Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
13.4 Motion to Accept Proposal for Engineering Services - elevator addition to Emerson Street Parking Deck
5/17/2019 BoardDocs® Pro Agenda Item Details Meeting May 07, 2019 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m. Category 13. VILLAGE MANAGER'S REPORT Subject 13.4 Motion to accept proposal for engineering services to construct an elevator addition to the Emerson Street Parking Deck and conduct a feasibility study for Construction of a Pedestrian Bridge over Main Street in an amount not to exceed $131,,587.50. Access Public Type Action Preferred Date May 07, 20115' Absolute Date May 07, 20115' Fiscal Impact Yes Dollar Amount 1311587.50 Budgeted Yes get Source Tax Increment Financing FunU Recommended Action Accept the proposal from Desman Design Management of Chicago, Illinois to provide design and construction engineering services for the Emerson Street Parking Deck Elevator Addition as well as the Desman proposal to conduct a feasibility study of the Main Street Pedestrian Bridge in a total amount not to exceed $131,587.50. Public Content The 2019 Strategic Plan identifies construction of a passenger elevator addition to the Emerson Street Parking Deck as a high priority initiative. The purpose of this proposed project is to improve access to parking for the Downtown Mount Prospect Business District in general, and for a proposed 30,000 square -foot restaurant and entertainment district bounded by Northwest Highway., Busse Avenueand Route 83 (Elmhurst Road/Main Street) in particular. A feasibility study performed in 2016 identified the southwest corner of the deck as the most viable location for a new elevator. For structural reasons, the elevator will have to be constructed on Village -owned property outside the existing footprint of the parking deck. The attached map depicts the approximate location. uest for ProDosals To further develop this project, it is necessary to develop plans and specifications suitable for public bidding. To this end, staff developed a detailed request for proposals (RFP) to secure requisite engineering services. In addition to developing bid documents., the RFP also solicits construction engineering and inspection services necessary t* effectively monitor the construction phase of the project. A copy of this RFP is attached. F1'kTM,X1'6rZTMV Technical and cost proposals were received from Walker Parking Consultants of Elgin, Illinois and Desman Design Management of Chicago, Illinois. Both of these firms specialize in the niche industry of parking deck design and https://www.boarddocs.com/iI/vomp/Board.nsf/Private?open&Iogin 1/3 5/17/2019 BoardDocs® Pro construction. Evaluation of the technical proposals is indicated in Table 1 below. Cost proposal analysis is summarized in Table 2. iaDie _L: iecnnicai Froposai tvaivavons Category Max Points Desman Walker Background 20 19 18 Experience 20 19 14 Scope 25 18 15 Schedule 15 13 10 Work Effort 10 8 6 Content 0 9 ,Tota 1: 100 93 175 Table 2: Cost Proposal Summaries * Does not include sub -contractor hours for MEP or civil engineering. Although both firms indicated equally skilled staff and ample experience, staff determined that Desman is uniquely qualified for this proposed project due to their roles as designers and construction engineers of the existing Emerson Street Parking Deck. Notably, they have proprietary access to design and as -built drawings, construction specifications, calculations, beam and column schedules, geotechnical reports, foundation plans, and a comprehensive understanding of the overall garage function. In addition, Desman also demonstrated sufficient experience with similar projects including the addition of passenger elevators to the Randolph/Wabash parking structure in Chicago,, Illinois and the addition of an elevator tower to the Kiel Center garage in St. Louis, Missouri. Furthermore, Desman submitted the lowest cost proposal. Staff is confident the firm has allocated sufficient work effort for this proposed project. Subsequent to receipt of Desman's proposals for the elevator addition, staff asked the firm to submit a proposal to provide additional engineering necessary to complete a Phase 1 feasibility study for the construction of a pedestrian bridge connecting the new elevator structure to the west side of Main Street (IL Route 83/Elmhurst Road). Although this project is not scheduled or budgeted, recent difficulties securing Illinois Department of Transportation (IDOT) approval to construct at -grade pedestrian crossing improvements at the Main Street and Busse Avenult_; intersection suggest that the present is an opportune time to examine the viability of an elevated crossing. Furthermore, due diligence work for the pedestrian bridge could suggest prudent accommodations that could be cost- effectively incorporated into the design of the parking deck elevator tower. The scope of proposed work includes examination of existing site conditions, identifying utility requirements, clarifying Illinois Department of Transportation requirements, assessing structural elements, determining site constraints,, establishing cost estimates, and developing concept plans. Desman complied submitting proposals to provide requisite work in conjunction with Cage Civil Engineering of Downers Grove, Illinois. Copies of the Desman/Cage proposals are attached. The firms propose a reasonable work effort (140 hours - not including MEP or civil engineering sub -consultant work) for a fee of $31,625. It is the opinion of staff that the Desman and Cage joint venture is uniquely well qualified to examine the feasibility of constructing a pedestrian bridge over Main Street connecting the proposed new parking deck elevator tower to a landing structure on the west side of Main Street. As previously noted, Desman has proprietary familiarity with the existing parking structure. Cage augments the team with their experience as civil engineers for the ""20 West"' mixed- use development currently under construction in the "Small Triangle,"' area on the west side of Main Street. Staff recommends that the project award include a 10% contingency attached to the elevator addition work to account for field conditions and construction variances beyond the engineers' control. In this instance, staff recommends a $9,,087.50 contingency (10% of $90,875 fee for elevator addition work). The total recommended https://www.boarddocs.com/iI/vomp/Board.nsf/Private?open&Iogin 2/3 Averages: * Does not include sub -contractor hours for MEP or civil engineering. Although both firms indicated equally skilled staff and ample experience, staff determined that Desman is uniquely qualified for this proposed project due to their roles as designers and construction engineers of the existing Emerson Street Parking Deck. Notably, they have proprietary access to design and as -built drawings, construction specifications, calculations, beam and column schedules, geotechnical reports, foundation plans, and a comprehensive understanding of the overall garage function. In addition, Desman also demonstrated sufficient experience with similar projects including the addition of passenger elevators to the Randolph/Wabash parking structure in Chicago,, Illinois and the addition of an elevator tower to the Kiel Center garage in St. Louis, Missouri. Furthermore, Desman submitted the lowest cost proposal. Staff is confident the firm has allocated sufficient work effort for this proposed project. Subsequent to receipt of Desman's proposals for the elevator addition, staff asked the firm to submit a proposal to provide additional engineering necessary to complete a Phase 1 feasibility study for the construction of a pedestrian bridge connecting the new elevator structure to the west side of Main Street (IL Route 83/Elmhurst Road). Although this project is not scheduled or budgeted, recent difficulties securing Illinois Department of Transportation (IDOT) approval to construct at -grade pedestrian crossing improvements at the Main Street and Busse Avenult_; intersection suggest that the present is an opportune time to examine the viability of an elevated crossing. Furthermore, due diligence work for the pedestrian bridge could suggest prudent accommodations that could be cost- effectively incorporated into the design of the parking deck elevator tower. The scope of proposed work includes examination of existing site conditions, identifying utility requirements, clarifying Illinois Department of Transportation requirements, assessing structural elements, determining site constraints,, establishing cost estimates, and developing concept plans. Desman complied submitting proposals to provide requisite work in conjunction with Cage Civil Engineering of Downers Grove, Illinois. Copies of the Desman/Cage proposals are attached. The firms propose a reasonable work effort (140 hours - not including MEP or civil engineering sub -consultant work) for a fee of $31,625. It is the opinion of staff that the Desman and Cage joint venture is uniquely well qualified to examine the feasibility of constructing a pedestrian bridge over Main Street connecting the proposed new parking deck elevator tower to a landing structure on the west side of Main Street. As previously noted, Desman has proprietary familiarity with the existing parking structure. Cage augments the team with their experience as civil engineers for the ""20 West"' mixed- use development currently under construction in the "Small Triangle,"' area on the west side of Main Street. Staff recommends that the project award include a 10% contingency attached to the elevator addition work to account for field conditions and construction variances beyond the engineers' control. In this instance, staff recommends a $9,,087.50 contingency (10% of $90,875 fee for elevator addition work). The total recommended https://www.boarddocs.com/iI/vomp/Board.nsf/Private?open&Iogin 2/3 5/17/2019 BoardDocs® Pro project award includes the fees for elevator addition work, the pedestrian bridge feasibility study, and the suggested contingency. Table 3 below summarizes this recommendation: Table 3: Award Recommendation Summary Elevator Addition Phase 2 and Phase 3 Engineering $90,875.00 10% Construction Contingency for Elevator Addition Main Street Pedestrian Bridge Feasibility Study 31,625.00 ------ -71 .......... . !III!!!!!!!!!!!!!!!!!!! !!III!!!!!!!!! .............. !!!!!!!III!!!!!!!!! !!!!!!!!!!!!!!!III!!!!!!!!! ................ .......... ................................................................................... Total Recommended Award: P-1 tO 1. Accept proposals from Desman Design Management for specified engineering services related to design of th-iq"- ; Emerson Street Parking Deck Elevator Addition and the Main Street Pedestrian Bridge Feasibility Study. 2. Action at discretion of Village Board. I Staff Recommendation Staff recommends that the Village Board accept the proposal from Desman Design Management of Chicago, Illinois to provide design and construction engineering services for the Emerson Street Parking Deck Elevator Addition as well as the Desman proposal to conduct a feasibility study of the Main Street Pedestrian Bridge in a total amount not to exceed $131,587.50. DESMAN—CostProposal—MtProspectElevatorAddition-4-8.19.pdf (424 KB) DESMAN—TechnicalProposal_MtProspectElevatorAddition-4.8.19.pdf (3"981 KB) Location Map.pdf (583 KB) MOUNT PROSPECT PARKING DECK ELEVATOR ADDITION — PHASE 2 AND PHASE 3 RFP.pdf (86 KB) DESMAN—COST-Proposal—PhaselEng—MainStPedestrainBridge—VOMP-4.15.19.pdf (1f424 KB) DESMAN—TECHNICAL-Proposal—PhaselEng—MainStPedestrainBridge—VOMP-4.15.19.pdf (6,591 KB) Administrative Content Executive Content Motion & Voting Accept the proposal from Desman Design Management of Chicago, Illinois to provide design and construction engineering services for the Emerson Street Parking Deck Elevator Addition as well as the Desman proposal tit, conduct a feasibility study of the Main Street Pedestrian Bridge in a total amount not to exceed $131,587.50. Motion by Richard Rogers, second by Michael Zadel. Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers,, Colleen Saccotelli, Michael Zadel https://www.boarddocs.com/iI/vomp/Board.nsf/Private?open&Iogin 3/3 I I I I J j j I J)J, ifl, poi I I w fwig)"1411 J)), J, IM W111INNl#j] OYAWN, rvmmumllllll ja wiff .......... .............. ............... N ll�I �� ffdff Mfffn NO . ............ r/m/w/00OlJ/001111" L j j )MM)VA); h a s e 2, a n d h a s e Engineering for uum [�)assenger Elevator' Addition to the E M Elll'b 1ni S 0 114 S T R E E InnioPARKING L , mniK V�III ........... r c))'111111111111ffffffjGP "EMOo sILAN 0, �PU CI�R�K B.I W0 S ...... Attn: Sewn Darsey Director of Public Workol M o �u n t ),,f�;���(((,�"ospect War1[t///////,/,,s Dep&rt� tr e n t 1700 W. Central Road Mount Prospect,, IL 60056 Ph. 847.870.5640 1 sdorsey@mountprospect.org 007 11111 Design Mailr-"ijagement 20 N. Clark Street, 4th Floor Chicago, IL 60602 Point of Contact - Stephen J. Rebora Email - srebora@desman.com R 312.263.8400 www.DESMAN.,co�iii,,,/,F,///"o,/ a in collaboration with. - ,gin Heinnemian Engineering In CAG E energy. focused.' IFEE St J IM IVI )"Ikl II Y DESMAN proposes a fee of $90,875 broken down into the amounts listed in the table for the addition of an elevator to the Emerson Street Parking Structure. Service include Parking Structure Design modifications, including Architectural, Structural Engineering, Civil Engineering/Landscape, and MEP/FP Engineering services as described in the RFP and herein. Exclusions to the Fee Observation, assessment, reporting and any responsibility regarding the discovery, presence, handling, removal and disposal of, or exposure of persons to, hazardous materials in any form at the project site, including but not limited to, asbestos, asbestos products, lead, polychlorinated biphenyl (PCB) or other toxic substance; • Reimbursable expenses for travel, if required for the project other than local travel, printing and reproduction of project documents for internal and external review, permitting and bidding purposes, messenger/overnight mail delivery charges or any other out of pocket reimbursable expenses deemed necessary such as mileage, parking etc., in connection with performance of the Scope of Services with your approval. Expense invoices will be issued separately from professional service invoices with original receipts attached. Expenses will be billed by DESMAN at direct cost without any additional mark-up for administration and handling. ® Soil Testing and Geotechnical Engineering: • Phase I or 11 Environmental testing services or reports- • Traffic Engineering. � , o'.), a s a Village of Mount Rirospect Public Works Cos l� .... .. ....II COST Sir oposal - Pl,-iase 2 & 3 Engir�-ieer-hng Elevator-, Additior-i to Ern&irson Street Par -king Deck P a g eII -Fu Ln Ln lG Ln 0 0 F - 00 q* Ln 4) w a o Ln Ln V). Ln X Wi CC M 0 0 0 th 4A 44 mm �40 -0 C 0 Ln % 0 Ln 0 Ln ui Ln V). Ln AA. V). Ln -kn z El OA Ln C-) Q) N Ca U" Q) Ln C) (::) C) U) co C) Ln u) cz) 6 Q) M C* Ln 00 �6 r" Ln Ln , T., qr-'m -1 Ln m '%� �6 00 V). V)- V), fn tri. CN Arl- t4 V�. V11- N in � 00 r�4 t.0 0 M rr'J r-4 (3) 0 r14 ON C', m 00 'D w Ln T-4 r4 00 O (Z) oo W "o N r -A Lnct O OLn O Ln O O O O c) O c) M o0 ui Ln U') Ln rn 9.0 IZT co 'q- W lz:r CL 4 M r,4 CM m pup Ln r-- rq en %_4 0 00 :t 00 't Ln Mp�ufq q* d O O en r-4 O N T-4 H 00 00 O V C ca D u LU 0. 0 z 0 0 4-f ra LL 0 LLJ JVhf a%"`r,' 4° C) QJ Q M L - CA ME Qj Qj Qu 4-1 m in cc If, 11 f CL CL = CL Sl- m ro (-j b4O0 z -zz 0 f I o cr. CL L. 0) a r -L Ln CC) r- (J CL Cl) Ln W V1 Ll ........... �A G E 0 F M 0 LJ N T P R 0 SIE C"I"" IL000iuJI IC WOP�......RKS Attn.- Sewn Da�l",sey Director of Public Works Mount ilu0 Departme��i� il 1700 W. Central Road Mount Prospect,, IL 60056 Ph. 847.870.5640 1 sdorsey@mountprospect.org '107 11111 Design M a lr-"ij a g e m e n t 20 N. Clark Street, 4th Floor Chicago, IL 60602 Point of Contact - Stephen J. Rebora Email - srebora@desman.com R 312.263.8400 www.DESMAN.,cmr,",F oi, a in collaboration with. - In Hennemian Engineering In CAG E energy. focused.' Sean Dorsey Director of Public Works Village of Mt. Prospect 1700 W. Central Road ® Prospect, IL 60056 Re.- Phase 2 and 3 Engineering for Passenger Elevator Addition to The Emerson Parking Deck '111 W', 0, Alm A AJw Sincerely, DESMAN, Inc. Stephen J. Rebora, R.A. President Village of Mount Prospect Public Works Fe. cKin ical IISroposal - P[iase 2 & 3 Engiii ineeriii ng III evator Addition to Emerson Street Parking Deck P a g e LINE OF BUSINESS AND ORGANIZATIONAL STRUCTURE "At DESMAN, we love what we do. It's not work; it's fulfilling our passion to collaborate on great projects that make a difference in the communities in which we live and work." - Steve Rebora, President DUI' SMNINJ 0I iHICAGO GII III °' 20 N. Clark Street, 4th Floor Chicago, IL 60602 p. 312.263.8400 1312.263.8406 ®c jhenriksen@desman.com AFIIIHI Ul, 1141% 1`10NS Institute of Certified Planners (AICP) Institute of Transportation Engineers National Parking Association United States Green Building Council (USGBC) LEED AP BD+C USGBC's Parksmart Parking Consultants Council of National Parking Association (N PA) Over 5,000 95% Repeat Over 1010 Parking 9 off Ice's DESMAN is a leading national firm specializing int planning, design and construction administration of cost-efficient and aesthetically pleasing parking structures within the United States and around the world. Our firm was founded in 1973 as an abbreviation for Design Management with the vision to combine creativity with innovation. Our projects consistently reach a balance of efficiency, durability and value. We are parking garage experts and that expertise also applies to elevator design in garages, whether it Is part of the original design or added to the exterior post -construction. We are also uniquely qualified in maintaining parking operations while under construction. Since the firm's inception, DESMAN has served public, private, and institutional clients and owners and has provided planning, design, and restoration services on over 5,000 parking projects. The majority of our experience has been on parking projects similar in nature to the Emerson Street Parking Deck in Mount Prospect. DESMAN is an employee -owned corporation that currently employing a staff of over 100 personnel and operates nationally from nine office locations, including an Office in Chicago. Pa�ii,,11?11"Ing �,�,,Oated se�,,0ces offered 1:,.7;,,y DESMNr,,,JJ, llndllude: r-ItfVdLUI MLILIILIUH�) Architecture Structural Engineering Functional Design Site Evaluation Adaptive Reuse ® Engineering Parking Studies and Opera tior Parking Access and Revenue C Site Observation and Constru( DESMAN's design practice does not treat parking facilities as storage buildings, but rather as meeting s® Our philosophy is to integrate parking facilities into the infrastructure to accentuate the arrival experience rather than to hide it. As designers we focus on solutions to deliver a positive user experience from both infrastructure and aesthetic perspectives. We know good design does not matter if quality is not followed through in all phases of design, from conceptual design to construction administration. International Parking & Mobility ® in the design of parking structures to this assignment. Institute (IPMI) In short, our parking designs are functionally efficient and cost effective, sustainable and www", ES M A N,,, co tni durable, while not compromising on user comfort with respect to traffic and pedestrian circulation, parking geometrics, safety and security. Village of Mount Prospect Public Works Fe. cKinical Proposal - P[iase 2 & 3 Engiii ir-ieeriii ing III evator Addition to Emerson Street Parking Deck Page 2, SIMILAR PROJECT'S WITS I REFERENCES Over 5,000 9SOA Repeat Orear 1010 Parking 9 off Ice's Kathleen Gargano Village Manager Village of Hinsdale 19 E. Chicago Ave Hinsdale, IL 60521 E. kgargano@villageofhinsdale.org P. 630-789-7013 The Village of Hinsdale hired the Design Build team of Wight/DESMAN to design and construct a 300 car parking ® This parking structure is two levels high with a portion being subterranean. The upper level is dedicated to parking for faculty and guests of the middle school. Whilst the lower level will be used for infrastructure parking for the public and the downtown activities. Both levels will be used for event parking. The building materials have taken cues from the design of the new middle school building. This parking deck will be completed in September 2019 for $6,500,000. 