Loading...
HomeMy WebLinkAbout03/19/2019 Bid Result - Street Resurfacing Program Page 1 of 3 Agenda Item Details MeetingMar 19, 2019 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m. Category8. VILLAGE MANAGER'S REPORT Subject8.3 Motion to accept bid for Street Resurfacing Program in an amount not to exceed $4,390,952. AccessPublic TypeAction Preferred DateMar 19, 2019 Absolute DateMar 19, 2019 Fiscal ImpactYes Dollar Amount4,390,952.00 Budget SourceStreet Improvement Cosntruction Fund and Motor Fuel Tax Fund Recommended ActionAward the contract for the 2019 Street Resurfacing Program to the lowest cost, responsive bidder, Arrow Road Construction Company of Mount Prospect, Illinois in an amount not to exceed $4,390,952. Public Content Information The purpose of the Village’s Street Resurfacing Program is to maintain all Village streets on an average 20-year service life cycle. To meet this goal, at least 6.84 miles of Village streets must be resurfaced on an annual basis. The 2019 Street Resurfacing Program includes 7.29 miles of streets and is being funded through the Street Improvement Construction Fund and a portion of the Motor Fuel Tax (MFT) Fund. A map denoting streets targeted in this year's program is attached. Bid Results A notice to bidders was posted on the Demandstar by Onvia website on February 27, 2019 and in the IDOT Contractors Bulletin on March 1, 2019. Eight (8) general contractors obtained the bid documents. A copy of the bid document is attached. Page 2 of 3 On March 11, 2019 at 1:00 PM, sealed bids for the 2019 Street Resurfacing Program were publicly opened and read aloud. Five contractors submitted bids for this project. The bids ranged from a low of $43,991,774.88 by Arrow Road Construction Company, to a high of $4,783,200.00 by Johnson Paving Company Below is a summary of the bids: BiddersTotal Bid Arrow Road Construction Company$3,991,774.88 Builder’s Asphalt$4,398,000.00 Schroeder Asphalt Services, Inc.$4,500,454.79 A. Lamp Concrete Contractors, Inc.$4,596,998.39 Johnson Paving Company$4,783,200.00 Engineer’s Estimate$4,296,650.40 Discsussion All bid submittals were checked for accuracy. All bidders submitted Bid Bonds in the amount of 5% of their total bids, as required. All bidders correctly signed their bids and bid bonds. Not considering the specialty construction items in this year’s bid, which include concrete pavement patching of Wolf Road and full depth resurfacing and storm sewer replacement of recently annexed Malmo Drive, the comparative bid prices this year for typical street resurfacing items represent a 0.4% increase in cost compared to the 2018 bid. The cost to resurface one mile of village streets is $511,052, compared to $509,000 in 2018 and $497,000 in 2017. The low bidder, Arrow Road Construction Co. has previously completed street improvements for the Village, including the 2015, 2016, 2017, and 2018 Street Resurfacing Programs. The work from Arrow Road Construction Co. has been acceptable. For reference, a copy of Arrow Road's bid submittal is attached. Staff recommends including a 10% contingency in the project award to allow for quantity variances and unanticipated construction conflicts. In this instance, a 10% contingency added to the lowest cost bid would result in a total contract award of $4,390,952.00 (Base Bid: $3,991,774.88 + 10% Contingency: $399,177.12 = Total Recommended Award: $4,390,952.00). Alternatives 1. Accept lowest cost, responsive bid for the 2019 Street Resurfacing Program. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the lowest cost, responsive bidder, Arrow Road Construction Company of Mount Prospect, Illinois be awarded the contract for the 2019 Street Resurfacing Program in the amount not to exceed $4,390,952. Page 3 of 3 Project Map-2.pdf (92 KB)2019 Resurfacing (Arrow Road Bid).pdf (1,687 KB)Bid Document.pdf (6,546 KB) Administrative Content Executive Content Motion & Voting Award the contract for the 2019 Street Resurfacing Program to the lowest cost, responsive bidder, Arrow Road Construction Company of Mount Prospect, Illinois in an amount not to exceed $4,390,952. Motion by Michael Zadel, second by Richard Rogers. Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel