HomeMy WebLinkAbout05/07/2019 Bid Result - 2019-2020 Manhole Rehabilitation Program 5/22/2019 BoardDocs®Pro IL Agenda Item Details Meeting y 07, 2019 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE - 7:00 p.m. Category 13. VILLAGE Subject in to acceptjoint bid results for the 2019-2020 hle Rehabilitation Program i an amount not to exceed $95,543.25. Access Public Tye Action Preferred to May 07, 201 Absolute Date May 07, 2019 Fiscal Impact Yes Dollar Amount 95,543.25 Budgeted Yes Budget orc ter and Sewer Enterprise Fund Recommended Action Accept the lowest cost, responsive i from my Contracting of Winchester, Indiana for the 201 - 2020 Annual Manhole Rehabilitation project for an amount not to exceed $95,543.25 in 2019. Expendituresin the second year of the contract will be limited funds appropriatedfor this purpose in the 2020 budget. Public Content Information As rt of routine preventative maintenancecondition assessment work, Public Works crews recently performed smoke testingin various portions of the separatesanitary sewer system. Smoke testing is a process utilized identify leaks and structural defects in buriedpipes manholes not readily discernible thr visual inspection. In summary, if smoke can escapestructure through a crack or defect, unwanted clear water (rain ter) can also enter. This process, corroborated by subsequent visual inspection,, identified nholes requiring tniv rehabilitation. In the past,, this work has usually involved excavation, removal, and complete replacement of the defective structure. This year ,, rss to utilize grouting and lining processin lieu complete replacement. scope of proposedwork includes power washing the structure, grouting II joints, and applyingcementitious coating. video depicting the process can be viewed at this link: https://www.youtube.com/manhole lining The Village s not utilized this process in the past. However, the system has been successfully applied in Rolling Meadows and Arlington Heights for several years. The anticipated life cycle of a lined manholeis 50-75 years; roughly equivalent to a new manhole. Mostimportantly, the cost of lining is substantially cheaper than replacement. line manhole (48"" diameter @ 9-foot h) i $1,400. For comparison,, the cost to remove replace a manholei $3,,500. The Municipal Partnering Initiative (MPI) has prepared let a two (2)-year manhole lining bid. Participation in this joint bid satisfies the Village's public bidding requirements. A copy of this bid documentis attached. https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 1/3 5/22/2019 BoardDocs®Pro This year, the MPI project consists of 1.,035 vertical feet of manhole wall coating. Four (4) municipalities are participating in the bid including the Village of Arlington Heights., Village of Glenview, Village of Bannockburn, and the Village of Mount Prospect. This joint bid will be administered by the Village of Arlington Heights. A map depicting locations for Mount Prospect work is attached. Bid Results The bid documents were posted by The Village of Arlington Heights and publicly advertised as required by Village Code. Bids were opened and read aloud at on April 16,, 2019 at the Arlington Heights Village Hall. The following six (6) firm has submitted bids: BIDDER Bid Bond Option #1 Option # 2 Culy Contracting Yes $86,857.50 $173,182.50 Winchester, ,, IN RMS Utility Services Yes $92,935.00 $142,960.00 Crystal Lake., IL Natl. Power Rodding Yes $113f300-00 $199,550.00 Chicago, IL Michels Yes $143f860-00 $240f460-00 Brownsville,, WI Redina Construction Co. Yes $145,733.76 $201,089.01 Glen Ellyn,, IL Visu-Sewer of Illinois Bridgeview,, IL Yes $183,320.00 $308f095.00 Discussion All bids were reviewed to ensure that the documents had all appropriate signatures and requisite bid security. The low bidder, Culy Contracting of Winchester, Indiana had all appropriate documents, security and signatures. A copy of their bid sheet is enclosed. Culy Contracting has not previously worked for the Village. However, staff contacted their references and all indicated acceptable performance. Some of their jobs included work for the Village of Arlington Heights and the City of Rolling Meadows. In addition, they successfully lined over 600 vertical feet of manholes for the City of O"Fallon, Missouri and over 262 manholes for the Fall Creek Regional Waste District in Pendleton,, Indiana. Staff recommends accepting Culy Contracting bid for a 2-year contract for option #1. The work includes full power washing of the interior of each manhole, grouting of all voids within the manhole, applying a cementitious coating to the interior of the manhole and a pre/post manhole construction video inspection report. Option #2 works cii in the bid documents includes a full depth epoxy liner applied over the cementitious coating. Thee oxy coating is only beneficial for manholes that have high levels of hydrogen sulfide gas (H2S); an uncommon condition in Mount Prospect sanitary sewer manholes. Consequently,, staff does not recommend incorporating this scope of work in the Village's contract award. Staff also requests a 10% contingency ($8,685.75) be applied to the contract award in order to address quantity variances or unforeseen it conditions. A 10% contingency and option #1 work will bring the project award total to $95f543.25 ($86,857.50 option #1 bid plus the $8,685.75 10% contingency). Alternatives 1. Accept lowest cost,, responsive bid for a 2-year Manhole Rehabilitation Program. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board accept the lowest cost, responsive bid from Culy Contracting of Winchester, Indiana for the 2019 - 2020 Annual Manhole Rehabilitation project for an amount not to exceed $95,543.25 in 2019 https://www.boarddocs.com/iI/vomp/Board.nsf/Private?open&Iogin# 2/3 5/22/2019 BoardDocs®Pro Expenditures in the second year of the contract will be limited funds appropriated for this purpose in the 2020 budget. Manhole Rehab 2019.pdf , , Contracting.pdf (460 KB) Administrative Content Executive Content Motion &Voting Accept the lowest cost, responsive bid from ly Contracting of Winchester, Indiana for the 2019 - 2020 Annual Manhole ili tion project for an amount not to exceedin 2019. Expenditures in the second year of the contract will be limited funds appropriatedfor this purpose in the 2020 budget. Motion y Michael Zadel, second y Richard Rogers. Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzisf Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 3/3