Loading...
HomeMy WebLinkAbout8.1 Motion to Accept Bid for Randview Highlands Street Light ImprovementsBoardDocs® Pro Page I of 2 Agenda Item Details Meeting Sep 04, 2018 - REGULAR MEETING OF THEM UT PROSPECT VILLAGE BOARD - 7:00 p.m. Category 8. VILLAGE MANAGER'S REPORT Subject 8.1 Motion to accept bid for Randview Highlands Street Light Improvements for an amount not to exceed $174,800.00. Access Public Type Action Preferred Date Sep 04, 2018 Absolute Date Sep 04, 2018 Fiscal Impact Yes Dollar Amount 174f800.04 Budgeted Yes Budget Source Motor Fuel Tax Fund Recommended Action Accept the bid from Thorne Electric, Inc of Wheaton, Illinois to construct the Randview Highlands Streetlight Project for an amount not to exceed $174,800. Public Content A key component of the Mount Prospect Strategic Plan is to improve the Village"s residential streetlight system. Th Randview Highlands neighborhood is located immediately south of Kensington Road and west of Main Street (IL Rout 83). The area includes Prospect High School and Fairview Elementary School. The neighborhood currently has ComEd owned streetlights only at intersections, providing limited nighttime visibility. The block between Highland Street an Kensington Road is twice as long (1320") as a typical block, further limiting light in the neighborhood. Streetligh improvements this year are targeted for four streets between Highland Street and Kensington Road to provid improved nighttime visibility and safety in the neighborhood. The project limits include Forest Avenue, Fairvie Avenue, Prospect Manor Avenue, and Eastwood Avenue. A future project would add streetlights along the four street, east of the current project as funds become available. Baxter & Woodman Consulting Engineers, Inc. (Baxter & Woodman) is currently under contract for this project. They provided the engineering design services necessary to prepare project plans and bid specifications. These bidding ,#ocuments were approved by IDOT earlier this summer. Their contract also includes inspection services during construction. At this time, Village staff is seeking to enter into a contract to construct the improvements. Work is txpected to begin in September and be completed before the end of the year. wiffamn The Village opened bids on August 20, 2018. A notice was published in the IDOT Construction Bulletin as well as o DemandStar via the Village website. Five (5) contractors viewed the bidding documents with three (3) contractor submitting a bid. Thorne Electric, Inc. of Wheaton, IL was the low bidder with a bid of $158,941.37. The complete bi results are: I -01 "66 4 •4! 0 Thorne Electric, Inc. $158f941.37 https://www.boarddocs.com/il/vomp/Board.nsf/Public 9/7/2018 BoardDocs® Pro Page 2 of 2 Utility Dynamics Corporation lj�165,093.50 Home Towne Electric, Inc. [$183f465.00 The bidders submitted a bid bond in the amount of 5% of their total bid as required by the contract documents. Th bids were checked for accuracy. There were no errors. The bidders submitted all of the required documents an correctly signed their bid and bid bond. I The apparent low bid marginally exceeds the engineer's estimate of $157,265. However, on May 15, 2018 the Villag- awarded a contract for the Willow/Cypress residential streetlight project that included the same streetlight equipmen The average cost per pole installed for the Willow/Cypress streetlight project was $8,657.64. The average cost per pol installed for the Randview Highlands streetlight project (at 20 total streetlights) is $7,947.07. This represents reduction of 8.9% per pole. I A primary business focus of Thorne Electric, Inc. is streetlight installation. Their clients include municipalities, countie IDOT, and private companies. References from the Village of Plainfield and Village of Glen Ellyn indicate Thorne Electri Inc. has performed well in their communities. Baxter & Woodman has previously worked with Thorne Electric, Inc. an I found their performance to be acceptable. They meet the eligibility requirements of IDOT to perform streetlight wor pursuant to the contract documents. I It is recommended that a 10% contingency be included in the project award to allow for quantity variances and unanticipated conflicts. For this project, a 10% contingency added to the lowest bid would result in a total contract iward of $174,800. (Base Bid: $158,941.37 + Contingency: $15,858.63 = Total Recommended Award: $174,800). 1. Accept bid from Thorne Electric for a not to exceed amount of $174,800. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board accept the low bid from Thorne Electric, Inc. of Wheaton, IL to construct the Randview Highlands Streetlight Project for an amount not to exceed $174,800. Administrative Content AB: It seems like most of the time we see, "accept bid in an amount not to exceed $10". This memo has, "for a not to exceed amount of $10". Is this an area where we should have a consistent message? FIXED (NB) Does the memo need to state we are installing 20 streetlights? [Done NB] Should we recap public involvement or awareness opportunities the Village provided during this project so far? [It's a Strat Plan Objective, which is stated. Anything else? NB] Executive Content Motion & Voting Accept the bid from Thorne Electric, Inc of Wheaton, Illinois to construct the Randview Highlands Streetlight Project fo an amount not to exceed $174,800. 1 Motion by Richard Rogers, second by Michael Zadl. Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel https://www.boarddocs.com/il/vomp/Board.nsf/Public 9/7/2018 sy CN uj ui ui z 0 CA o (D U) z U) tL CD LJJ CA CL 0 00 to 0 - UJ Z C) LL. o Ll- CL LAJ lz:l LL. 0 ax z ui ca (A co :5 uj w CL LIJ LAJ MEN= LU sy CN W 1,-lLl'­",'l,l� ...... 1!1111!11�� lllll�111�1,� wvl!�T� ui ui 1,-lLl'­",'l,l� ...... 1!1111!11�� lllll�111�1,� wvl!�T� P L - ry .5 ui Z < z z w 1 7. z zFF 0 c P P 0 L� L Et R, o .0 cc �7, > z o 0 oz 0 z C., 0. 0 u M 51 "1 111 C, I I 1 1, 1 "1 E 5 05 t r— o c E P� Z 12 S, < U -F 0❑ o Lu L-Lj 2, v, 62 < uj im 's Z Cc E', 0r. �7 c 6 L 71 - Ij < u .:O u F O 0 U �r,7 �j 10 1 c v, 9 E C, u 6� u 73 D, u A 'of Q- > S? 5 n - 0 z z Z z z o »:. } : / \\ \Y/ > \>Z�j CL lolo (D 0 CL 21 0u 11 - � s - \ r\ \6F2\\ \\ - 5 Ll IL ^ `� \\ g } ol - _1 19 § )� ]§ \ 6\ LL , \ §z } `k 1. 2 Lu _ o W-�,,2n / / \\\\ \ \ 10 20, 08 ox Im o 00 _ - : (\}}\jam\\/\\/\§\/\\\\\}\ u J �y w�aUJ j W <) X42 wZ C5 £1 W AGO � W WJ nw .`c ww v7w ��—vGi� W� IryV' zWa �r w r ar,z d J� WJ V ..ZZc03 fJ � J - x K Z W 1- C] } d s S J� S 7. Id • JJ Y ?`rte CL v/n��L W C} �� UC]li� �,� x< G a� H a.OG WW 4aFOZ G U�ylVZW U ZZ hw Uo =s 03 aw OOi � d (J WC>W O S? KJ W J Old JCY N `Ztx/1 O a h W S Wx� ww wdon yz JW an a �. Baa a w d W,j O W Or day w G G W ZFSW �ZLJH lJ tl S a Z W _ O dC7 d h0 C]x wl'''l�U �C5 G flx CCOWS wdl-NZ_Z_ � °�"' Z Wa a W '-'l<I W UZ 4CQ] A) tiG dU ."k wCCwZ p WJ[C WS.} oSCGJ wa on.-. Wd >' a ire 5 dYT" vW IM M W J000� W W d _tea VIvNR O d�¢w hW� Lw SZ SWS ''C YNt✓1 z U QN F d.�.F dLUHQf/IIv'1 W VY d N O 2 Z xd tin ^Q^ a W E Gi O OO CCY CJ W a N. J� III dCJ z� K x G S F ip � BC d. x nd W} .. er w S O U Oaz L ), UQ o JZ yj J U uS x•' Q..J W� , V W.ti U1 W i �O OZ Ci0 H ifi z r J C) .>acy aww z z Al-W�..cW.'r w cam rm e g , EDW. C? .Z ;l Jdti ^U^rr. C>G Z NwJ 1zl j5 o cl p E Zw a n5¢ac s❑ <P a.'°" Aa ¢Y. Vu �z 7�ix°� "21' Ci.}r�^i z32 Q j�W d w O a Eo Uo hWtll i�,'}aN J � u a' m ¢G w w,G��rs-r'a x J w�awu+ W W w d r -tl a C3 M 14o, .. a S � u� CL :� 4 ❑m.l XH � Z U 0 w q W J ¢ W N M P Vl S U z Z j0 o AKS J N Jd a w w4 W O W F �S � F z w a zaa� V1, m nom: J z w m zW zd qU ll� ® 4 U S W M'CSSIi vt O �Y��""UrCJ Nw NZ QQ AZO ip. o 6¢ cY �- w W � W a e Z Q 00 Q V w 0 iS9 .7 4 W W Mf Y. �4 .x. W t~iF •WDA � 3 � O 1-q zU Q Lw a •• .., .. t] W r -- � x """ i 4 0] S 0� .� G] CJ W Z 4 .,'[ �40 1-Rd]2 fSO HLt vZ1 2i2 M h 3�JZ I-tt. HH O 'z xz H ¢ H d OZ �' OEM i Bid Request For Randview Highlands Street Light Project Mount Prospect Public Works Department 1700 W. Central Road, Mount Prospect, Illinois 60056-2229 BID OPENING August 20, 2018 —1:00 P.M. Local Time Mount Prospect Village Hall, 3rd Floor 50 S. Emerson Street Mount Prospect, Illinois 60056 Iffl: I JP 1111nob Department Local Public Agency of Transportation Formal Contract Proposal PROPOSAL SUBMITTED BY Contractor's Name Street P.O. Box City State Zip Code STATE OF ILLINOIS COUNTY OF Cook -Village of Mount Prospect (Name of City, Village, Town or Road District) FOR THE IMPROVEMENT OF STREET NAME OR ROUTE NO. Randview Highlands Street Lii htin ! Pro ject SECTION NO, 18-0016900-11.,T For 'County and Road District Projects Submitted/Approved Highway Commissioner Date Submitted/Approved County Engineer/Superintendent of Highways Date Department of Transportation PA'elqAed f6r,bid based on liry )ftiid reV , ""W -Rogib-hal giineer t a'", Date 6 2.062227 LICENSED PROFESSIONAL' E ENGINEER OF Note: All proposal documents, including P,roposaN Guaranty Checks or Proposab Bid Bonds, should be stapled together to prevent loss when bids are processed. Printed 6/28/2018 Page 1 of 7 EILR 12200 (01/08/14) RETURN WITH BID County Cook NOTICE TO BIDDERS Local Public Agency Mount Prospect Section Number 18 -00169 -00 -LT Route Randview Highlands Sealed proposals for the improvement described below will be received at the office of the Village Manager, 3rd Floor, 50 S. Emerson Street, Mount Prospect, IL 60056 until 1:00pm on August 20, 2018 Address Time Date Sealed proposals will be opened and read publicly at the office of the Village Manager 3rd Floor, 50 S. Emerson Street, Mount Prospect, IL 60056 at 1:00pm on August 20, 2018 Address Time Date DESCRIPTION OF WORK Name Randview Highlands Street Lighting Project Length: 6100 feet ( 1.16 miles) Location Various - See location map on plan cover sheet Proposed Improvement Light pole installation, unit duct, conduit, lighting controller and other miscellaneous items of work. Plans and proposal forms will be available in the office of Village of Mount Prospect's website www.mountprospect.org/bids . Questions regarding this project should be directed to Daniel Schug at Baxter & Woodman Inc., 815-459-1260. Address 2. ® Prequalification If checked, the 2 low bidders must file within 24 hours after the letting an "Affidavit of Availability" (Form BC 57), in duplicate, showing all uncompleted contracts awarded to them and all low bids pending award for Federal, State, County, Municipal and private work. One original shall be filed with the Awarding Authority and one original with the IDOT District Office. 