HomeMy WebLinkAbout10/16/2018 See Gwun Bridge RepairsBoardDocs® Pro Agenda Item Details Meeting Category Subject Access Type Preferred Date Absolute Date Dollar Amount Budgeted Budget Source Recommended Action Public Content Background Page I of 2 5.3 Motion to accept bid for See Gwun Avenue Bridge Repairs in an amount not to exceed $43,340. Action (Consent) Oct 16, 2018 Oct 16, 2018 43,340.00 Yes I =9 Accept the lowest cost, responsive bid to repair the See Gwun Avenue bridge as submitted b ' Path Construction Company of Arlington Heights, Illinois in an amount not to exceed $43,341 During the routine bridge inspections in 2017, it was observed that repairs were needed to the See Gwun Bridge. Tho -04' repairs include concrete beam repair, substructure repair and deck sealing. Plans and specifications were prepared t! iddress these repairs and the project was let for bid. A map depicting the location of the See Gwun Bridge is attached. Bil ,#ocuments are also enclosed. i The contract time for this project is 30 days. The bridge will remain open to vehicular traffic throughout most of thc project. However, final curing will require complete closure of the deck for a period of 48 hours. Once a detailed schedult is established, appropriate stakeholders, including the park district, school districts, residents, and public safety personnel will be advised of the bridge closure dates. In addition, notice will be posted on the roadway, Village website, and social media outlets. Bid Results A Notice to Bidders was posted on the Demandstar by Onvia website and published in a local newspapel The bid opening was held on October 9, 2018 at 1:00 PM. Six (6) contractors submitted bids for this project. The bids ranged from a low of $39,400 by Path Construction to a high of $172,574.00 by Martam Construction, Inc. Below is a summary of the bids: https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 11/9/2018 Path Construction Rausch Infrastructure ,Alliance Contractors Kovilic Construction Martam Construction https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 11/9/2018 BoardDocs® Pro Page 2 of 2 All bidders submitted a bid bond in the amount of 10% of the total bid as required in the bid proposal packet. All bids werc checked for their accuracy. One error was found, but it did not change the order of the bids. All bidders correctly signed their bids and bid bonds. The low bidder, Path Construction Company, is qualified to complete the work involved with this project and meets the requirements of the contract documents. They previously completed the Lincoln Street Bridge Rehabilitation Project and constructed the Northwest Highway Streetscape Improvements. Their work on both of these Village projects was acceptable. In addition, reference checks indicate satisfactory performance on projects of similar scope in other communities. Staff recommends including a 10% contingency in the project award to allow for quantity variances and unanticipated conditions. In this instance, a 10% contingency added to the lowest cost bid would result in a total contract award of $39,400.00 (Base Bid: $39f4OO.00 + Contingency: $3,940.00 = Total Recommended Award: $43,340.00). 1. Accept lowest cost, responsive bid to repair See Gwun Avenue Bridge. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board accept the lowest cost, responsive bid to repair the See Gwun Avenue bridge as submitted by Path Construction Company of Arlington Heights, Illinois in an amount not to exceed $43,340. 1 -i Bridge [Zepair - Path C&nstructi&n --B'1D.pdf (11 ,108 KB) -ocati&n Map.pdf (249 KB) 201.8 See Gwu�r -i�nal.pdf (444 KB) Pl&ns-Fi�naLpdf (900 KB) Specs -1: ................. i ..... Administrative Content Executive Content All items under Consent Agenda are considered routine by the Village Board and will be enacted by one motion. There will be no separate discussion of those items unless a Board member or member from the audience so requests, in which the item will be removed from the Consent Agenda and considered in its sequence on the agenda. Motion & Voting Jill 11111111 Motion by Paul Hoefert, second by Colleen Saccotelli. Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 11/9/2018