 'Team Strength
The ideal l key personnel for this project ShOUld havie A team orgainizational chart is Iprcuvided on page 14,
experience completing similar projects, experience The brief bios of key members provided belcow list
with, the Village and!a strong understanding of proposed roles and the value each,will provide to
the Village's procedures, interaction with project this project.
stakeholders ancil design aundl construction related
requirements. Our proposed project team has that Project Manager
experience and knowledge, We also have a long Randy Patchett, PE will, serve as the project
history supporting the Village with evaluation. manager for this project.. Randy has,over 3,01 years of
Some of the advantages the Burns & McDonnell experience managing municipal projects. Randy is
project'tearn offers include: well versed in the design of water storage tanks. He
will be resporisiiWe for project coordination, project
o, Key irnembers of our project tear n have a stror)g, scheduling, budget maintenance, project desigin,
professional working relationship,with the Village, overall performance and incest importantly„ client
Randy Patchett, PE our proposed project manager satisfaction, Randy has experience in completing
Joe Darlington, PE out proposed design maniager rnultiple projects,for the Village of Mount Prospect,
andl Steve Crecle our proposed construction
manager have successfully provided planning, Design
design and construction services to the Village on Joe Darlington, PE will serve as the assistant project
multiple projects. nnanager on the project and as the (lead designer Joe
Our key personnel have reviewed available will work directly undier, Randy and coordinate daily
information and have a strong understanding;of design activities. He has extensive experience with
the project requirerrients, Some of our experience the Village and a strong uindeirstain6ng of Villagie
working on the Village's water system OCILKJP.S: requirements, Joe will be supported by Ma,tt Dunlop.
BURNS�MSDONNELL' 0
............ ........ ....
Steve Cradle will serve as OUr quality irrianager Support Staff
during the design phase. He is farnfliair with Village The project tearn presented in this section: will be
requirements sand preferences and is highly guy aifified supported by over 40 civil, structural, electrical and
to complete conistructability reviews because of mechanical engineers,and technicians and over 20
his over 19 years of experience in designing and constrUCtiOn personnel as needed for successful
conStrUCting water storage tanks, Steve brings,a completion of the project. All of the primary support
contractor's,perspective to our tearn and is key to staff are located in ouir 11linciis offices.
our proven,track record of delivering projec�ts w�ith,
minimal change orders. An organizational chart and detailed resumes of
Burns&McDonnell personnel follow this page.
Construction Services
Steve Crede will serve as our construction
manager, In this role he will represent the Village by
coordinating with the contractor including attending:
progress meetings. He wdll coordinate closely
with Matt to make,sure the project is constructed
smoothly. Steve has over 19 years of experience
in designing and constructing waiter storage
tanks.Steve has a proven track record providing
construction service to the Village; succeSSfUl
projects include the 2013 Stoirmiwateir lmprovernents,
project, the 2015 Isabella Drainage Improvements
project,the 2015, Maplie Street & Evergreen, Avenue
Water Main, Improvernents project, and standby
generator installations at Booster Purnp Stations,#11

Matt Dunlop, EIT will serve as our resident project
representative, Matt has 4 years of experience in
constructing water storage tank pirojcts, as,well
as construction experience with the Village. Matt
was an inspector for the 2015 Isablelila Drainage
Irnprovements,project, He recently has been
Providing construction seroc es for a onie-million
galloon potable water elevated storage tank and a
five-hUndired thousand gallon potable water e,levat ed
storage tarok in the Village of Rantoul. Prior to that
he was providing construction services for the
rehabilitation olf a 5-MIG s,tanidplipe owe ed by thin
Northwest Suburban Municipal Joint Action Water
Agency,
BURNS&WIDONNELL"
Organizational Chart
BUms & McDonr)O has asserTbled a qi.,rahfied, experiericed arid kriowledgeable
project tearri to provide Pr`(Dfess�brial services to d-� e ViHage of Mor.mt Prospect for,
the 1" ,ha of the 1,000,00() GaHori Statior) 5r,,J Gr-OUA Storage lair�k �'.)roject,
We are cor-dderit the tearr) vvM defivect oir� sd-)edde ard withirl lxdget, Ar-I
orgar)rzatbr)al chart as �',)rovdecl Lelovv iar)d detaHed resLimes of Br.jrns & McDor)I )ek
persorm6 folloviv t[',res r,'),age,
Village of MIounit Prospect
Randy Patchett PE
Jot,Dadiington,PE
'Malt Dunlop,EIT matt"ID0,01);Ell
BURN S:&MSDONNELL- 0
e
0
33
Randy Patchett years of
Project Manager experience
Randy Patchett manages the water and municipal services practice
for burns McDonnell's Chicago regional' office. He is a seniior civil
engineer with extensive experience providing consulting engineering
Education services our civil,environmental and hazardous,ardour waste projects to
Bea Civil Engineering municipal, industrial„state and federal clients. Randy's responsibilities
include developing and managing projects involving a wide range
Registrations of services in the areas of wvater, wastewater, storurnwwrater and flood
Professional Engineer RL) rneagnaanageent„ hazardous/mixed waste maiinement and general civil
�I
works, His experience includes performing investigations, feasibility
studies, computer rnodelingi4 global information system projects,master
planning„ design and construction management.
Staindpipe Structural & coating Rehabilitation I �
Northwest Suburban Municipal Joint Action ,iter
Agency
Greater Chicago Area, Illinois
Clieni�t manager for the rehabilitation of two 5-million gallon
stand piipes owned bNS,MJAWA in the greater Chicago area, "f`Ihe
standpipes provide pressaure equal i ation and water storage for
N MJAWAs 100-MGD transmission system whidhi provides water to
sevenChicago-area suburbs. After being damaged as a result of ice
build-up due to cold weather, the overflow scupper needed) redesign,
and the coating systems needed to be completely renovated, The
project included structural repairs and coating system improvements.
Responsibilities included project management, design of overflow
scupper iirnprovernents, new coating system selection and developing
construction laird documents.
Campbell & Maplewood Elevated Tank Structural
�
Coating Rehabilitation I Villagecif Rantoul �
Rantoul, Illinois
Client Manager. Multiple ellevated tanks provide storage in the'Village
of i antoul's water system, Among them are the d-rnilllnon-gallon
spheroidal elevated tank at Campbell Street and the 500,000-gallon
legged elevated tank at Maplewood Drive. The project inclUdled blasting
and recoating of the interior and exterior of the Campbell Ellevated
Tank, spot-blasting and over-coa,tnng of the interior and exterior of the
Maplewood Elevated Tank,various improvernents to theTanks'safety
measures, steel work, disinfection and site restoration.
euRNs&MSDONNELr 0
Randy Patchett F)E
Project Manager
Elevated Tank 510 Structural & Coating Rehabilitation
Newport, Chemical Depot Il use Authority
Newport, lndiana
client Manaig:er for the it habilitation of a 100,000-galIon elevated
tank at the Vermillion Ri�se Megia Park in rural Indiana.The project
included Structural repairs, tank access,uipgirad es,and coating system,
improven'ients, ResponsibiRies included performing, a,condition
assessment of the elevated tank, oversight Of SUbcontract.ors,
developing construction docurnents and project imanagement dUring
the COnStrUCtion phase,
BURNS�&'MSDONNEW 01
E
08
Joe Darlington PE years of
Design Manager e.. rielnce
Joe Darlington focuses on water and wastewater projects for municipal
clients, He is a, project manager with experience in evaluation,design,
permitting and construction mainagerneint of water main, force main,
Education sanitary sewer, storm sewer, round) water wells, purnp,stations and
BS, Civil Engineering water and wastewaiter treatment pllants, He strives to understand client
objectives and is passionate about leading design teams to, perform
Registrations with,exceHence. He has a successful track record coordiinatingi projects
iineer(IL, IN)
Professional Eniwith thirdl parties, such i ass regulatory aqiencres, property owners,
g
OSHA 10-HR Construction impacted businesses and residents. His ever-r irowing knowledge of
Certified civil infrastructure diesigni and construction,enable him to successfully
execute projects for the mutual benefit of:clients and their cornmunities,
Standpipe, Structural & Coating Rehabilitation I
Northwest Suburban Municipal Jloint Action Water
Agency
Greater Chicago Area, Illinois
Project manager for the rehabilitation of a -MG standpipe owned
by the Northwest Suburban Municipal Joinit Action Waiter Agency
(NSM,JAWA) in the greater Chicago area.The standpipe is,one of two
that provides pressure,equalization and water storage for NSMJAA's
1100-M& transmission systern which suppllies water,to seven Chicago-
area suburbs. The project included structural repairs and coating system
improvements, Responsibilities included project management, design
of overflow scupper i rn prove ments, new coating systern selection and
developing construction bid documents
Campbell & Maplewood Elevated Tank Structural &
Coating Rehabilitation 1, Village of Rantoul
Rantoul, Illinois
Project Manager. Multiple elevated tanks provide storage in the
Village of Rantoul's water system, Arriong them are the 1-miillioin-gallon
spheroidal,elevated tank at Campbell Street and the 500,000-gallon
legged elevated tank at Maplewood Drive. The Project included Uastingi
and recoating of the interior and exterior of the Carnpbetl Elevated
Tanja, spot-blasting and over-coating of the iinterior and exterior of the
Maplewood Elevated Tank,various improvements to the Tanks' safety
measures,steel work, disinfection and site restoration,
BURNS&MSDONNELL' 0
■
Joe Darlington FIE
Design Lead
Elevated Tank,510 Structural & Coating Rehabilitation
Newport Chemical Depot Reuse Authority
Newport, Indiana
ProJect Manager for the rehabilitation of a 100,000-gallon, elevated
tainik at the Verr-nillion Rise Mega Park in rural lindiana. The protect
included, structural repirs, tank acciess upgrades, and coating system
improvements, Responsibilities included perforrning a condition
assessr-nent of the deviated tank, oversight of subcontractors,
developing construction documents,and project managernent during
the construction phase.
BURNS$,WDONNELL
Illi
loon
149
Steve Crede Years o'f
Constrution Manar experience
Steve Crede serves B urns & McDonnell as a project manager and
manages construction irrianagement services. He focuses,on water,
wastewater, stormwater and transportation projects for municipal
Education clients. Steve has served as a construction manager and resident
BS, Civil Engineering engineer on nurnerous projects providing construction inspection,
layout and Project oversight, In addition, he has extensive experience
Registrations in water main, s,torm sewer armdl sanitary sewer design for land
OSHA 10-HR Construction development and Ipublic works projects, using AutoCAD software.
OSHA 301-HR Construction Stanidpipe Structuiral & Coating R�ehablilIitation I
OSHA 40�-HR HAZWOPER
Designated Erosion Control Northwest Suburban Municipal Joint Action Waiter,
Inspector Agency
DOT DOC'Unientation of Greater Chicago Areae, Illinois
Contract Quantities Ccertified Residient engineer for the structural repair and coating of the interior
Fermll-ab Electrical Safety and exterior of a 5-MG west Stanid�pipe for NSMJAVVA.The exiistinig,
Certified overflow scupper became overloaded with ice and tore away frorn the
Fermil-ab Radioactive Safety side of the Standpipe, tearing a, hole in the wall. In addition,the coating
Certified systeirin IpOreviousdy installed fourteen,years prior was beginning to fail.