4* Ms. Nancy Bufalino Fenwick High School 505 Washington Blvd Oak Park, IL 60302 E. nbufalino@fenwickfriars.com P. 708-386-0127 Fenwick High School has planned a series of architectural improvements as part of their Master Plan. This Master Plan includes a new 356 car parking structure, a new formal entry and a new outdoor quadrangle. DESMAN was retained as the Architect and Engineer of Record for the design of the new parking structure, which is Phase I of Fenwick's overall Master Plan. The structure was designed to be 6 levels, 5 structured, and built on land fronting Scoville Avenue immedi- ately south of the ® The garage serves students, faculty and guests during school and after school events. The ing of the garage enables bus parking adjacent to the structure. The Cast -in-place PT structure is clad with an elaborately designed skin of random ashlar granite and cast stonework to produce a fagade to compliment the design of the historic high school facility built in the early 1900's. DESMAN is working with Henneman on this assignment as they are providing MEP/FP services. Village of Mount Prospect Public Works Fe. chriical IISroposal - P[iase 2 & 3 Erighneerhng III Addition to Ernerson Street Parking DE.?Cl( Page 3 0 E S tll�m �"A D e si g In M a In a g e e Ir �i t ORGANIZATIONAL CI IART OR PROJECT TEAM Over 5,000 9SIA Repeat Orear 1010 Parking 9 off Ice's Village of Mount Prospect Public Works Fe. cl,vinical Proposal - Rhase 2 & 3 Erigiii neerire g Uevator Addition to Emerson Street Parking Deck 1age 5 0 E S Atfiz- A Design Mar �ag&� le �r t KEY PERSONNEL Over 5,000 O IRepeat Orear 1010 Parking 9 off Ice's vo f f ly AT 'T IF ",Ir NIF lk JI Ift 011*1 It Alf" aw"fla W 11,110 W-1 in W"'W"OF Ill "ALTS, 01111I IfIff"A 1019 IF Yury Swetm.. P.E.., S.E. will the ��� STRUc ruRAL U1`,,,,,,,,,J,,G11J4E1ER for the elevator addition to the Emerson St Parking Deck. Yury has been with DESMAN for over 24 years and is one of the most respected and nowledgeable engineers in the parking industry. His vast knowledge and experience in parking structures will be a great asset to the project's success and long term durability. A principal with our firm is assigned to every pursuit and their role is to make sure our team meets or exceeds the expectations of the client. For this undertaking, Stephen J. Rebora., R.A. will be the G) Ft Ul C I Nil,,,, E. He will ensure that the necessary manpower is available for the efficient, cost effective and successful completion of the project. He will also review all draft and final drawings and documents before they are delivered for review and milestone deadlines to Mount Prospect. Matthew Schumacher, P.E. is a Director of Operations with Cage Civil Engineering and will serve as the LU Project Manager and main contact for the AM[ LAN DSCAI)� ��"%J.G portion of the project. Matt has over 13 years in the industry and has been the lead project manager on 4 projects in Mount V, Prospect. Cage is local to the area and is currently the Civil Engineer in charge of the adjacent Maple Street a I I important to the success of the elevator addition to the Emerson Street Parking Deck. Resumes of the key personnel above are included in the appendix at the end of the proposal. Village of Mount Prospect Public Works Fechriical IIS iirlloIIS osal - Rhase 2 & 3 Erigiii r-ieeriii rig III evator Addition to Emerson Street Parking Deck Page 6 RROJECT APPROACI I AND METI 10DOLOGY a Over S,000 9 iRepeat Over 1010 Parking 9 off Ice's We have thoroughly reviewed the scope identified in the RFP and have refreshed our memory of the work we createl, during phase one. We have also recentl ro,' Design Phase: DESMAN will review the recommended solutions presented in the Phase 1 report with the Village to determine the most viable concept for the placement of the new elevator tower. Conceptswill be evaluated to take into account the impact on existing operations, code analysis and the physical appearance of the proposed solutions. From this exercise, the team will prepare detailed plans and specifications suitable for establish a preferred solution to be developed into documents for bidding and construction. We shall assist in the securing of necessary permits, easements and rights of way to construct the proposed solution on property not under the direct control of the Village. DESMAN will supply a detailed cost estimate at the conclusion of the design phase. Final Deliverable; DESMAN will issue final plans and bid specifications necessary to publicly bid the project in a manner consistent with the Village of Mt. Prospect purchasing policy. I BIDDING DESMAN will prepare a bidding package, assist the hospital with advertising and attend Prebid conferences. DESMAN will assIst in review the thoroughness of the bids and offer clarifications if needed. Village of Mount Prospect Public Works TE-aIII r-flcal IISroposal - Phase 2 & 3 Engiii r-ieeriii ire g III Addition to Ernerson Street Par -king Deck Page 7 APPROACH AND METI 10DOLOGY I TEAM AVAILABILITY Over 5,000 95OA Repeat Orear 1010 Parking 9 off Ice's CONSTRUCTION ADMINils, rRATION P1 IASE The construction administration phase will commence upon completion of the permit process and will end after final payment is made to all Contractors or sixty (60) days after the date of substantial completion of the project, whichever occurs first. The Team will provide construction contract administration and on-site observation services throughout the construction phase as outlined in the RFR =1112 1" 111 jW11%1'1Q"FM i OR =1111,11111, MIN =22 rT A. Program Confirmation, Schematic Design and Construction Document Phases: is a month progress meetings -alternating on-site and Go -To -Meeting conference calls. B. Construction Administration — Site visits as needed to evaluate progress and design compliance. llipil 1 llp� 111111111" 1 ; Ill ir l � z'� iw"4 � "m � I � l r1myrom TEAM AVAILABILITY As a matter of routine, DESMAN carefully chooses staff members for each prospective consulting engagement based o their collective set of skills, training, back The following table is a listing of key individuals that we have assigned to the project along with their current work load, as requested. 11111 ESMA.1° Key Personnel Work Load Availability Individual Proposed Role on Project Key Projects Under Way Current Project Phase Time Required After April 8th, 2019 % of Time Available at Notice to Proceed Stephen Rebora Principal In Charge Hard Rock SC Garage Construction Does Less than 5% Excess of 60% Parking Design Specialist Hinsdale Middle School Garage Construction Does Less than 5% Fenwick High School Garage Design Development Less than 10% Columbus Convension Ctr Garage Design Development Less than 5% General Administration On Going Less than 15% Jeff Henriksen Project Manager Hinsdale Middle School Garage Construction Does Less than 15% Excess of 60% Fenwick High School Garage Construction Does Less than 15% Echo Park Construction Adm Less Than 5% General Administration On Going Less than 5% Dennis Williams Project Architect Fenwick High School Garage Construction Does Less than 15% Excess of 65% Univ of Pitt Schematic Design Less than 5% Powdermill Apartments Construction Does Less Than 15% Village of Mourit Rirospect Public Works TE-aIII riical IIS itoIIS osal - Phase 2 & 3 Erigiii r--ieer-iii ire g Elevator-, Additior-i to Ernersori Sbreet Par -king Deck Page 8 ESTIMATED MAN I IOURS Over 5,000 O IRepeat Orear 1010 Parking 9 off Ice's Village of Mount Prospect Public Works Fe. cKin ical IISroposal - 13[iase 2 & 3 Engiii ineeriii ng III Addition to Emerson Street Parking Deck Page 9 APPENDIX - RESUMES OF KEY PERSONNEL IPROJEC I MANAGER J eff III lenriksen, IRA Mr. Henriksen is a Senior Project Manager, Vice President and Director in the firm's Education Chicago office. Representative projects include: University of Illinois Chicago, IL 0 Randolph & Wabash Parking Garage Elevator Addition - Chicago, IL B.A. Arch itectu re/1988 0 Enterprise Center Parking Garage Elevator Addition - St. Louis, MO 0 Mount Prospect Village Hall Parking Ramp., Mount Prospect.. IL Active Registrations 0 Malcolm X College Parking Facility, Chicago, IL Illinois 0 Fenwilck High School Garage, Oak Park, IL National Council of 0 Buckingham Place Parking Structure., DesPlailnes., IL Architectural Registration 0 M2 on Nell Street/Hill Street Parking Facility, Urbana, IL Boards (NCARB) 0 Vail Avenue Parking Garage Renovation & Expansion, Arlington Heights.. IL 0 Advocate Lutheran Garage, DesPlaines, IL PROJECT ASSIGNMENT 0 Zurich NA Parking Structure, Schaumburg., IL Project Manager 0 Springfield Clinic Foundation North Parking Structure, Springfield, IL 0 RR Donnelley Employee Parking Structure, Warrenville, IL 0 Memorial Medical Center Physicians Parking Deck, Springfield, IL 0 Truman College Parking Facility, Chicago.. IL 0 University of Illinois Urbana -Champaign,, Lot F-29 Fire Substation, Champaign, IL • Rush -Copley Medical Center Employee Parking Garage Horizontal Expansion,, Aurora IL • Hill Farms State Garage, Madison,. Wl • Scioto Peninsula Garage, Columbus, OH • Echo Park Parking Structure,, San Antonio, TX • University of Notre Dame PS,. Notre Dame, IN • University of Wisconsin HCA Parking Structure, Madison, Wl • Hyatt Eastwood Parking Structure, East Lansing, Ml • XNA Regional Airport Parking Garage, Bentonville Arkansas • Cleveland Clinic Podiatry Garage, Cleveland, OH • University Hospitals Lot 59 Replacement PS, Cleveland, OH • Goodyear Tech Center Parking Structure,, Akron., OH • Bridgestone Tech Center Parking Structure, Akron, OH • Summa Healthcare Parking Facility, Akron,, OH • South Campus Gateway Parking Structure, Columbus, OH • Scottsdale Crossing Building E Parking Deck and Retail Facility., Scottsdale, AZ • Oakwood Hospital North Addition Parking Garage,. Dearborn, Ml Village of Mount Prospect Public Works Fe. cKin ical IISroposal - Rhase 2 & 3 Erigiii r-ieeriii ng III evator Addition to Ernerson Street Parking Deck Page 1 0 Total Years 36 Years with DESMAN 36 Education University Illinois B.A.1 ArchitecturalDesign rdegree) Minor History r Architecture Active Alabama Louisiana rizonaarY Ian Arkansas Missouri CaliforniaNevada Colorado North Carolina Florida i Georgia Pennsylvania Hawaii South Carolina Illinois ss Indiana as Iowa Utah NCARB (National cil of Architectural Registration Boards) Certified Parks art Advisor (Green ar i Certification) A f �� I atons Art Institute of Chicago I Cleveland Restoration Society National r i Association Parking Consultants Council PIROJECT ASSIGNMENT Principal -in -Charge Parlkhrig Design Specialist budget and schedule control. ® Rebora understands the importance of the implementatin of project requirements and will ensure that the necessary manpower is available for the efficient, cost effective and successful completion of the ® He will also review all draft and final drawings and documents before they are delivered r review and milestone 51111,1111111 =11-1111111", 111,11111 !91 1 • Goodyear Tech Center Parking Structure, Akron, OH • Bridgestone Tech Center Parking , Akron, OH • Scioto Peninsula Garage, Columbus, OH • South Campus Gateway Parking r, Columbus, OH • University Hospital i Visitor Parking Structure, Cleveland, OH Village of Mount Prospect Public Works Fe.chtiical IProposal - P[iase 2 & 3 Engirir-ieeriingIII a to r Addition to Emerson Street Parking De k P APPENDIX - RESUMES OF KEY PERSONNEL Total Years of Experience 17 Years with DESMAN 10 Education University of Illinois Chicago Masters of Architecture Architecture is University Bachelor of Arts Philosophical Studies PROJEc r ASSIGNMEN I Piroject Architect PROJECT ARCI I ITECT III )eniniisc Williams ® Williams has been involved in architectural design, coordination, contract documentatI on and construction for over 17 years. His responsibilities have included analysis of client's needs, exploration of schematic alternatives, field surveys, and supervision of working drawing production, specification writing and construction administration, project close-out, coordination of work by outside consultants including civil engineering, architectural design, interior design, structural analysis, mechanical, plumbing, electrical and landscaping design. He has extensive experience in the use of the AutoCAD & Revit systems to automate drawing production and project delivery. Dennis has over 11 years' experience with DESMAN on parking structures and will play an integral role in the development of the design, drawings and documents for the project as well as coordination between the team members. Some of Mr. Williams' recent experience includes: * Memorial Medical Center Physilclans Parking Deck, Springfield, IL * The New Malcolm X College Parking Garage., Chicago,, IL • Fenwilck High School Garage, Oak Park, IL • Rush -Copley Medical Center Employee Parking Garage Horizontal Expansion, Aurora IL • Advocate Health Care Support Center Parking Deck Expansion, Oak Brook, IL * Zur*1ch North American Garages, Schaumburg.. IL * 800 North Garages, Skokie., IL • XNA Regional Airport Parking Garage, Bentonville Arkansas • 3rd Ave Garage., Pittsburgh Parking Authority,, Pittsburgh, PA • XNA Airport Garages, Benton, AIR • University of Pittsburgh CIC Garage, Pittsburgh, PA • University of Pittsburgh Recrecation Center, Pittsburgh, PA 0 VA Erie Garages, Erie, PA Village of 1\4ount Piirospect Public Works Fe. chtiical IIIAroposal - P[iase 2 & 3 Engiii ir-ieeriii ing III evator Addition to Ernerson Street Parking Deck Page 112, APPENDIX - RESUMES OF KEY PERSONNEL LEAD STRUCTURAL ENGINEER D. Yu it Sweti in, S E� 11�3 E Village of Mount Prospect Public Works Fe. cKin ical IISroposal - I' III 2 & 3 Engiii ineeriii iing III evator Addition to Emerson Street Parking Deck Page 113 Since 1977, Mr. Swetin's experience in the structural design field has included major lr�rdesign and project management responsibilities. He has almost 40 years of experi ence and is one of the most respected structural engineers in the parking industry OF PF", and a constant leader. His vast knowledge and experience in parking structures will be a great asset to the project's success and for the structures long term durability. Z The following are some of the ts that Mr. Swetin has been involved in. projec Total Years of Experience e University of Chicago 61st & Drexel — Parkilng Garage and Medical Office 41 Building, Chicago, IL * Super K -Mart Plaza Parking Area Retrofilt, Vernon Hills, IL Years with DESMAN e Allstate Insurance Co., Corporation Headquarters, Northbrook, IL 23 e Barrington Lilbrary,, Barrington,, IL Education e Pansophilc Systems Corporate Headquarters., Lisle,, IL Dnipropetrovsk National * University of lililinols — Lot F-29 parking Structure and Fire Sub-staflon, University of Railroad Champaign, IL Transport - Dnipropetrovsk, * Cilty of Dubuque 10th & Central — Parking Facililty and Filre Staflon, Ukraine (former USSR) Dubuque., IA M.S. Civil Engineering (U.S. Equivalent) e St. Mary"s of Vernon Church Rectory Addlt*lon,, Vernon Hills., IL Illinois Institute of Technol- * Parkvilew Plaza,, 9 -Story Office Building wilth 3 -Level Underground Parkiing ogy —Chicago, IL Garage, Oakbrook Terrace, IL M.S. Civil Engineering — * Moody Bilble Institute Parkilng Garage (5 llevells),, Chicago,, IL Major - Structures e Lighthouse for The Blilnd Addition,, Chicago., IL e Veterans Hospital — Garage, Cleveland, OH Active Registrations Pennsylvania PE — 084909 e University Hospitals — Patient Parking Garage, Cleveland, OH Ohio PE — E-61471 Hill Farms State Garage, Madison, WI Illinois 9 Columbus City Hall Garage, Columbus, OH SE — 081-004S19 * Cleveland Clinic E. 105th Garage., Cleveland, OH PE — 062-044745 Hyatt Legacy Garage, Cleveland, OH Arizona PE - 46433 * Goodale Street Garage, Columbus, OH Louisiana PE - 35823 Missouri PE — EN -028171 9 University Hospitals Case Center — Patient/Visitor Parking Garage and Florida PE - 74833 Connector Bridge, Cleveland, OH Iowa PE - 13774 * Case Western Reserve University, University Hospitals — Main Garage, Michigan PE — 6201045793 Cleveland, OH Utah PSE — 6737483-2202 e Meridia Hillcrest Hospital — Garage, Cleveland, OH MetroHealth —Valentine Parking Facility, Cleveland, OH Affiliations 9 Cleveland Clinic 89th Street — Employee Garage and Service Center, American Concrete Institute (ACI) Cleveland, OH * Scioto Peninsula Underground Garage,, Columbus., OH American Institute of Steel * Ohio State University — Lane Avenue Garage, Columbus, OH Construction (AISC) 9 Nationwide Insurance — Employee Garage, Columbus, OH PROJECT ASSIGNMENT * AEP Parking Structure, Columbus, OH Lead Structural Engineer * Arena Grand — Parking Structure, Columbus, OH e BWC — Parking Structure, Columbus, OH Village of Mount Prospect Public Works Fe. cKin ical IISroposal - I' III 2 & 3 Engiii ineeriii iing III evator Addition to Emerson Street Parking Deck Page 113 APPENDIX - RESUMES OF KEY PERSONNEL JASON ALLEN P.E., LEED AP Mechanical Engineer Education Bachelor of Science, Architectural Engineering Milwaukee School of Engineering Licenses & Certifications Registered Professional Engineer: Arizona, California, Delaware, Iowa, Michigan, Missouri, New York, Pennsylvania, South Dakota, Tennessee, Utah, Virginia, Wisconsin LEED° (Leadership in Energy & Environmental Design) Accredited Professional by U.S. Green Building Council NCEES Record Engineering energy. focused. Henneman1) Jason Allen, P1 Jason has 20 years of professional experience as a mechanical engineer. A Senior Vice President of Henneman Engineering, he is Director of the Milwaukee Office. Jason has provided engineering services related to healthcare, higher education, and governmental facilities. He specializes in the design of HVAC systems. Fenwick High School, Parking Garage, Oak Park, Illinois Camp Douglas, Battery Charging Stations, Camp Douglas, Wisconsin Aspirus Wausau Hospital, Wausau, Wisconsin • Multiple AHU Evaluations & Improvements • Ambulance Garage Expansion • Emergency Generator Replacement • IT Closet Infrastructure Upgrade • Short Order Cook Line and Hood Study Milwaukee County Parks, Milwaukee, Wisconsin • Calvin Moody Park New Community Building & Park Renovation • Johnson's Park Pathway Lighting Renovation Milwaukee Mitchell International Airport, Milwaukee, Wisconsin • Data Center Upgrade • MKE Regional Business Park Electrical Infrastructure Upgrade State of Wisconsin, FC Heavy Unit Storage Building, Wisconsin Dells, Wisconsin Waukesha County Technical College, Pewaukee, Wisconsin • Multiple AHU Replacements • CDL Track and Storage Sheds Remodel • Culinary Renovation Phase 3, Building A • Cooling Tower Replacement • Diesel Technician Lab Renovation, Building G • Fabrication Lab, Building I • Gas Piping to Laser Cut Machine, Building H • HUB & SGA — Kitchen Renovation, Building C • Laser Cutting Machine Gas Piping, Building H • New Sprinkler System, Building L • North Parking Lot Lighting & Security • Power and Data to Exterior Signage • Supplemental Chiller, Building D Wisconsin Department of Military Affairs, AASF 1 Hanger Addition, West Bend, Wisconsin University of Wisconsin -Whitewater, Drumlin Hall Loading Dock Renovation, Whitewater, Wisconsin Dane County, 911 Center Renovation, Madison, Wisconsin Career History Osceola Discovery Center, Village Hall & Library, Osceola, Wisconsin 2005 -Present Henneman Illinois Beach State Park, Concession Replacement, Zion, Illinois 1999-2005 Other Firms Harold Washington Social Security Center, Revolving Door Alterations, Chicago, Illinois Winnebago County, Administration Building Remodel, Rockford, Illinois Stephenson Public Library, Addition and Renovation, Marinette, Wisconsin UW Health Research Park Clinic, Madison, Wisconsin • Cooling Tower & Chiller Replacement • Cooling Tower Replacement Construction Administration and Commissioning Village f Mount Prospect Public rII Fe. c h iin i c l IProposal - P[iase 2 & 3 Engirineerhng Uevator Addition to Emerson Street Parking Dec Page 14 .......... � i ............. CAGE ............ C 11 1111 Matthew Schumacher, P.E. -Director of Operations ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Mr. Schumacher has over 13 years of experience in the land development industry servicing clients in the residential, commercial, industrial and institutional markets. His design responsibilities include site layout and design, utility design, site grading, soil erosion and sedimentation control planning, detention basin sizing, storm water management design and modeling, roadway design, parking lot design, permit coordination, and general consultant management and coordination during the conceptual, preliminary, and final design phases. Educational / Athletic Complex / Institutional Holmes Elementary School Addition Maercker School District 60, Westmont, Illinois Westview Hills Middle School Addition Maercker School District 60, Westmont, Illinois Jefferson Early Childhood Center Wheaton Warrenville C.U.S.D 200, Wheaton, Illinois Science and Health Careers Center Oakton Community College, Des Plaines, Illinois Commercial / Office / Industrial Nicholas & Associates Office Expansion Nicholas & Associates, Mount Prospect, Illinois 431 Lakeview Court Dock Additions Nicholas & Associates, Mount Prospect, Illinois Speculative Warehouse (252,000 SF) Crow Holdings Industrial, Channahon, Illinois Speculative Warehouse (116,000 SF) Dayton Street Partners, Bensenville, Illinois Residential / Senior Livinq / Hotel Sixteen30 Luxury Apartments Wingspan Development Group, LLC., Plainfield, Illinois Maple Street Lofts - Mixed Use Development Wingspan Development Group, LLC, Mt. Prospect, Illinois Twenty West Mixed Use Development Wingspan Development, Mount Prospect, Illinois 2845 W. Belden Avenue Apartments Inland Development Corporation, Chicago, Illinois Illinois PE # 062-062674 YEARS OF EXPERIENCE 13 years EDUCATION BS -Civil Engineering University of Illinois Urbana -Champaign Graduated with Honors Preliminary Site Design Final Site Design Project Management Site Grading and Earthwork Analysis Potable Water System Design Stormwater Collection Design Sanitary Sewer and Lift Station Design Stormwater Management Design Permit Coordination with Local and State Agencies SOFTWARE PROFICIENCIES AutoCAD Civil 3D AutoTURN AGTEK Hydraflow Hydrographs Village of Mount Prospect Public Works ec v iin I c IP it - P . P ri ri e e r ee r Addition Emerson Street Parking rec P a gM ryA%J 01 AM 0 X U: 9Z mAN UO VILLAGE OFMOUNTPROSPECT JANUARY 21 2016 ,ATT,AC • Village Board Meeting -April 5, 2016 Page 66 of 67 REQUEST FOR PROPOSALS Phase 2 and Phase 3 Engineering for Passenger Elevator Addition to the Emerson Street Parking Deck VILLAGE OF MOUNT PROSPECT PUBLIC WORKS Proposals due April 8, 2019 Motit-lt Prostlect REQUEST FOR PROPOSALS Phase 2 and Phase 3 Engineering for Passenger Elevator Addition to the Emerson Street Parking Deck SummariJxLI] The Village of Mount Prospect (Village) is seeking proposals from qualified parking system consultants to perform specified phase 2 engineering design services and phase 3 construction inspection services as necessary to add a new passenger elevator to the existing municipally -owned Emerson Street Parking Deck. The purpose of this proposed project is to improve access to parking for the Downtown Mount Prospect Business District in general, and for a proposed 30,000 square -foot restaurant and entertainment district bounded by Northwest Highway, Busse Avenue, and Route 83 in particular. The existing parking facility is located at 30 South Emerson Street, Mount Prospect, Illinois. The facility is immediately adjacent to the Mount Prospect Village Hall and Mount Prospect Public Library buildings. The map in Attachment A denotes this location. The scope of work includes, but is not limited to, the following tasks related to assessing the feasibility of adding a passenger elevator, and all necessary appurtenances, to the southwest corner of the existing parking facility: Design/Bidding Phase 1. Collect necessary topography and necessary field data. 2. Prepare detailed plans and specifications suitable for bidding. Plans and specifications shall conform to current Village of Mount Prospect and all other applicable codes, regulations, and standards. 