Subject 13.4 Motion to acceptproposal for engineering services to construct an elevator addition
the Emerson Street ParkingDeck and conduct feasibility study for Construction of
Pedestrian Bridge over Main Streetin an amount not to exceed $131,587.50.
Access Public
Tye Action
Preferred to May 07, 2019
Absolute Date May 07, 2019
Fiscal Impact Yes
Dollar Amount 1311587.50
Budgeted Yes
Budget rcIncrement Financing Fun
Recommended cin Accept the proposal from s n Design Management of Chicago, Illinois to providedesign
and construction engineering services for the Emerson Street ParkingDeck Elevator
Addition as well as the Desmanr o I to conduct i ili study of the Main Street
Pedestrian Bridge in a total amount not to exceed $131,587.50.
Public Content
Information
The 2019 Strategic Plan identifies construction of a passenger elevator addition to the EmersonStreet Parking Deck
as a high priority initiative.
The purpose of this proposed project is to improve access to parkingfor the Downtown Mount Prospect i
District in general, and for a proposed square-foot restaurant nr idistrict bounded by
Northwest Highway., Busse Avenue,, and Route (Elmhurst Road/ iStreet) in particular.
feasibility y performed in 2016 identified the southwest corner of the deck as the mostviable location for a new
elevator. For structural reasons, the elevator will have to be constructed on Village-ownedproperty outside the
existing footprint the parking deck. The attachedis the approximate location.
To further develop this project, it is necessary to developplans and specifications suitable for public bidding. To this
end, staff developedit request for proposals (RFP) to secure requisite engineeringservices. In addition
developing i c , the RFP also solicits construction engineering andinspection services necessary o
effectively monitor the construction phase of the project. A copy of this RFP is attached.
RFP Results
Technical and cost proposals were received from Ir Parking Consultantsof Elgin, Illinois and Desman Design
Management of Chicago, Illinois. Both of these firms specializein the niche industry of parking deck design
https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 1/3
5/22/2019 BoardDocs®Pro
construction. Evaluation of the technical proposals is indicated in Table 1 below. Cost proposal analysis is summarized
in Table 2.
Table 1: Technical Proposal Evaluations
Category Max Points Desman Walker
Background 20 19 18
Experience 20 19 14
Scope 25 18 15
Schedule 15 13 10
Work Effort 10 8 6
Content 0 9
ITota 1: 100 93 75
Table 2: Cost Proposal Summaries
Firm Hours Total Cost Cost Hour
Desman 468* $90,875 $194
Walker 496 $91,080 $184
,Averages: 482 1$90f977 $18 ,
Does not include sub-contractor hours for MEP or civil engineering.
Discussion
Although both firms indicated equally skilled staff and ample experience, staff determined that Desman is uniquely
qualified for this proposed project due to their roles as designers and construction engineers of the existing Emerson
Street Parking Deck. Notably, they have proprietary access to design and as-built drawings,, construction
specifications, calculations, beam and column schedules, geotechnical reports, foundation plans, and a comprehensive
understanding of the overall garage function.
Inadditionf Desman also demonstrated sufficient experience with similar projects including the addition of passenger
elevators to the of h/ parking structure in Chicago,, Illinois and the addition of an elevator tower to the
it Center garage in St. Louis, Missouri.
Furthermore, Desman submitted the lowest cost proposal. Staff is confident the firm has allocated sufficient work
effort for this proposed project.
Additional Engineerin.g_(Main Street Pedestrian Bridge Feasibility Study).
Subsequent to receipt of Desman"s proposals for the elevator addition, staff asked the firm to submit a proposal to
provide additional engineering necessary to complete a Phase 1 feasibility study for the construction of a pedestrian
bridge connecting the new elevator structure to the west side of Main Street (IL out 83/Elmhurst Road). Although
this project is not scheduled or budgeted, recent difficulties securing Illinois Department of Transportation (IDOT)
approval to construct at-grade pedestrian crossing improvements at the in Street and Busse Avenue
intersection suggest that the present is an opportune time to examine the viability of an elevated crossing.