The project included repairs to the overflow s,c�upper,a reinforced
connection of the overflow scupper to the Standpipe, blasting of
the interior,exterior, and ipilasters of the Standpipe, and application
of a three-part coating system for all surfaces, The project required
coordination with NS,MJ'AWA, the Village of Hoffman Estates, the Cook
County Forest Preserve District, various utility companies, and! the
one construction for the, Route 72 bridge over the 1-910 Tollway.
Campbell & Maplewood Elevaited 'Tank Structural &
Coating Rehabilitation I Village of Rantoul
Rantoul, Illinois
Construction manager for the coating &structural rehabilitation for
a one-ii-nillion giallon potable water elevated storage tank and a five-
hundred thousand gallon potable water elevated storage tank.The
Project includes blasting arid! recoating of the exterior mind interior of
the orie-rnillion gallon tank at Campbell, spot blasting and over-coatingi
of the interior of the five-hundred thousand gallon tank at Maplewood,
various improvements to the Tanks" safety measures, steel work, and
site improvements and restoration, Responsibilities included inspection,
and documentation of the contractor's work. The project required
coordination with the Village and local residents.
IBURNS&MSDONNELL" 0
nI I
I
3 Matt Dunlop
Staff Engineer/Resident Project yelars of
r,
Representative experience
Matt Du!n,lop has experience in various aspects olf both design and
construction of water-rOated projects. His educational background
® provided harm with knowledge needed for the design of a variety of
Educa!tilon project typ s including collection, treatment,and transmission and
„Civil Engineering, drstridution,
BA, Engineering Physics
Standpipe, Structural & Coating Rehabilitation
II
Registrations Northwest Suburban Municipal .d int Action Wat 'ir
Engineer-in-TrajNng Agiency
DOT Documentation Greater Chicago Area, Illinois
Certification of Contract Lead+desf cru engineer for the rehabilitation of a 5-MG standlnupe owned
Quantities by the Northwest ubu,ur'ban Municipall Joint Action Fater, ,agency
l
OSHA 101-HR Construction (!"SMJA'v"A) in the greater Chicago area. They standpipe us one of two
that provides pressure equalization and water storage for NMJAWA's
100-MG,D transmission system, "which supplies water to seven Chicago-
area, suburbs, The project included structural repairs, coating system
innprovements„ and site access road design, Responsibilities included
production of design drawings, design of site access round and grading
plain„ perm-nit applications, bidding n support and cost estrnnate.
Campbell and MaplewoodElevated Tank atin
Structural Re'ha,bililtations I " fill o Rantoul
Rantoul, Illinois
Resident engineer for the coating &structural rehabilitation for a
one-million gallon potabl�e water elevated storage tank and a five
hundred thousand glahon potable water elevated storage tank.The
Project includes bianstirng and recoa,ting of the exterior and rnteri'or of
the one-million gallon tank at Campbell, spot blastingand over-coating
of the interior of the five-hundred thousand)ballon tank at Maplewood,
various iirnnpro'vements to the Tanks,. safety measures,steel work and
site improven°neun'ts and restoration. Responsibilities included inspection
and dOCUrrnentation of the corutractords work, The project required
coordination with the " illiage and local residents,
BURNS&VISDONNELL: 0
AW* WASLalk IL N AWO t
b� ummary pazo
exm,,,,,,, eriencel .
I� �
Elm
n S,TANDPIIPE STRUCTURAL & CO,ATIN�G REHABILITATION
Northwest Subiijrban Mt..micilpal Joint Actlon Water Agency Elk Grove Villlagie, It,
The Northwest Suburban Munilcipal d
inWter Agency(NSM�JAWA) owns anoperates
two 5,0-million-qallon:potable water storage tanks
and e,nm aged Burris & McDonnell to provide design,
bidding and construction services for the repair and
recoating of both tanks. Built in 19,8,4 and last painted
in,19917, the tanks needed maintenance attention.