3. Consultant shall assist in securing necessary permissions, easements, and/or rights to construct proposed improvements on property not under the direct control of the Village. Assistance will, at a minimum, include written and verbal communication, preparation of conceptual presentations, and participation in at least two (2) staff level meetings, one (1) meeting with the Illinois Department of Transportation. 4. Consultant will make application for and obtain all necessary permits, easements, and/or permissions necessary to construct the proposed improvements. 5. Consultant shall make recommendations to design, schedule, and/or construct the proposed improvements in a manner that improves the project's eligibility for third -party financial aid including grants and low- interest loans. If recommendations are pursued, Consultant shall assist the Village in making necessary applications for aid. 6. Consultant shall supply a detailed engineer's estimate of costs for construction of the project. 7. Consultant shall submit all bid documents to the Village for review and approval prior to distribution. 8. In addition to the necessary meetings and communication with Village staff necessary to produce the final plans and specifications, the consultant shall prepare presentations and participate in at least one (1) neighborhood meeting and one (1) Mount Prospect Village Board meeting. Deliverables will include a pre -final plans, final plans, and bid specifications necessary to publicly bid the project in a manner consistent with the Village of Mount Prospect Purchasing Policy. Technical Proposal The Consultant's technical proposal shall be organized so that the outline generally follows the format of this request for proposals. The proposal shall cover the approach and the methodology the Consultant intends to use in carrying out the project. The technical proposal shall be less than ten (10) pages in length (does not include any appendices or literature that may be attached to the proposal). The technical proposal should also include statements setting forth the Consultant's line of business, organizational structure, summary of past experience, and specific descriptions of at least three (3) projects completed in the Chicago metropolitan area that are similar in subject, size, and complexity to the scope of services specified herein. These descriptions must include contact information for reputable references that can attest the Consultant's representations. This requirement for organizational structure and project references shall not apply if the Consultant has performed similar work for the Village within the last five three (3) years. In addition, the proposal shall indicate the principal in charge, project manager, and other staff who will be committed to the project along with their resumes. This request for proposals describes an intended design -bid procurement scheme. The Village of Mount Prospect will entertain alternative procurement methods. However, alternatives must be submitted in addition to the requested design -bid scheme. The consultant shall also submit a man-hour estimate, by labor category, for all phases of the work. A total man-hour estimate should also be supplied. NOTE: The total number of ON-SITE man-hours must be clearly identified. RFP for Phase 2 and Phase 3 Engineering / Elevator Addition to Parking Garage Page 3 of 7 Cost Proposal In a separate, sealed envelope, marked "Cost Proposal for Phase 2 and Phase 3 Engineering Services for Elevator Addition to the Emerson Street Parking Deck" [JHL2] identify a maximum, not -to -exceed fee. An hourly fee schedule by personnel category, including direct and indirect personnel costs and profit to be used for invoicing, shall also be included. Proposal Submittals Proposals should be submitted as a distinct document in a separate sealed envelope marked: Proposal for Phase 2 and Phase 3 Engineering for Passenger Elevator Addition to the Emerson Street Parking Deck Present Work Load A tabulation of the Consultant's current project workload is to be included for each of individual assigned to this project. Each project shall be identified by name, type, size, duration, and personnel assigned. In lieu of this tabulation, the Consultant may include a statement in their proposal, that if awarded this project, that the Consultant has sufficient time and personnel available to perform all of the tasks and/or work contemplated in this request within the time period outlined. Personnel Professional resumes, including education, work experience, professional credentials, and employment status (e.g. full-time, part-time, years with the firm, job description) for each individual to be assigned to the project described herein should be provided. Disqualification of Proposals More than one proposal for the same work described herein from an individual, firm or partnership, a corporation or an association under the same or different names, will not be considered. Reasonable grounds for believing that any party is interested in more than one proposal for the work contemplated will cause the rejection of all proposals in which said party is interested. If there are reasonable grounds for believing that collusion exists among the parties submitting proposals, the proposals of the participants in such collusion will not be considered. Indemnification The Consultant shall indemnify and save harmless the Village, its officers and employees from any and all liability, losses or damages, including attorney's fees and costs of defense, the Village may suffer as a result of claims, demands, suits, actions or proceedings of any kind or nature, including workers' RFP for Phase 2 and Phase 3 Engineering / Elevator Addition to Parking Garage Page 4 of 7 compensation claims, in any way resulting from or arising out of the operations of the Consultant under the Contract, including operations of subcontractors; and the Consultant shall, at his own expense, appear, defend, and pay all fees of attorneys and all costs and other expenses arising therefrom or incurred in connection therewith; and, if any judgments shall be rendered against the Village in any such action, the Consultant shall, at his own expense, satisfy and discharge same. The Consultant expressly understands and agrees that any bonds, letters of credit or insurance protection required by the Contract, or otherwise provided by the Consultant, shall in no way limit the responsibility to indemnify, keep and save harmless and defend the Village as herein provided. Consultant agrees to defend and hold harmless the Village from and against all demands, claims, suits, costs, expenses, damages and adjustments based upon any infringement of any patent relating to goods specified in the contract, and on account of the Village's use of any copyrighted or uncopyrighted, composition, trade secrets, secret process, proprietary rights, patented of unpatented invention, article or appliance furnished or used under the bid Specifications. Licenses Each party submitting a proposal shall possess all necessary federal, state, and local licenses as are required by law, and shall furnish satisfactory proof to the Village upon request that the licenses are in effect during the entire period of the Contract. Proposed Project Schedule,[JHU] The Consultant shall adhere to the anticipated dates as set forth in the project schedule for both projects below: Proposals Due Village Board Award Construction Bid Letting Village Board Construction Award Substantial Completion Final Completion April 8, 2019 April 16, 2019 June 10, 2019 July 16, 2019 October 18, 2019 November 15, 2019 Award of Contract The award of any Contract may be made to the Consultant who submits the proposal which is in the best interest of the Village as evaluated by Village staff. Such evaluations will include the experience of the Consultant, capability of the Consultant, and other factors deemed by Village staff to be in the best interest of the Village. In addition, the Village reserves the rights to accept or reject any and all proposals, to waive any informality in any proposals, and to accept any proposals considered advantageous to the Village. RFP for Phase 2 and Phase 3 Engineering / Elevator Addition to Parking Garage Page 5 of 7 All parts, supplies, materials, services, and data will be provided within the timelines and costs stipulated within the proposal and this agreement, unless modified in writing between the Village of Mount Prospect and the Consultant. The Consultant should identify all other items for which they will be seeking additional reimbursement; i.e. tolls or other out-of-pocket expenses. Compliance with Freedom of Information Act Request Section 7 of the Illinois Freedom of Information Act (FOIA), 5 ILCS 140/7, applies to public records in the possession of a party with whom the Village of Mount Prospect has contracted. The Village of Mount Prospect will have only a very short period of time from receipt of a FOIA request to comply with the request and there is a significant amount of work required to process a request including collating and reviewing the information. The Consultant acknowledges the requirements of FOIA and agrees to comply with all requests made by the Village of Mount Prospect for public records (as that term is defined by Section 2(c) of FOIA) in the undersigned's possession and to provide the requested public records to the Village Mount Prospect within two (2) business days of the request being made by the Village of Mount Prospect. The bidder/contractor agrees to indemnify and hold harmless the Village of Mount Prospect from all claims, costs, penalties, losses and injuries (including but not limited to, attorney's fees, other professional fees, court costs and/or arbitration or other dispute resolution costs) arising out of or relating to its failure to provide public records to the Village of Mount Prospect under the contract. Ownership of Documents and Intellectual Property Except as otherwise provided in the Agreement, software, documents and reports prepared by the Consultant, as part of the Services performed, shall become the sole and exclusive property of the Village of Mount Prospect upon payment. However, the Consultant shall have unrestricted use of the information and or reports for their internal use but not for any other purpose without the written consent of the Village of Mount Prospect. Independent Contractor By accepting this agreement and providing services herein, the Consultant acknowledges and agrees that it