3. The Awarding Authority reserves the right to waive technicalities and to reject any or all proposals as provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals. 4. The following BLR Forms shall be returned by the bidder to the Awarding Authority: a. BLR 12200: Local Public Agency Formal Contract Proposal b. BLR 12200a Schedule of Prices c. BLR 12230: Proposal Bid Bond (if applicable) d. BLR 12325: Apprenticeship or Training Program Certification (do not use for federally funded projects) e. BLR 12326: Affidavit of Illinois Business Office Printed 7/25/2018 Page 2 of 7 BLR 12200 (01/08/14) RETURN WITH BID 5. The quantities appearing in the bid schedule are approximate and are prepared for the comparison of bids. Payment to the Contractor will be made only for the actual quantities of work performed and accepted or materials furnished according to the contract. The scheduled quantities of work to be done and materials to be furnished may be increased, decreased or omitted as hereinafter provided. 6. Submission of a bid shall be conclusive assurance and warranty the bidder has examined the plans and understands all requirements for the performance of work. The bidder will be responsible for all errors in the proposal resulting from failure or neglect to conduct an in depth examination. The Awarding Authority will, in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder. 7. The bidder shall take no advantage of any error or omission in the proposal and advertised contract. 8. If a special envelope is supplied by the Awarding Authority, each proposal should be submitted in that envelope furnished by the Awarding Agency and the blank spaces on the envelope shall be filled in correctly to clearly indicate its contents. When an envelope other than the special one furnished by the Awarding Authority is used, it shall be marked to clearly indicate its contents. When sent by mail, the sealed proposal shall be addressed to the Awarding Authority at the address and in care of the official in whose office the bids are to be received. All proposals shall be filed prior to the time and at the place specified in the Notice to Bidders. Proposals received after the time specified will be returned to the bidder unopened. 9. Permission will be given to a bidder to withdraw a proposal if the bidder makes the request in writing or in person before the time for opening proposals. Printed 6/22/2018 Page 3 of 7 BLR 12200 (01/08/14) RETURN WITH BID County Cook PROPOSAL Local Public Agency Mount Prospect Section Number 18 -00169 -00 -LT Route Randview Highlands 1. Proposal of for the improvement of the above section by the construction of Light pole installation, unit duct, conduit, lighting controller and other miscellaneous items of work. a total distance of 6100 feet, of which a distance of 6100 feet, ( 1.16 miles) are to be improved. 2. The plans for the proposed work are those prepared by Baxter & Woodman, Inc. and approved by the Department of Transportation on 3. The specifications referred to herein are those prepared by the Department of Transportation and designated as "Standard Specifications for Road and Bridge Construction" and the "Supplemental Specifications and Recurring Special Provisions" thereto, adopted and in effect on the date of invitation for bids. 4. The undersigned agrees to accept, as part of the contract, the applicable Special Provisions indicated on the "Check Sheet for Recurring Special Provisions" contained in this proposal. 5. The undersigned agrees to complete the work within 100 calendar days or by unless additional time is granted in accordance with the specifications. 6. A proposal guaranty in the proper amount, as specified in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals, will be required. Bid Bonds will be allowed as a proposal guaranty. Accompanying this proposal is either a bid bond if allowed, on Department form BLR 12230 or a proposal guaranty check, complying with the specifications, made payable to: Village Treasurer of Mount Prospect The amount of the check is 5% of the bid bond. ( ) 7. In the event that one proposal guaranty check is intended to cover two or more proposals, the amount must be equal to the sum of the proposal guaranties, which would be required for each individual proposal. If the proposal guaranty check is placed in another proposal, it will be found in the proposal for: Section Number 8. The successful bidder at the time of execution of the contract will be required to deposit a contract bond for the full amount of the award. When a contract bond is not required, the proposal guaranty check will be held in lieu thereof. If this proposal is accepted and the undersigned fails to execute a contract and contract bond as required, it is hereby agreed that the Bid Bond or check shall be forfeited to the Awarding Authority. 9. Each pay item should have a unit price and a total price. If no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity, the unit price shall govern. If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price. 10. A bid will be declared unacceptable if neither a unit price nor a total price is shown. 11. The undersigned submits herewith the schedule of prices on BLR 12200a covering the work to be performed under this contract. 12. The undersigned further agrees that if awarded the contract for the sections contained in the combinations on BLR 12200a, the work shall be in accordance with the requirements of each individual proposal for the multiple bid specified in the Schedule for Multiple Bids below. Printed 6/22/2018 Page 4 of 7 BLR 12200 (01/08/14) RETURN WITH BID Illinois Department of Transportation SCHEDULE OF PRICES County Cook Local Public Agency Village of Mount Prospect Section 18 -00169 -00 -LT 5cnedule for Multiple was Route Randview Highlands Combination Letter I Sections Included in Combinations I Total I Schedule for Single Bid (For complete information covering these items, see plans and specifications) Bidder's Proposal for making Entire Improvements Item Items Unit Quantity Unit Price Total No. 1 TEMPORARY FENCE FOOT 500 2 ELECTRIC SERVICE INSTALLATION EACH 1 ELECTRIC UTILITY SERVICE 3 L SUM 1 CONNECTION UNDERGROUND CONDUIT, GALVANIZED 4 FOOT 100 STEEL, 3" DIA. UNIT DUCT, 600V, 4-1C NO.8, 1/C NO.8 5 GROUND, (XLP-TYPE USE), 1 1/4" DIA. EACH 590 POLYETHYLENE UNIT DUCT, 600V, 2-1C NO.8, 1/C NO.8 6 GROUND, (XLP-TYPE USE), 3/4" DIA. EACH 4,725 POLYETHYLENE UNIT DUCT, 600V, 2-1C NO.8, 1/C NO.8 7 GROUND, (XLP-TYPE USE), 1 1/2" DIA. EACH 255 POLYETHYLENE LIGHTING CONTROLLER, BASE 8 EACH 1 MOUNTED, 240VOLT, 100AMP LIGHT POLE FOUNDATION, METAL, 11" 9 EACH 20 BOLT CIRCLE, 8 5/8" X 6' Printed 6/28/2018 Page 5-1 BLR 12200a (01/08/14) RETURN WITH BID Bidder's Proposal for making Entire Improvements Item Items Unit Quantity Unit Price Total No. BREAKAWAY DEVICE, COUPLING WITH 10 EACH 20 ALUMINUM SKIRT LUMINAIRE, LED, HORIZONTAL MOUNT, 11 EACH 20 LOW WATTAGE LIGHT POLE, ALUMINUM, 25 FT. M.H., 12 EACH 20 SINGLE 10' MAST ARM TRAFFIC CONTROL AND PROTECTION 13 L SUM 1 STANDARD 701501 TRAFFIC CONTROL AND PROTECTION 14 L SUM 1 STANDARD 701701 TRAFFIC CONTROL AND PROTECTION 15 L SUM 1 STANDARD 701801 16 CONSTRUCTION LAYOUT L SUM 1 Printed 6/28/2018 Page 5-2 BLR 12200a (01/08/14) RETURN WITH BID County Cook CONTRACTOR CERTIFICATIONS Local Public Agency Mount Prospect Section Number 18 -00169 -00 -LT Route Randview Highlands The certifications hereinafter made by the bidder are each a material representation of fact upon which reliance is placed should the Department enter into the contract with the bidder. 1. Debt Delinquency. The bidder or contractor or subcontractor, respectively, certifies that it is not delinquent in the payment of any tax administered by the Department of Revenue unless the individual or other entity is contesting, in accordance with the procedures established by the appropriate revenue Act, its liability for the tax or the amount of tax. Making a false statement voids the contract and allows the Department to recover all amounts paid to the individual or entity under the contract in a civil action. 2. Bid -Rigging or Bid Rotating. The bidder or contractor or subcontractor, respectively, certifies that it is not barred from contracting with the Department by reason of a violation of either 720 ILCS 5/33E-3 or 720 ILCS 5/33E-4. A violation of Section 33E-3 would be represented by a conviction of the crime of bid -rigging which, in addition to Class 3 felony sentencing, provides that any person convicted of this offense or any similar offense of any state or the United States which contains the same elements as this offense shall be barred for 5 years from the date of conviction from contracting with any unit of State or local government. No corporation shall be barred from contracting with any unit of State or local government as a result of a conviction under this Section of any employee or agent of such corporation if the employee so convicted is no longer employed by the corporation and: (1) it has been finally adjudicated not guilty or (2) if it demonstrates to the governmental entity with which it seeks to contract and that entity finds that the commission of the offense was neither authorized, requested, commanded, nor performed by a director, officer or a high managerial agent in behalf of the corporation. A violation of Section 33E-4 would be represented by a conviction of the crime of bid -rotating which, in addition to Class 2 felony sentencing, provides that any person convicted of this offense or any similar offense of any state or the United States which contains the same elements as this offense shall be permanently barred from contracting with any unit of State or local government. No corporation shall be barred from contracting with any unit of State or local government as a result of a conviction under this Section of any employee or agent of such corporation if the employee so convicted is no longer employed by the corporation and: (1) it has been finally adjudicated not guilty or (2) if it demonstrates to the governmental entity with which it seeks to contract and that entity finds that the commission of the offense was neither authorized, requested, commanded, nor performed by a director, officer or a high managerial agent in behalf of the corporation. 3. Bribery. The bidder or contractor or subcontractor, respectively, certifies that it has not been convicted of bribery or attempting to bribe an officer or employee of the State of Illinois or any unit of local government, nor has the firm made an admission of guilt of such conduct which is a matter of record, nor has an official, agent, or employee of the firm committed bribery or attempted bribery on behalf of the firm and pursuant to the direction or authorization of a responsible official of the firm. 4. Interim Suspension or Suspension. The bidder or contractor or subcontractor, respectively, certifies that it is not currently under a suspension as defined in Subpart I of Title 44 Subtitle A Chapter III Part 6 of the Illinois Administrative Code. Furthermore, if suspended prior to completion of this work, the contract or contracts executed for the completion of this work may be cancelled. Printed 6/22/2018 Page 6 of 7 BLR 12200 (01/08/14) SIGNATURES (If an individual) (If a partnership) RETURN WITH BID Signature of Bidder Business Address 21'11,0M. 1i - Signed By Business Address Inset Names and Addressed of All Partners (If a corporation) Attest: Corporate Name Signed By Business Address President Insert Names of OfficersSecretary Treasurer Secretary County Cook Local Public Agency Mount Prospect Section Number 18 -00169 -00 -LT Route Randview Highlands President Printed 6/22/2018 Page 7 of 7 BLR 12200 (01/08/14) (t Illinois Department of Transportation RETURN WITH BID PAPER BID BOND rM and Local Agency Proposal Bid Bond Route Randview Highlands County Cook Local Agency Mount Prospect Section 18 -00169 -00 -LT as PRINCIPAL, as SURETY, are held jointly, severally and firmly bound unto the above Local Agency (hereafter referred to as "LA") in the penal sum of 5% of the total bid price, or for the amount specified in the proposal documents in effect on the date of invitation for bids whichever is the lesser sum. We bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly pay to the LA this sum under the conditions of this instrument. WHEREAS THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that, the said PRINCIPAL is submitting a written proposal to the LA acting through its awarding authority for the construction of the work designated as the above section. THEREFORE if the proposal is accepted and a contract awarded to the PRINCIPAL by the LA for the above designated section and the PRINCIPAL shall within fifteen (15) days after award enter into a formal contract, furnish surety guaranteeing the faithful performance of the work, and furnish evidence of the required insurance coverage, all as provided in the "Standard Specifications for Road and Bridge Construction" and applicable Supplemental Specifications, then this obligation shall become void; otherwise it shall remain in full force and effect. IN THE EVENT the LA determines the PRINCIPAL has failed to enter into a formal contract in compliance with any requirements set forth in the preceding paragraph, then the LA acting through its awarding authority shall immediately be entitled to recover the full penal sum set out above, together with all court costs, all attorney fees, and any other expense of recovery. IN TESTIMONY WHEREOF, the said PRINCIPAL and the said SURETY have caused this instrument to be signed by their respective officers this day of Principal (Company Name) By: By: (Signature and Title) (Company Name) (Signature and Title) (If PRINCIPAL is a joint venture of two or more contractors, the company names, and authorized signatures of each contractor must be affixed.) S u rety By: (Name of Surety) STATE OF ILLINOIS, COUNTY OF 1. do hereby certify that (Signature of Attorney -in -Fact) , a Notary Public in and for said county, ( Insert names of individuals signing on behalf of PRINCIPAL & SURETY) who are each personally known to me to be the same persons whose names are subscribed to the foregoing instrument on behalf of PRINCIPAL and SURETY, appeared before me this day in person and acknowledged respectively, that they signed and delivered said instruments as their free and voluntary act for the uses and purposes therein set forth. Given under my hand and notarial seal this day of My commission expires (Notary Public) ELECTRONIC BID BOND ❑ Electronic bid bond is allowed (box must be checked by LA if electronic bid bond is allowed) The Principal may submit an electronic bid bond, in lieu of completing the above section of the Proposal Bid Bond Form. By providing an electronic bid bond ID code and signing below, the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the LA under the conditions of the bid bond as shown above. (If PRINCIPAL is a joint venture of two or more contractors, an electronic bid bond ID code, company/Bidder name title and date must be affixed for each contractor in the venture.) Electronic Bid Bond ID Code (Company/Bidder Name) (Signature and Title) Date Page 1 of 1 BLR 12230 (Rev. 7/05 Printed on 6/22/2018 10:07:55 AM Illinois Department of Transportation Bureau of Construction 2300 South Dirksen Parkway/Room 322 Springfield, Illinois 62764 Part I. Work Under Contract Affidavit of Availability For the Letting of 18 -00169 -00 -LT structions: Complete this form by either typing or using black ink. "Authorization to Bid" will not be issued iless both sides of this form are completed in detail. Use additional forms as needed to list all work. List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or rejected. In a joint venture, list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent engineer's or owners estimate, and must include work subcontracted to others. If no work is contracted, show NONE. 1 1 2 1 3 1 4 1 Awards Pendina Contract Number Contract With Estimated Completion Date Total Contract Price Uncompleted Dollar Value if Firm is the Prime Contractor Uncompleted Dollar Value if Firm is the Subcontractor Total Value of All Work Part II. Awards Pending and Uncompleted Work to be done with your own forces. Accumulated Totals List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated subcontracted to others will be listed on the reverse of this form. In a joint venture, list only that portion of the work to be done by your Totals company. If no work is contracted, show NONE. Earthwork Portland Cement Concrete Paving HMA Plant Mix HMA Paving Clean & Seal Cracks/Joints Aggregate Bases & Surfaces Highway, R. R. and Waterway Structures Drainage Electrical Cover and Seal Coats Concrete Construction Landscaping Fencing Guardrail Painting Signing Cold Milling, Planning & Rotomilling Demolition Pavement Markings (Paint) Other Construction (List) $ 0.00 Totals Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the "Illinois Procurement Code." Failure to comply will result in non -issuance of an "Authorization To Bid." This form has been approved by the State Forms Management Center. Printed 6/22/2018 Page 1 of 2 BC 57 (Rev. 08/17/10) Part III. Work Subcontracted to Others. For each contract described in Part I, list all the work you have subcontracted to others. I, being duly sworn, do hereby declare that this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates. Subscribed and sworn to before me this day of Type or Print Name Notary Public My commission expires (Notary Seal) Signed Company Address Officer or Director Title Printed 6/22/2018 Page 2 of 2 BC 57 (Rev. 08/17/10) 1 2 3 4 Awards Pending Subcontractor Type of Work Subcontract Price Amount Uncompleted Subcontractor Type of Work Subcontract Price Amount Uncompleted Subcontractor Type of Work Subcontract Price Amount Uncompleted Subcontractor Type of Work Subcontract Price Amount Uncompleted Subcontractor Type of Work Subcontract Price Amount Uncompleted Total Uncompleted I, being duly sworn, do hereby declare that this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates. Subscribed and sworn to before me this day of Type or Print Name Notary Public My commission expires (Notary Seal) Signed Company Address Officer or Director Title Printed 6/22/2018 Page 2 of 2 BC 57 (Rev. 08/17/10) Illinois Department of Transportation Return with Bid Apprenticeship or Training Program Certification Route —RividWliqids County••. SectionLocalAgency nn 1 .• nn All contractors are required to complete the following certification: ® For this contract proposal or for all groups in this deliver and install proposal. ❑ For the following deliver and install groups in this material proposal: Illinois Department of Transportation policy, adopted in accordance with the provisions of the Illinois Highway Code, requires this contract to be awarded to the lowest responsive and responsible bidder. The award decision is subject to approval by the Department. In addition to all other responsibility factors, this contract or deliver and install proposal requires all bidders and all bidders' subcontractors to disclose participation in apprenticeship or training programs that are (1) approved by and registered with the United States Department of Labor's Bureau of Apprenticeship and Training, and (2) applicable to the work of the above indicated proposals or groups. Therefore, all bidders are required to complete the following certification: Except as provided in paragraph IV below, the undersigned bidder certifies that it is a participant, either as an individual or as part of a group program, in an approved apprenticeship or training program applicable to each type of work or craft that the bidder will perform with its own employees. The undersigned bidder further certifies for work to be performed by subcontract that each of its subcontractors submitted for approval either (A) is, at the time of such bid, participating in an approved, applicable apprenticeship or training program; or (B) will, prior to commencement of performance of work pursuant to this contract, establish participation in an approved apprenticeship or training program applicable to the work of the subcontract. III. The undersigned bidder, by inclusion in the list in the space below, certifies the official name of each program sponsor holding the Certificate of Registration for all of the types of work or crafts in which the bidder is a participant and that will be performed with the bidder's employees. Types of work or craft that will be subcontracted shall be included and listed as subcontract work. The list shall also indicate any type of work or craft job category for which there is no applicable apprenticeship or training program available. Printed 6/22/2018 Page 1 of 2 BLR 12325 (Rev. 4/07) IV. Except for any work identified above, any bidder or subcontractor that shall perform all or part of the work of the contract or deliver and install proposal solely by individual owners, partners or members and not by employees to whom the payment of prevailing rates of wages would be required, check the following box, and identify the owner/operator workforce and positions of ownership. ❑ The requirements of this certification and disclosure are a material part of the contract, and the contractor shall require this certification provision to be included in all approved subcontracts. The bidder is responsible for making a complete report and shall make certain that each type of work or craft job category that will be utilized on the project is accounted for and listed. The Department at any time before or after award may require the production of a copy of each applicable Certificate of Registration issued by the United States Department of Labor evidencing such participation by the contractor and any or all of its subcontractors. In order to fulfill the participation requirement, it shall not be necessary that any applicable program sponsor be currently taking or that it will take applications for apprenticeship, training or employment during the performance of the work of this contract or deliver and install proposal. Bidder: Address: By: Title: (Signature) Printed 6/22/2018 Page 2 of 2 BLR 12325 (Rev. 4/07) Illinois Department of Transportation State of County of of RETURN WITH BID Affidavit of Illinois Business Office County Cook Local Public Agency Mount Prospect Section Number 18 -00169 -00 -LT Route Randview Highlands (Name of Affiant) (City of Affiant) (State of Affiant being first duly sworn upon oath, states as follows: 1. That I am the of officer or position bidder 2. That I have personal knowledge of the facts herein stated. 3. That, if selected under this proposal, will maintain a (bidder) business office in the State of Illinois which will be located in County, Illinois. 4. That this business office will serve as the primary place of employment for any persons employed in the construction contemplated by this proposal. 5. That this Affidavit is given as a requirement of state law as provided in Section 30-22(8) of the Illinois Procurement Code. This instrument was acknowledged before me on (SEAL) (Signature) (Print Name of Affiant) day of , (Signature of Notary Public) Printed 6/22/2018 BLR 12326 (01/08/14) NOTICE TO BIDDERS Bid for Randview Highlands Street Light Project Sealed bids will be received until 1:00 p.m. on August 20, 2018 in the office of the Village Manager, 3rd Floor, 50 S. Emerson Street, Mount Prospect, Illinois 60056. In a sealed envelope, please submit bid clearly marked: "Sealed Bid for Randview Highlands Street Light Project" The project consists of installing new street lights, conduit, cable, and a controller on Forest Avenue, Fairview Avenue, Prospect Manor Avenue, and Eastwood Avenue between Highland Street and Kensington Road in the Village of Mount Prospect, Illinois. Bid documents maybe obtained at the Village of Mount Prospect's website www.mountprospect.org/bids Questions regarding this project should be directed to Daniel Schug at Baxter & Woodman Inc., 815-459- 1260. All work under this Bid and the resulting contract shall comply with the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. and the other applicable laws and ordinances. Offers may not be withdrawn for a period of ninety (90) days after the bid date without the consent of the Board of Trustees. Any Bid submitted unsealed, unsigned, sent via email or fax or received subsequent to the aforementioned date and time, will be disqualified and returned to the bidder. The Village reserves the right in its sole discretion, to reject any and all bids or parts thereof, to waive any irregularities, technicalities, and informalities in bid procedures and to award the contract in a manner best serving the interests of the Village. Illinois Department of Transportation pre -qualification is required for this project. Village Manager Michael J. Cassady Interpretation Of Bid Documents. Any bidder in doubt as to the true meaning of any part of the Specifications or other bid documents shall submit a written request for interpretation to Village Engineer Jeffrey Wulbecker, P.E., no later than five (5) calendar days prior to the date set for the opening of the bid. Any questions received after that time may be answered at the discretion of the Village. In the event that the Village finds a question to be adequately addressed in the existing bidding documents, the question may be answered in writing by directing the requesting bidder to the applicable provision(s) in the existing bid documents. No further clarifications or interpretations will be issued. Bidders will acknowledge receipt of any addendum issued by so noting on the bid sheet. Oral explanations are not binding. Questions about this Request for Bids should be directed to: Daniel Schug Baxter & Woodman, Inc. 8678 Ridgefield Road Crystal Lake, IL 60012 Phone: 815-459-1260 Email: dschug@baxterwoodman.com GENERAL CONDITIONS 1. DEFINITION OF TERMS In these specifications and the accompanying documents, the several terms hereinafter defined shall be understood to mean as follows: The term "Award" shall mean the decision of the Village of Mount Prospect to accept the bid of the lowest responsible bidder for the work, subject to the execution and approval of