Furthermore, due diligence work for the pedestrian bridge could suggest prudent accommodations that could be cost-
effectively incorporated into the design of the parking deck elevator tower.
The scope of proposed work includes examination of existing site conditions,, identifying utility requirements, clarifying
Illinois Department of Transportation requirements, assessing structural elements, determining site constraints,,
establishing cost estimates, and developing concept plans.
Desman complied submitting proposals to provide requisite work in conjunction with Cage Civil Engineering of
Downers Grove, Illinois. Copies of the Desman/Cage proposals are attached. The firms propose a reasonable work
effort (140 hours - not including MEP or civil engineering sub-consultant work) for a fee of $31,,625.
It is the opinion of staff that the Desman and Cage joint venture is uniquely well qualified to examine the feasibility of
constructing a pedestrian bridge over Main Street connecting the proposed new parking deck elevator tower to a
landing structure on the west side of Main Street. As previously noted, Desman has proprietary familiarity with the
existing parking structure. Cage augments the team with it experience as civil engineers for the ""20 West" ixed-
v l currently under construction in the "Small Triangle,"'area on the west side of Main Street.
Staff recommends that the project award include a 10% contingency attached to the elevator addition work to
account for it conditions and construction variances beyond the engineers' control. In this instance, staff
recommends a $9,,087.50 contingency (10% of $90,,875 fee for elevator addition work). The total recommended
https://www.boarddocs.com/iI/vomp/Board.nsf/Private?open&login# 2/3
5/22/2019 BoardDocs®Pro
project award includes the fees for elevator addition work, the pedestrian bridge feasibility study, and the suggested
contingency. Table 3 below summarizes this recommendation:
Table 3: Award Recommendation Summary --7Award
Work Task
Elevator Addition Phase 2 and Phase 3 Engineering $90,875.00
% Construction Contingency for Elevator Addition 11$9f 087.50
Main Street Pedestrian Bridge Feasibility to $31f625.00
ITotall Recommended Award: 1$1311587.5
Alternatives
1. Accept proposals from Desman Design Management fors cii ineering services related to design of the
Emerson Street Parking Deck Elevator Addition and the Main Street Pedestrian Bridge Feasibility Study.
2. Action at discretion of Village Board.
Staff Recommendation
Staff recommends that the Village Board accept the proposal from Desman Design Management of Chicago, Illinois to
provide design and construction engineering services for the Emerson Street Parking Deck Elevator Addition as well as
the Desman proposal to conduct a feasibility study of the Main Street Pedestrian Bridge in a total amount not to
exceed $131,587.50.
DESMAN—CostProposal—MtProspectElevatorAddition-4-8.19.pdf (424 KB)
DESMAN—TechnicalProposal_MtProspectElevatorAddition-4.8.19.pdf (3"981 KB)
Location Map.pdf (583 KB)
MOUNT PROSPECT PARKING DECK ELEVATOR ADDITION — PHASE 2 AND PHASE 3 RFP.pdf (86 KB)
DESMAN—COST-Proposal—PhaselEng—MainStPedestrainBridge—VOMP-4.15.19.pdf (1f424 KB)
DESMAN—TECHNICAL-Proposal—PhaselEng—MainStPedestrainBridge—VOMP-4.15.19.pdf (6,591 KB)
Administrative Content
Executive Content
Motion &Voting
Accept the proposal from Desman Design Management of Chicago, Illinois to provide design and construction
engineering services for the Emerson Street Parking Deck Elevator Addition as well as the Desman proposal to
conduct a feasibility study of the Main Street Pedestrian Bridge in a total amount not to exceed $131,587.50.
Motion by Richard Rogers, second by Michael Zadel.
Final Resolution: Motion Carries
Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers,, Colleen Sacolli, Michael Zadel