During the pirevio�uis winter months, significant
icing within the west standpipe darnaged the 8 ft,
x 12 ft,overflow cone causing it to break free of its
imountingi, and opened a hole in the tank wall. The Project Stiaitisti�cs,
■
overflow cone was completely separated from the Client Name Northwest Municipal Joint
tank interior and settled at the bottorn of the tank Action Water Agency
which remained in, service. Included in the project Construction Cost I$2M
specifications was the repair or replacernent of the
M overflow,cone. Burns&McDonnell provided plans for Project Refe,rencle
the fabricatbri of a new cone as an alternate bid for Kevilin J.Loc*hart D I eputy Director
the project.
901 WelOngton avenue
Construction of the Project was completed in Ellk Grove Village,, 1!1,Illinois 60631
two separate phiaises. The west standp4pe was 847r981-4083
rehabilitated first and included repairs to the klockhairt@nsmjaw,a.com
damaged section of the west Standpipe wall, repair,
or replacement of the west Standpipe overflow cone, ProjectTeam
additional: support for the overflow cone in the west Client Manager, Randy Patchett
Standpipe, blasting and! recoating of the exterior Project Manager/Lead Engineer, Joe
and initerior of the west Standpipe,disinfection and Daelington
site restoration. The east standpipe i�s,scheduled Construction Manager: Steve Crede
for rehabilitation ire 2018 andl includes repair or Staff Engineev,Matt Dunlop, EIT
replacement of the east Staridpipe overflow cone,
additioriM support for the overflow cone, blasting Services Provided
and recoatingi of the exterior and interior of:the east
Standpipe,disinfection and site restoration, The Coating,System Design
east standIpipe contract also includes construction Structural IDesign
of a new gravel access road and site drainage Co nstruictl on inspection
improvements, Construction Englion eering
BURNS&WDONNELU 0
...................
Burns& McDonnelll provided bidding phase
administration services, logging inquiries,
distributing pl�ans, in, paper and Oectronic format,
tabulating bids and Providing a Iblid recommendation
for award of the prof t.
Burns, & McDonnell also,provided construction,
olbseirvation and inspection services. On site
construction inspection for the duration of
the project including observing the work for
conformance with the contract construction
documents, review submittals and shop drawings,
review progress and final pay reqiues,ts, prepared
by the contractor, review change orders, notify the
agency of items not in conformance and provide
photo docurnentation of the project,
BURNS\,,,*4 MSDONNELU
-- —-----------
ON M. -
ELEVATED TANK 510 STRUCTURAL & COATING REHABILITATION
r,,Iewpoirt Chernical Depo�t Reuse Authority Verr)'Ahon County, ItJ
Burns& McDonnell is currently pro vicfing owner's
engineering services for the Newport Chernical
Depot Reuse Authority as part of the redevelopment
of the former Newport Chemical d epolt into the
Vermillion Rise Megia Park. The project includes
the developir'nent of a regional water, system to
provide service to large industrial customers and
communities it) west central Indiana and central:
fllfinos.
One aspect of the project iinvollved rehabilitationi of
an existing 100,000 gaUloni legged elevated water Project StatiOlics
storage tank. Servlces provided inClUded. Client Name [NOWpott Chemical Depot
Elevated tank Inspection to identify reqluired ReuseAtithority,
' t 00,000
Improvements. The inspection found that num�et'OUS ConstmliCbon Cos1$5
features of the tank were non-compliant with
current safety codes, windage rods,providing Project Reference
support to the tank needing adjustiment to prevent Bob Grewe,Executive Dirctor
structural deterioration,and the interior and exterior 1051W. Indiana Ave.
coating systerns had elevated levels of lead that Hillsidaile, Indiana 4,7854
required rernediation, 765-245-2415
Design,of structural and coating system bob.grewe,@vermillliQr,')rise,com
Improvements,.The design addressed code
compliance,�saifety,structural,and complete blasting Plect
and,recoating of the,interior and exterior of the taro Teamnk. i
preparation of construction bid clocurnents. Plan Client Mianagie'r,, IRanOy Patchett
drawings and specifications were developed. Project Manager:Joe IDarlington
Bid phase services. DistObubng plans in paper arid Construction Manager: Joe Darfington
electronic format, logging jnqUirieS,tabulating bids
and providing a bid recommendation for award of Services Provided
the project. an lnspection
Regulatory&permitting support. A construction Design
perimit was obtained from,the 4idiansa Departnient RegUiatory&Permitting Support
of Environmental Management,
Resident project representative services. Subrnttal Cost,Estimating
review,construction inspection,change order Bids Phase,Services
preparation, pay application, processing, record CoinstrUction Ilnspecfion
drawings, Resident Project Representative
BURNS
a�ISDONNELL` 01
Elm
(AMPBELL & MAPLEWOOD ELEVATED TANK STRUICTURAL & COATING
REHABILITATION
Village of Rantoul Raiii Ii..
Multiple elevated tanks provide storage in the Village
,j them are the
of Rantoul's waiter s,yste�mi.Arnonic
1-niIiIIIIon-gallon spheroidal elevaite,d tank at Campbell
Street and the 5,0101,000-ga Ilion l�egiged elevated
tank at Maplewood Il rIive. Both tanks required
structural and coating rehabilitation, and upgrades
to various tank features to rneet new OSHA safety
requirements.
The Project included blasting and reco�ating off the
interior and exterior of the Campbell Elevated Tank,
spot-blasting and over-co,ating of the interior and Pit ojett'statistics
exterior of the Maplewood Elevated Tank, various
improvements to the Tanks' safety measures,
steel work, diis,infection and site restoration, Construction Cbst], $1M
Burns& McDonnell prepared bid documents with a
complete scope of work, A construction permit from Prpiect . if f ence
the lilliinoiIs Envirionirnental Protection Agency was, Gireq Hazel, ittarof Pilit Works
also obtained. 20,01'W, Grove Ave.
Burns& McDonnell provided bidding phse Rantoul,, IllinoiIs 1866
6
217-892-6526
administration services, logging inquiries, 9,-hazel@villaige,r�htout.it,u:s
distributing plians, in paper and electronic format,
tabulating bids ain,d proviiding a bifid recommendation
Poillm:
for award of the project. rjoct Tea
,Client Manager Randy Patchett
Burns & McDonnell also provided constrUCtion Project Manager,Joe Parflington,
observationandl inspection services. On site Constructi'on,Manager:Steve CredO,
construction inspectIIon for, the duration of the Resident Representative., Matt Diunliop,,EIT
project inClUding review of subrnittals,andl shop
drawings, observing the work for conformance Services,ProVilli dIe'
d
with the contract construction documents, review Elevated Tank Inspktion
progress and final pay requests prepared by the Coafing$ysteirn Design
contractor, review change orders,, notify the Village Bid DocurnetiiitOr4peratibh
of items not in conformance and providing photo
docurnientation of the project, Permitting
ConstructIon,Services
BURNS&MISDONNEW 0
Present! work load ,
Burns & McDonnelH is a 910bal firrn with over 10 dstinct bt-usiness lines. Staff assigned to
the Village of Mo�,,rnt ProsN,-)ect RehaL)ihtation of d-ue '1,000,000 Galk)n Station SN Gro�.wd
Storage Tank pr(.,)ject are a part of OUr Chicago-area Water Practice, A tabdattoner of t�)�s
grouip's CUrrent project workload is below.
