Loading...
HomeMy WebLinkAbout04/16/2019 Bid Result Design and Construction Engineering Services - Maple Street Parking Deck5/1/2019 BoardDocs® Pro Agenda Item Details Meeting Apr 16, 2019 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m. Category 8. VILLAGE MANAGER'S REPORT Subject 8.2 Motion to accept proposal for design and construction engineering services for Maple Street Parking Deck in an amount not to exceed $248,500. Access Public Type Action Preferred Date Apr 16, 2019 Absolute Date Apr 16, 2019 Fiscal Impact Yes Dollar Amount 248,500.00 Budgeted Yes Budget Source Tax Increment Financing District Fund Recommended Action Accept the proposal for design and construction engineering services to construct the Maple Street Parking Deck as submitted by Walker Consultants of Hoffman Estates, Illinois in an amount not to exceed $248,500. Public Content Plans for the Maple Street Lofts redevelopment project include design and construction of a 268 -space, multi- level parking garage. This facility will be designed and constructed in conjunction with the redevelopment project, but will be owned and operated by the Village. The Village is responsible for costs associated with designing and constructing the deck. The parking spaces provided by this new deck are intended to replace the Maple Street surface parking lot. A portion of the land presently occupied by the Maple Street Parking Lot will be redeveloped with a mixed-use building with rental apartments and commercial space, as well as a portion of rowhomes with related improvements such as underground stormwater detention. Attachment A depicts the location of the proposed Maple Street Parking Deck as it relates to the project's site plan. Attachment B presents a potential layout concept. Request for Proposals (RFP). To design this deck, staff requires technical assistance from a qualified parking facility design and construction consultant. Accordingly, staff prepared a detailed request for proposals (RFP) necessary to solicit these services. A copy of this RFP is enclosed as Attachment C. Parking facility consultants were asked to submit a technical proposal detailing the firm's background, key personnel, and approach to the project. In addition, each firm was also asked to submit a separate cost proposal indicating work effort anticipated and a not -to -exceed fee. The required scope of work included topography and field data collection; preparation of plans and bid documents; and construction management/inspection (Phase 2 and Phase 3 engineering). Two (2) technical proposals and two (2) cost proposals were received. Each proposal was evaluated based on the background of the firm, related project experience, proposed services and scope of work, schedule, work effort, and https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 1/3 5/1/2019 proposal content. Table 1 below summarizes this analysis: Table 1: Technical Proposal Analysis BoardDocs® Pro Category Max Points Walker Consultants Desman Design Management Background 20 20 20 Experience 20 20 20 Scope 25 23 19 Schedule 15 14 13 Work Effort 10 9 7 Content 10 10 7 Totals: 100 96 86 Each firm was also asked to submit a cost proposal as well. Table 2 below summarizes staff's analysis of costs: Table 2: Cost Proposal Analysis Firm Hours Total Cost Cost / Hour Walker Consultants 1,508 $248,500 $165 Desman 1,083 $276,300 $255 The highest rated, and lowest -cost proposals, were submitted by Walker Consultants of Hoffman Estates, Illinois (Walker). Walker is a global consulting firm that specializes in the design and construction of parking facilities. The firm was started in 1965 and presently has over 300 employees in 18 domestic and one (1) international office. The firm has designed and constructed parking facilities in all 50 states and 20 foreign countries. The firm maintains a regional office in Hoffman Estates, Illinois. Staff conducted interviews with representatives from Walker and Desman Design Management. Although both firms fielded exceptional project teams, it is the opinion of staff that Walker submitted a more qualitative proposal and assembled a uniquely qualified project team that will better serve the Village's needs. Notably, Walker designed and constructed comparable decks in Libertyville and Palatine. Reference checks with both of these communities yielded positive endorsements and complimentary comments about the firm's performance. In addition, Walker has had several projects, including recent developments in Glen Ellyn and Elgin, that incorporate the shared use of an adjacent building foundation. This component differentiates the project and requires a high level of communication, planning, and coordination with third -party contractors and designers. Most importantly, Walker has ample experience working in public/private partnerships as advocates for government agencies. Consequently, staff is confident the firm will represent the interests of the Village well while working to deliver a cost-effective, aesthetically pleasing parking facility. It is staff's opinion that Walker understands the proposed project, has prepared a thorough proposal based on extensive and unique experience, and is best qualified to perform the work. Staff has also concluded that Walker has allocated sufficient work effort (1,508 hours) and their average hourly rate ($165) is competitive. Alternatives 1. Accept proposal for Maple Street Parking Deck design and construction engineering services submitted by Walker Consultants of Hoffman Estates, Illinois. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board accept the proposal for design and construction engineering services to construct the Maple Street Parking Deck as submitted by Walker Consultants of Hoffman Estates, Illinois in an amount not to exceed $248,500. https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 2/3 5/1/2019 BoardDocs® Pro Attachment B _ Maple Street Deck Layout Concept.pdf (171 KB) Attachment C _ Maple Street Parking Deck Design RFP.pdf (376 KB) Attachment E _ Walker Consultants Cost Proposal.pdf (4,503 KB) Attachment D _ Walker Consultants Technical Proposal.pdf (14,907 KB) MSL Parking Deck Location - Exhibit A.png (2,348 KB) Administrative Content I've replaced Attachment A as it had the old OLD old MSL site plan as the background image. - NB Executive Content Motion & Voting Accept the proposal for design and construction engineering services to construct the Maple Street Parking Deck as submitted by Walker Consultants of Hoffman Estates, Illinois in an amount not to exceed $248,500. Motion by Michael Zadel, second by Richard Rogers. Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login# 3/3