will be providing services to the Village of Mount Prospect as an "independent contractor". RFP for Phase 2 and Phase 3 Engineering / Elevator Addition to Parking Garage Page 6 of 7 Proposals Proposals should be addressed to: Sean P. Dorsey Director of Public Works Mount Prospect Public Works Department 1700 W. Central Rd., Mount Prospect, IL 60056 Ph: 847-870-5640 or e-mail: sdorsey@mountprospect.org Proposals will be accepted via e-mail (sdorsey@mountprospect.org). Questions and Clarifications Questions and/or clarifications regarding this request for proposals should be directed to: Sean P. Dorsey Director of Public Works Mount Prospect Public Works Department 1700 W. Central Rd., Mount Prospect, IL 60056 Ph: 847-870-5640 or e-mail: sdorsey@mountprospect.org Proposals Due All proposals must be received at the Mount Prospect Public Works facility no later than 3:00 PM local time on April 8, 2019. RFP for Phase 2 and Phase 3 Engineering / Elevator Addition to Parking Garage Page 7 of 7 �������� 0 h a Is e E in g ii n e e i�l 1111 M a *1 iri ISmigµnm ir'- e e t e d e Is It irw *1 a n B iplow `1 d g e gl�llY��1�//i/AllIll11111111j1�Ijjjjjjjjjjj P R 0 IS P �i IIIVIII/vr' ����': ���»»»»»»», �L // w, G �\ 0 N 11 P B III ��� C W 0 R �K IS Attn: Sean Dorsey Director of Public koll Mow��1111t Pros Wo��d�,,olllll::s 1700 W. Central Road Mount Prospect, IL 60056 Ph. 847.870.5640 1 sdorsey@mountprospect.org Submitted April 15, 2019 by Design Mailr-"ijagement 20 N. Clark Street, 4th Floor Chicago, IL 60602 Point of Contact - Stephen J. Rebora Email - srebora@desman.com R 312.263.8400 www.DESMAN.caiii Firo// 0 in collaboration with. - In %% C Heinnemian Engineering In AGE energy. focused.' WII,,,ime OHIO J J ii f,l ll Iiii ii hiiiiiiiij Il �� � (01 Il ifii 1 1), 111j)jjjj I I I I I 1/00) ji 1 1111, rfffffv �������� 0 h a Is e E in g ii n e e i�l 1111 M a *1 iri ISmigµnm ir'- e e t e d e Is It irw *1 a n B iplow `1 d g e gl�llY��1�//i/AllIll11111111j1�Ijjjjjjjjjjj P R 0 IS P �i IIIVIII/vr' ����': ���»»»»»»», �L // w, G �\ 0 N 11 P B III ��� C W 0 R �K IS Attn: Sean Dorsey Director of Public koll Mow��1111t Pros Wo��d�,,olllll::s 1700 W. Central Road Mount Prospect, IL 60056 Ph. 847.870.5640 1 sdorsey@mountprospect.org Submitted April 15, 2019 by Design Mailr-"ijagement 20 N. Clark Street, 4th Floor Chicago, IL 60602 Point of Contact - Stephen J. Rebora Email - srebora@desman.com R 312.263.8400 www.DESMAN.caiii Firo// 0 in collaboration with. - In %% C Heinnemian Engineering In AGE energy. focused.' IFEE St J IVI IVI )"Ikl II Y DESMAN proposes a fee of $31,625 broken down into the amounts listed in the table for the preliminary design of a pedestrian bridge spanning Main Street. Service include Architectural, Structural Engineering, Civil Engineering, and MEP/FP Engineering services as described in the RFP and herein. Exclusions to the Fee Observation, assessment, reporting and any responsibility regarding the discovery, presence, handling, removal and disposal of, or exposure of persons to, hazardous materials in any form at the project site, including but not limited to, asbestos, asbestos products, lead, polychlorinated biphenyl (PCB) or other toxic substances, Reimbursable expenses for travel, if required forthe project other than local travel, printingand reproduction of project documents for internal and external review, permitHng and bidding purposes, messenger/ overnight mail delivery charges or any other out of pocket reimbursable expenses deemed necessary such as mileage, parking etc., in connection with performance of the Scope of Services with your approval. Expense invoices will be issued separately from professional service invoices with original receipts attached. Expenses will be billed by DESMAN at direct cost without any additional mark-up for administration and handling. Phase I or 11 Environmental testing services or reports; � , o'.), a s a Village of Mount Prospect Public Works Cos l� .... .. ....II Fe. cKin ical IISroposal - P[iase 1 Engiii rieer-iii ng / Main r II .striari Bridge P a g e --Fa 4 0N 0 Ln 00 1q:T rr� 0 Ln 1111, T-4 0 N r-zl Vl- 0 en Ln Vl- ss 4) LA V) CU u V) w o 0 0 0 0 0 m c E .@ X cc ui _© C 0CL Ln r4 Ln Ln f 1 0 CJ M 00 4A ^ 1^L 0 Vl- 4A O p 0 Vl- 0 4A CL U. CL LLJ z ELn < to Ln N c) U') 00 rn IN C.) r4 (z) CN (Z C) 00 00 ui M UI.) r4 L4 N a� r,� t4 Vl- V-1 Ln r -4M CM Ln 00 4m t.0 r4 d 00 00 N N 11 ............................... 0 O 0 Q0 0 LO) o (V v u 0 C) 9.0 tZ C) 0 c) O c) c Ln LLJ LIMQ) 'i 00 qt N C-4 (z) txo Ln ME rr, 1 N 00 00 R* N r,4 CL M u Ln 'o u (z) T-4 r-1 (z) c) c) UJ bD 0 r Z D Ln O L.L 0 UJ CIA 06 a m kn okn r- a, CL cr% 'Ei 4- r- M w cc -73 .2 -a L- 1p E .2 z 41 cm Z3 t n, 4-J > r 4- o Qj 4- " CL v a j rL Ln cd D Q C6 Lu Q cd r................ ............ . .11 011 I c 11,.n,..1ca I ol 1111D s r.. I 0 h a s e 1 E in g ii n e e it i�ing Main Smigµnmr eet 13edestrian Bridge V Immm. L AG OWN1111 F MOt.)INT PROSPE�.Illllllll,�llllllllllu PUBI Illllllu ............... �,m WORKS •® Sean Dorsey Mawn"It War1<c/////,,,s ��ft 1700 W. Central Road Mount Prospect, IL 60056 Ph. 847.870.5640 1 sdorsey@mountprospect.org Submitted April 15, 2019 by Design M a lr-"ij a g e m e n t 20 N. Clark Street, 4th Floor Chicago, IL 60602 Point of Contact - Stephen J. Rebora Email - srebora@desman.com P. 312.263.8400 wwwJDESMAN.,,com 0 in collaboration with. - In Heinnemian Engineering In CAGE energy. focused.' Sean Dorsey Director of Public Works Mount Prospect Public Works Department 1700 W. Central Road Mt. Prospect, IL 60056 Re.- Technifcal Proposal Phase 1 Engineering / Main Street Pedestrian Bridge Mount Prospect, IL DESMAN is pleased to submit our proposal to the Village for preliminary design services for a pedestrian bridge spanning main Street. DESMAN very familiar with the Village's desire through past site visits and our original involvement with the Emerson Street Garage. Parking garages are primarily an accessory use to some other destination. As such DESMAN has been involved with the design of hundreds of pedestrian bridges and connectors. Through our past efforts., our team is ready to share our knowledge and get this project pointed in the right direction during this Phase 1 assignment. We believe that our past work makes DESMAN uniquely quaed for this assignment. DESMAN will act as the prime consultant for this assignment having acted under this capacity for numerous other lar assignments for Mt. Prospect and municipalities throughout the country. Our team will be led by Jeff Henriksen R.A. Jeff will be our Project Manager assisted by Dennis Williams, Project Architect and Manpower Coordinator. Joining our team for MEPFP is Henneman Engineering along with Cage for Civil/Landscape. We are very pleased to have them on our team given our successful working relationship with Henneman and Cage as well as their local knowledge and successful previous work in town. A complete team organizational chart, qualifications and area of expertise that each firm brings to the table has been included in our proposal. On behalf of DESMAN's staff of professionals, we thank you for this opportunity to submit our proposal and believe that the enclosed submission is complete, in compliance with the RFP requirements and worthy of your review and further consideration. Please do not hesitate to contact us should you have any questions or require any additional information. Your consideration is most sincerely appreciated, and we look forward to the opportunity of putting our staff at your disposal in the successful and expeditious completion of this assignment for the Village. Sincerely, DESMAN, Inc. Stephen J. Rebora, R.A. President Village of Mount Rrospect Public Works TeIIS r-flcal IISroposal - Phase 1 Engiii rieer-iii ng / Main Street Pedestrian Bridge LINE OF BUSINESS AND ORGANIZATIONAL STRUCTURE `® DESMAN, we love at we do. It's not work; it's fulfilling our passion to collaborate on great projects that make a difference in the communities in which we live and work." - Steve Rebora, President DIl' SMNINJ 0I UICAG O UI' HICE 20 N. Clark Street, 4th Floor Chicago, IL 60602 p. 312.263.8400 1312.263.8406 www.DESMAN.com jhenriksen@desman.com AFII IIHI Il, 1141% 1`10NS Institute of Certified Planners (AICP) Institute of Transportation Engineers National Parking Association United States Green Building Council (USGBC) LEED AP BD+C USGBC's Parksmart Over 5,000 9s% Repeat Over 1010 Parking 9 off Ice's o P&i,,'1,,,:/J1ng r0ated se�i,'Vlces oftir/'ed �by 'M6�ude:,, • Pedestrian Bridges • Architecture • Structural Engineering • Functional Design • Site Evaluation • Adaptive Reuse • Elevator Additions • Restoration Engineering • Parking Studies and Operatioi • Parking Access and Revenue ( • Site Observation and Constru rnncz"Iti a I n I % -P I I I Parking Consultants Council of National Parking Association As designers we focus on solutions to deliver a positive user experience from both (N PA) infrastructure and aesthetic perspectives. We know good design does not matter if International Parking & Mobility quality is not followed through in all phases of design, from conceptual design to Institute (IPMI) construction administration. The DESMAN team plans to bring our vast expertise in the www", III ES M A N,,, co tni design of pedestrian bridges to this assignment. Village of Mount Prospect Public Works Fe. cKinical Proposal - P[iase 1 Engit-i c. - iii iiia g / Main Street Pedestrian Bridge Page 2, SIMILAR PROJECT'S WITS I REFERENCES 0 Over 5,000 ' 5'O IRepeat Orear 1010 Parking 9 off Ice's The project is a 790,000 sf, mixed use parking facility serving employees, patients and visitors to the new Center for Care and Discovery located at the core of the University of Chicago Medical Center campus at 57th & Cottage Grove. The eight level facility has 1,824 parking spaces and incorporates 63,000 sf of UCMC shell space at ground level. An enclosed pedestrian bridge spanning over 57th street allows patients to "travel safely from the second level pick-up/ drop off area directly *Into the CCD. The lower level includes a nine berth truck dock/service area, and a service tunnel connecting to the CCD under 57th street. Above the truck dock, DESMAN also designed two 110' long transfer girders to eliminate garage columns at dock level and provide clear maneuvering room for 73' long semi -tractor trailers. An eight story tall medical gas tank area is integrated into the structure and architecturally concealed by a kinetic art wall. The overall facade consists of a partially open/glazed aluminum curtainwall system, metal panels and precast concrete. The building foundations and columns are designed for the future addition of a green roof and eight story, 208,000 sf medi- cal office building to be built on top of the parking facility. Structural knock -out slabs are included at each level to allow the addition of elevators at the time of future office construction. DESMAN Key Personnel: Mr. James Hietbrink Director, Planning, Design Ramp- Construction Steve Rebora .1 Jeff Henriksen University of Chicago Hospital 5841 South Maryland Avenue, Room L-01 Chicago, IL 60637 Ph. No. 773.702.3975 Email: james.hietbrink@uchospitals.edu Village of Mount Prospect Public Works Fe. chriical IISroposal - 13[iase 1 Engiii firm eer-iii rlg / Main r II .striari Bridge Page 3 SIMILAR PROJECT'S WITS I REFERENCES Over 5,000 9SOA Repeat Orear 1010 Parking 9 off Ice's Kathleen Gargano Village Manager Village of Hinsdale 19 E. Chicago Ave Hinsdale, IL 60521 E. kgargano@villageofhinsdale.org P. 630-789-7013 The Village of Hinsdale hired the Design Build team of Wight/DESMAN to design and construct a 300 car parking ® This parking structure is two levels high with a portion being subterranean. The upper level is dedicated to parking for faculty and guests of the middle school. Whilst the lower level will be used for infrastructure parking for the public and the downtown activities. Both levels will be used for event parking. The building materials have taken cues from the design of the new middle school building. This parking deck will be completed in September 2019 for $6,500,000. 4* Ms. Nancy Bufalino Fenwick High School 505 Washington Blvd Oak Park, IL 60302 E. nbufalino@fenwickfriars.com P. 708-386-0127 Fenwick High School has planned a series of architectural improvements as part of their Master Plan. This Master Plan includes a new 356 car parking structure, a new formal entry and a new outdoor quadrangle. DESMAN was retained as the Architect and Engineer of Record for the design of the new parking structure, which is Phase I of Fenwick"s overall Master Plan. The structure was designed to be 6 levels, 5 structured, and built on land fronting Scoville Avenue immedi- ately south of the ® The garage serves students, faculty and guests during school and after school events. The ing of the garage enables bus parking adjacent to the structure. The Cast -in-place PT structure is clad with an elaborately designed skin of random ashlar granite and cast stonework to produce a fagade to compliment the design of the historic high school facility built in the early 1900's. DESMAN is working with Henneman on this assignment as they are providing MEP/FP services. Village of Mount Prospect Public Works Fe. chriical IISroposal - P[iase 1 Engiii rieer-iii ng / Main r II triar-i Bridge Page 4 ORGANIZATIONAL C! IART OR PROJECT TEAM Over 5,000 9SIA Repeat Orear 1010 Parking 9 off Ice's Village of Mount Prospect Public Works Fe. cKin ical IISroposal - Rhase 1 Engiii rieer-iii ng / Main r II triar-i Bridge Page 6 0 E S Atfiz- A Design Mar Iag&I li `Ile I Pi t KEY PERSONNEL Over 5,000 I IRepeat Orear 1010 Parking 9 off Ice's vo f f Yury Swetm.. ®, S.E. will the y% STKUC111111��11111URAL for the pedestrian bridge. Yury has been with DESMAN for over 24 years and is one of the most respected and knowledgeable engineers int parking industry. His vast knowledge and experience in parking structures will be a great asset to the projects success and long term durability. A principal with our firm is assigned to every pursuit and their role is to make sure our team meets or exceeds the expectations of the client. For this undertaking, Stephen J. Rebora,, i IIG) Ft Ul C Ul Nil,,,, E. He will ensure that the necessary manpower is available for the efficient, cost effective and successful completion of the project. He will also review all draft and final drawings and documents before they are delivered for review and milestone deadlines to Mount Prospect. ME 'Ulm Matthew Schumacher, P.E. is a Director of Operations with Cage Civil Engineering and will serve as the LU Project Manager and main contact for the LAN DSCAI)Illi IIll portion of the project. Matt has over 13 years in the industry and has been the lead project manager on 4 projects in Mount V, Prospect. Cage is local to the area and is currently the Civil Engineer in charge of the adjacent Maple Street I A 17 1 1 be important to the success of the Main Street Pedestrian Bridge. Resumes of the key personnel above are included in the appendix at the end of this proposal. Village of Mourit Piir osIIS ect Public Works Fechriical IIS iirlloIIS osal - Rhase 1 Engiii firm eer-hrig / Main Street Ilsedest riar-i Bridge Page 7 RROJECT APPROACI I AND METI IODOLOGY Over 5,000 I iRepeat Orear 1010 Parking 9 off Ice's We have thoroughly reviewed the scope identified in the RFP and have refreshed our memory of our past conversations regarding a pedestrian bridge that would span Main Street. We have also recently visited the site. We believe we have a solid understanding of the project scope. Design Phase: DESMAN will create concept plans and proposed solutions for the bridge design. At this time, we will identify utility requirements,. assess structural engineering solutions and establish estimates of probably construction costs. Concepts will be evaluated to take into account the impact on existing operations, code analysis and the physical appearance of the proposed solutions. From this exercise, our final Deliverable will be a Phase 1 report outlining a realistic solution that can move into Phase 2 and 3 engineering and design assignments. 1111111 IgIIII 1111111, 11 lif"""aill 111:11111111 1 IIIIIIII'l 111 1113111111 IF 10 I I Village of Mount Prospect Public Works TE-adhr-flcal Proposal - Phase 1 Enghrieer-hng / Main Street Pedestrian Bridge Page 8 TEAM AVAILABILITY I InnnIOURS Over 5,000 9SOA Repeat Orear 1010 Parking 9 off Ice's TEAM AVAILABILITY As a matter of routine, DESMAN carefully chooses staff members for each prospective consulting engagement based on their collective set of skills, training, background and their availability for the assignment. The team members assigned to this project have ample capacity to commit to this project The following table is a listing of key individuals that we have assigned to the project along with their current work load, as requested. I Key Personnel Work Loa,d A-vaih-lbility MENIN'm Stephen Rehora Principal In Charge Hard Rock SC Garage Construction Does Less than 5% Excess of 60% Parking Design Specialist Hinsdale Middle School Garage Construction Docs Less than 5% Fenwick High School Garage Design Development Less than 10% Columbus Convension Ctr Garage Design Development Less than 5% General Administration On Going Less than 15% Jeff Henriksen Project Manager Hinsdale Middle School Garage Construction Does Less than 15% Excess of 60% Fenwick High School Garage Construction Does Less than 15% Echo Park Construction Adm Less Than 5% General Administration On Going Less than 5% Dennis Williams Project Architect Fenwick High School Garage Construction Does Less than 15% Excess of 65% Univ of Pitt Schematic Design Less than 5% Powdermill Apartments Construction Does Less Than 15% Es' nMATED MAN HOURS As a matter of routine, DESMAN carefully chooses staff members for each prospective consulting engagement based on their collective set of skills, training, background and their availability for the assignment. The team members assigned to this project have ample capacity to commit to this project The following table is a ® of key individuals that we have assigned to the project along with their current work load, as requested. Village of Ni4ount Prospect Public Works TE-aIII r-flcal IIS iiioIIS osal -Phase 1 EngiirM-ieer-hng / Main Street II stilan Br,iidge PagE� 9 APPENDIX, �RESUMES OF KEY PERSONNEL IPROJEC I MANAGER J eff III lenriksen, IRA Mr. Henriksen is a Senior Project Manager, Vice President and Director in the firm's Education Chicago office. Representative projects include: University of Illinois Chicago, IL 0 Mount Prospect Village Hall Parking Ramp., Mount Prospect,, IL B.A. Arch itectu r 1988 0 Malcolm X College Parking Facility, Chicago, IL 0 Fenwilck High School Garage, Oak Park, IL Active Registrations Illinois 0 Buckingham Place Parking Structure, DesPlaines, IL 0 M2 on Nell Street/Hill Street Parking Facility, Urbana, IL National Council of 0 Vail Avenue Parking Garage Renovation & Expansion, Arlington Heights,, IL Architectural Registration 0 Advocate Lutheran Garage, DesPlames, IL Boards (NCARB) 0 Zurich NA Parking Structure, Schaumburg., IL 0 Springfield Clinic Foundation North Parking Structure, Springfield, IL PROJECT ASSIGNMENT 0 RR Donnelley Employee Parking Structure, Warrenville, IL Project Manager 0 Memorial Medical Center Physicians Parking Deck, Springfield, IL 0 Truman College Parking Facility, Chicago.. IL 0 University of Illinois Urbana -Champaign., Lot F-29 Fire Substation, Champaign, IL Rush -Copley Medical Center Employee Parking Garage Horizontal Expansion,, Aurora IL Randolph & Wabash Parking Garage Elevator Addition - Chicago,, IL Enterprise Center Parking Garage Elevator Addition - ® Louis, MO Hill Farms State Garage., Madison,. Wl Scioto Peninsula Garage, Columbus, OH Echo Park Parking Structure,, San Antonio,, TX University of Notre Dame PS,. Notre Dame, IN University of Wisconsin HCA Parking Structure, Madison, Wl Hyatt Eastwood Parking Structure, East Lansing, Ml • XNA Regional Airport Parking Garage, Bentonville Arkansas • Cleveland Clinic Podiatry Garage, Cleveland, OH • University Hospitals Lot 59 Replacement PS, Cleveland, OH • Goodyear Tech Center Parking Structure,, Akron., OH • Bridgestone Tech Center Parking Structure, Akron, OH • Summa Healthcare Parking Facility, Akron,, OH • South Campus Gateway Parking Structure, Columbus, OH • Scottsdale Crossing Building E Parking Deck and Retail Facility, Scottsdale, AZ • Oakwood Hospital North Addition Parking Garage,. Dearborn, Ml Village of Mount Prospect Public Works Fe. cKinical IISroposal - Rhase 1 Engit-ie&tiii ng / Main Street III stri&iri Bridge Page 10 G Total Years of Experience 36 Years with DESMAN 36 Education University Illinois B.A.1 Architectural Design rdegree) Minor ® History of Art an Architecture Active Alabama Louisiana Arizona Maryland Arkansas is ri California Nevada Colorado North Carolina Florida i Georgia Pennsylvania Hawaii South Carolina Illinois ss Indiana a Iowa Utah NCARB (National c'i of Architectural Registration Boards) Certified arks art Advisor (Greenr ing Certificati Affiliatons InstituteArt of Chicago Cleveland ti Society National ri Association Parking s is Council PIROJECT ASSIGNMENT Principal -in -Charge Parldirig Design Specialist budget and schedule control. ® Rebora understands the importance of the implementatin of project requirements and will ensure that the necessary manpower is available for the efficient, draftcost effective and successful completion of the project. He will also review all and final drawings and documents before they are delivered r review and milestone • Truman College Parking Facillity, Chicago., IL • O'Hare Preflight., DesPlaines., IL • Randolph & Wabash Parking Garage Elevator Addiltion - Ch*cago.. IL • Enterprise Center Parkmg Garage Elevator Addition - ® , MO • Hill Farms State Garage, Madison, WI • Hyatt Eastwood Parking Structure, East Lansing, MI Regional it rt Parking Garage, Bentonville • Goodyear Tech Center Parking r, Akron, OH • Bridgestone Tech Center Parking , Akron, OH • Scioto Peninsula Garage, Columbus, OH • South Campus Gateway Parking , Columbus, OH • University Hospital i Visitor Parking Structure, Cleveland, OH Village f Mount Prospect ect II li rlks Fe. c h iti i i IProposal - Rhase 1 Engit-ie&-iiirigain Street Pedestri&iri Bridge P APPENDIX, �RESUMES OF KEY PERSONNEL Total Years of Experience 17 Years with DESMAN 10 Education University of Illinois Chicago Masters of Architecture Architecture is University Bachelor of Arts Philosophical Studies PROJEc r ASSIGNMEN I Pair Architect PROJECT ARCI I ITECT Deninis Williams ® Williams has been involved in architectural design, coordination,, contract documentatI on and construction for over 17 years. His responsibilities have included analysis of client's needs, exploration of schematic alternatives, field surveys, and supervision of working drawing production, specification writing and constructI on administration, project close-out, coordination of work by outside consultants including civil engineering, architectural design, interior design, structural analysis, mechanical, plumbing, electrical and landscaping design. He has extensive experience in the use of the AutoCAD & Revit systems to automate drawing production and project delivery. Dennis has over 11 years; experience with DESMAN on parking structures and will play an integral role in the development of the design, drawings and documents for the project as well as coordination between the team members. Some of Mr. Williams' recent experience includes: * Memorial Medical Center Physicians Parking Deck, Springfield, IL * The New Malcolm X College Parking Garage., Chicago., IL • Fenwilck High School Garage, Oak Park, IL • Rush -Copley Medical Center Employee Parking Garage Horizontal Expansion, Aurora IL • Advocate Health Care Support Center Parking Deck Expansion, Oak Brook, IL * Zurich North American Garages, Schaumburg., IL * 800 North Garages, Skokie, IL • XNA Regional Airport Parking Garage, Bentonville Arkansas • 3rd Ave Garage., Pittsburgh Parking Authority,, Pittsburgh,, PA • XNA Airport Garages, Benton, AR • University of Pittsburgh CIC Garage, Pittsburgh, PA • University of Pittsburgh Recrecation Center, Pittsburgh, PA 0 VA Erie Garages, Erie, PA Village of 1\4ount Piirospect Public Worill s Fe. chtiical IIIAroposal - Rhase 1 Engiii t-ie&tiii iirig / Main Street III stri&iri Bridge Page 1, 2 APPENDIX, �RESUMES OF KEY PERSONNEL LEAD STRUCTURAL ENGINEER D. Yu iry Sweti in, S E� I�D E Village of Mount Prospect Public Works Fe. cKin ical IISroposal - Rhase 1 Engiii t-ie&iriii iing / Main Street III stri&in Bridge Page 13 Since 1977, Mr. Swetin's experience in the structural design field has included major lr�rdesign and project management responsibilities. He has almost 40 years of experi ence and is one of the most respected structural engineers in the parking industry 'IF N OF IFFIFF" experience in and a constant leader. His vast knowledge and parking structures will be a great asset to the project's success and for the structures long term durability. df The following are some of the projects that Mr. Swetin has been involved in.. Total Years of Experience e University of Chicago 61st & Drexel — Parking Garage and Medical Office 41 Building, Chicago, IL e Super K -Mart Plaza Parking Area Retrofit, Vernon Hills, IL Years with DESMAN * Allstate Insurance Co., Corporation Headquarters, Northbrook, IL 23 e Barrington Library,, Barrington,, IL Education e Pansophilc Systems Corporate Headquarters.. Lllsle,, IL Dnipropetrovsk National * University of Illinois — Lot F-29 parking Structure and Fire Sub -station,, University of Railroad Champaign., IL Transport - Dnipropetrovsk, * City of Dubuque 10th & Central — Parking Facility and Fire Station, Ukraine (former USSR) Dubuque., IA M.S. Civil Engineering (U.S. Equivalent) e St. Mary"s of Vernon Church Rectory Addition,, Vernon H*111s,, IL Illinois Institute of Technol- e Parkview Plaza, 9 -Story Office Building with 3 -Level Underground Parking ogy —Chicago, IL Garage, Oakbrook Terrace, IL M.S. Civil Engineering — e Moody Bible Institute Parking Garage (5 levels), Chicago,, IL Major - Structures e Lighthouse for The Blind Addition,, Chicago., IL e Veterans Hospital — Garage, Cleveland, OH Active Registrations Pennsylvania PE — 084909 e University Hospitals — Patient Parking Garage, Cleveland, OH Ohio PE — E-61471 Hill Farms State Garage, Madison, WI Illinois 9 Columbus City Hall Garage, Columbus, OH SE — 081-004519 * Cleveland Clinic E. 105th Garage., Cleveland, OH PE — 062-044745 Hyatt Legacy Garage, Cleveland, OH Arizona PE - 46433 * Goodale Street Garage, Columbus, OH Louisiana PE - 35823 Missouri PE — EN -028171 9 University Hospitals Case Center — Patient/Visitor Parking Garage and Florida PE - 74833 Connector Bridge, Cleveland, OH Iowa PE - 13774 * Case Western Reserve University, University Hospitals — Main Garage, Michigan PE — 6201045793 Cleveland, OH Utah PSE — ® e Meridia Hillcrest Hospital — Garage, Cleveland, OH MetroHealth —Valentine Parking Facility, Cleveland, OH Affiliations 9 Cleveland Clinic 89th Street — Employee Garage and Service Center, American Concrete Institute (ACI) Cleveland, OH * Scioto Peninsula Underground Garage,, Columbus., OH American Institute of Steel * Ohio State University — Lane Avenue Garage, Columbus, OH Construction (AISC) 9 Nationwide Insurance — Employee Garage, Columbus, OH PROJECT ASSIGNMENT * AEP Parking Structure, Columbus, OH Lead Structural Engineer * Arena Grand — Parking Structure, Columbus, OH e BWC — Parking Structure, Columbus, OH Village of Mount Prospect Public Works Fe. cKin ical IISroposal - Rhase 1 Engiii t-ie&iriii iing / Main Street III stri&in Bridge Page 13 Engineering APPENDIX, �RESUMES OF K ELenergy. focused. JASON ALLEN P.E., LEED AP Mechanical Engineer Education Bachelor of Science, Architectural Engineering Milwaukee School of Engineering Licenses & Certifications Registered Professional Engineer: Arizona, California, Delaware, Iowa, Michigan, Missouri, New York, Pennsylvania, South Dakota, Tennessee, Utah, Virginia, Wisconsin LEED° (Leadership in Energy & Environmental Design) Accredited Professional by U.S. Green Building Council NCEES Record Jason Allen, PE Jason has 20 years of professional experience as a mechanical engineer. A Senior Vice President of Henneman Engineering, he is Director of the Milwaukee Office. Jason has provided engineering services related to healthcare, higher education, and governmental facilities. He specializes in the design of HVAC systems. Fenwick High School, Parking Garage, Oak Park, Illinois Camp Douglas, Battery Charging Stations, Camp Douglas, Wisconsin Aspirus Wausau Hospital, Wausau, Wisconsin • Multiple AHU Evaluations & Improvements • Ambulance Garage Expansion • Emergency Generator Replacement • IT Closet Infrastructure Upgrade • Short Order Cook Line and Hood Study Milwaukee County Parks, Milwaukee, Wisconsin • Calvin Moody Park New Community Building & Park Renovation • Johnson's Park Pathway Lighting Renovation Milwaukee Mitchell International Airport, Milwaukee, Wisconsin • Data Center Upgrade • MKE Regional Business Park Electrical Infrastructure Upgrade State of Wisconsin, FC Heavy Unit Storage Building, Wisconsin Dells, Wisconsin Waukesha County Technical College, Pewaukee, Wisconsin • Multiple AHU Replacements • CDL Track and Storage Sheds Remodel • Culinary Renovation Phase 3, Building A • Cooling Tower Replacement • Diesel Technician Lab Renovation, Building G • Fabrication Lab, Building I • Gas Piping to Laser Cut Machine, Building H • HUB & SGA — Kitchen Renovation, Building C • Laser Cutting Machine Gas Piping, Building H • New Sprinkler System, Building L • North Parking Lot Lighting & Security • Power and Data to Exterior Signage • Supplemental Chiller, Building D Wisconsin Department of Military Affairs, AASF 1 Hanger Addition, West Bend, Wisconsin University of Wisconsin -Whitewater, Drumlin Hall Loading Dock Renovation, Whitewater, Wisconsin Dane County, 911 Center Renovation, Madison, Wisconsin Career History Osceola Discovery Center, Village Hall & Library, Osceola, Wisconsin 2005 -Present Henneman Illinois Beach State Park, Concession Replacement, Zion, Illinois 1999-2005 Other Firms Harold Washington Social Security Center, Revolving Door Alterations, Chicago, Illinois Winnebago County, Administration Building Remodel, Rockford, Illinois Stephenson Public Library, Addition and Renovation, Marinette, Wisconsin UW Health Research Park Clinic, Madison, Wisconsin • Cooling Tower & Chiller Replacement • Cooling Tower Replacement Construction Administration and Commissioning Village f Mount Prospect Public rII Fe. c h iin i c l IProposal - Rha iii iir i. ir- iii ing / Main Street I d t r i a iiri Bridge Page 14 � i ........ . CAGE C 11 V 1111 Matthew Schumacher, P. E. -Director of Operations ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Mr. Schumacher has over 13 years of experience in the land development industry servicing clients in the residential, commercial, industrial and institutional markets. His design responsibilities include site layout and design, utility design, site grading, soil erosion and sedimentation control planning, detention basin sizing, storm water management design and modeling, roadway design, parking lot design, permit coordination, and general consultant management and coordination during the conceptual, preliminary, and final design phases. Educational / Athletic Complex / Institutional Holmes Elementary School Addition Maercker School District 60, Westmont, Illinois Westview Hills Middle School Addition Maercker School District 60, Westmont, Illinois Jefferson Early Childhood Center Wheaton Warrenville C.U.S.D 200, Wheaton, Illinois Science and Health Careers Center Oakton Community College, Des Plaines, Illinois Commercial / Office / Industrial Nicholas & Associates Office Expansion Nicholas & Associates, Mount Prospect, Illinois 431 Lakeview Court Dock Additions Nicholas & Associates, Mount Prospect, Illinois Speculative Warehouse (252,000 SF) Crow Holdings Industrial, Channahon, Illinois Speculative Warehouse (116,000 SF) Dayton Street Partners, Bensenville, Illinois Residential / Senior Living / Hotel Sixteen30 Luxury Apartments Wingspan Development Group, LLC., Plainfield, Illinois Maple Street Lofts - Mixed Use Development Wingspan Development Group, LLC, Mt. Prospect, Illinois Twenty West Mixed Use Development Wingspan Development, Mount Prospect, Illinois 2845 W. Belden Avenue Apartments Inland Development Corporation, Chicago, Illinois Illinois PE # 062-062674 YEARS OF EXPERIENCE 13 years EDUCATION BS -Civil Engineering University of Illinois Urbana -Champaign Graduated with Honors Preliminary Site Design Final Site Design Project Management Site Grading and Earthwork Analysis Potable Water System Design Stormwater Collection Design Sanitary Sewer and Lift Station Design Stormwater Management Design Permit Coordination with Local and State Agencies SOFTWARE PROFICIENCIES AutoCAD Civil 3D AutoTURN AGTEK Hydraflow Hydrographs Village of Mount Prospect Public Works Fe. c Kin i c l IProposal - P III e 1 Enghrie&rhng / Main Street P e tri iin Bridge Page