MM,MMM
BurrMdqe�Villiage of Ounty Line Road Md"* Design(Civil) $70,000 6 months Crede 101%
Improvements
flk'Grove,Viflage if' 6reepleaf&Busse Pump, Design Mater) $2,00000 1 year Dadington 101%
Stations Rehabilitation 3200,000)
Lord Street Phase 0 and DesignUiOnstru(tion $30,0010,00,01
Elgin,City of Basin 102Atombineld Sewer Services,(Water„ ($3f500,000), 5 years Crede '75%
Separation Stormwater&Wastewater)
fox River Water Re(famation Phase III&IV Sludge force (Onstruiction Servi(es $3,700,0100 9 moiniths (rede 25%
District Main (Wastewaler); Dunlap
frankfort,Village of Wastewater Treatment Plant Program Mainageiment $60,000,0010 5 years Otdie 30%
(onsalidaflon,Prograrn (Wastewater) ($1,200,000), Darlington
6eneral Electric Orp. Strother Field 161ronimentM Program Mainagemient (onfidential Ongoing Pat(hett -
Services
Newport(hemical Depot Agreed Order Support Owner's Engineering $28,1001) 6 months Darlington 501%
Russe Authority(Ne(DRA)
Northwest Uburtian Joint Darlington
A(fion,'Water Ag�ency Ownv's Engineering Owner's Engineering As-requested Ongoing
(ISMAWA),
Rantoul,Village of Industrial Park Force Main Study(Wastewater) $15,000 1 year Apker 910%
Darting*
Rantoul,Village of Village Engineering Village Engineering As-irequested Ongoing Darlington
(Various), Pat(hett
Rantoluk Village of Sodium Hypochlorite Systern Design Matef)i $11,500, 3 months Darlington
Concept Design, Patchett
BURNS.\%
WDONNELL' 0
w
I r �
Thorn Fre0k Basin Sanitary Annex North Road and �A knr,
District Fem(ung keh i�lltatiirun � �r�imgi�im
UnRen Aftfines fangs°R OH/Water OH/WaterCnmshuffi�lon erO(e $40:,01001 3 months Dunlop 80
e erator (Starwnwater)
"het leather Flow
DarlVilna Park, 'phage of Treatment Fadhty 9M Fundy(Wastewater) $]I 5,01010 3 m�nnths Patc a tom
tt
Schedule
'Wet Weather Flow g r��umgtrrn
Fills Patk,,VfllAOe of Fret emF't hty Chain& DeAn(Wastewater) $30,000 6 mollfttch
ett
Fhglht Replacement
Village of Mmint Prospect
Rehabilitatio" of the 1,000,000 G'allon Statio" 5N Gyrou"d Storage Tank
Estimated Fees for Design Engineerijig & Bid Phase Services
February 16, 2018
...... .......
lbiqh-iltallt Pro' ;
Village of'Mountl"rospect
Rehabilitation of the 1,000,000 Gallon Station 5N G'round StorageTank
Estimated Fees for Construction Management and Inspection Set-vices
February 16,, 2018
Coisihicitioll Resilknt Project PrRjed
Manager Prbject CliginOr Anjitant EX#Ovl�,$ "I'ask
Task,Ocscriptioln tl') t to) (9)
...........
rash I -!'E�)ordination 1,264
Preconstruction Conference 2 1 786
......................................
Project Management&Administration 2 2 81
..........
Task 2- Resident Erigincering& Inspection 15,366
Preconstruction Pholographs 2 25 $ 257
....... ...
Subrnittal Review 8 S 928
............
8
Resident Engineedng/1nspecfion 16 725 11.1
Titsk 3 - trmj_C�Ct_CI("�Tlj .......... 2,172
Punch List 2 12 50 1.7(!I
Conforming to Construction DOCUMOAS 4 408
.....................
Iota] hours is 1,12 2
1 lotirly Billing fWc 161 1() 1(Q. $78
subtotak S966 S 16,472 S408 S156 800 S 18,802
Tot-al Hoaars 154
N�q�,�,Isll: Tota I Fee S 18,,802
I lased on attonding t prqquc,,,,�meei�Yjg.
7
kased on kmr(4),hmws per da� I'cq,29�ile vkks per thc scope ofscEvicor,
Bascd on I'mv,14)htirs per Lhi�, fiw 2.site, visi I S md pj'cjxwijIp a punch I im,
IN
BURNS,\$MSDONNELL.