a satisfactory contract therefore, and bond to secure the performance thereof, and to such other conditions as may be specified or otherwise required by law. The term "Bid" shall mean a formal written offer of a bidder to perform the proposed work in accordance with these specifications. The term "Bidder" shall mean any individual, firm, or corporation submitting a bid for the work contemplated. The phrase "Bid Documents" shall mean the Notice to Bidders, Table of Contents, Instructions to Bidders, General Conditions and Special Provisions, Specifications, Bid Form, Affidavit — Bid Certification Form, Bid Security, Bid Sheet, Other Materials or standards provided or noted by the Village, Contract, Performance Bond form, and Labor and Materials Payment Bond form. The term "Board" shall mean the Board of Trustees of the Village of Mount Prospect, Illinois. The term "CCDD" shall mean Clean Construction or Demolition Debris. The term, "Contract," shall mean the written agreement between the Village and the contractor, or between the owner and the contractor. The phrase "Contract Documents" shall mean the Bid Documents, bidder's submitted Bid Form, Bid Security, Bid Sheet, Contract and required bonds or letter of credit. The term "Contractor," as successful bidder, shall mean the individual, firm or corporation who shall have entered into an agreement or contract to furnish all necessary labor, equipment, tools and materials for the performance of the work under its bid and the Bid Documents. The phrase "Director of Public Works" shall mean the Director of Public Works representing the Village of Mount Prospect. The term "EPR" shall mean the Village's Engineering Project Representative. The phrase "Final Performance Date" shall mean the date that Substantial Performance and the punchlist items must be completed. The term "Inspector" shall mean the authorized representative of the Director of Public Works assigned to make detailed inspection of any or all portions of the work or materials therefore. The phrase "Notice of Award" shall mean the written notice of award of the contract given by the Village to the successful bidder. The phrase "Notice to Bidders" shall mean the official notice included in the bid inviting bids for the proposed improvements. The phrase "Notice to Proceed" shall mean the official notice to the contractor that will start the performance period. The phrase "Performance Period" shall mean the time allotted for contractor to perform the contract from start to Substantial Performance. The term "Owner" shall mean the Village of Mount Prospect. The phrases "Performance Bond" and "Labor and Material Payment Bond" and "Letter of Credit" shall mean the approved form of security furnished by the contractor and its financial institution as a guarantee that it will execute the work and pay all material providers and subcontractors. The terms "Plans" or "Contract Drawings" shall mean all official drawings or reproductions of drawings pertaining to the work provided in the contract. The phrase "Project Schedule" shall mean the critical path schedule submitted by Contractor to the Village, which includes targeted dates of completion through the Substantial Completion Date. The term "Punchlist" shall mean a list of items to be completed after Substantial Performance. The phrase "Special Provisions" shall mean any special directions and requirements prepared to cover the method or manner of performing work on a particular project, or cover the quantities or quality of the materials to be furnished under the contract which are not covered in the STANDARD SPECIFICATIONS. The special provisions included in the contract shall govern the work and take precedence over the general provisions and STANDARD SPECIFICATIONS noted above wherever they conflict therewith, but they shall not operate to annul those portions of the general provisions with which they are not in conflict. The term "Specifications" shall mean the general and special provisions, instructions and requirements contained herein, together with written agreements and all other executed documents which describe the method of performing the work, the quantities, or the quality of material to be furnished under the contract. Additionally, the term specifications will refer to standard practices as outlined in the Illinois Department of Transportation's "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (R&BC), latest revision and the "STANDARD SPECIFICATIONS FOR WATER AND SEWER MAIN CONSTRUCTION IN ILLINOIS" prepared by the ISPE, CECT, et al, latest revision. The term "Subcontractor" shall mean any individual, firm or corporation other than the contractor supplying labor, equipment, tools and materials for use in the work of the contract. The phrase "Substantial Performance" shall mean the date that the entire Project can be used for the purposes for which it was intended, i.e., only punchlist items remain. The phrase "Substantial Performance Date" shall mean the date that substantial performance must be completed. The term "Village" shall mean the Village of Mount Prospect, Illinois. The terms "Village Manager" or "Manager" shall mean the Village Manager of the Village of Mount Prospect, Illinois or his duly appointed representative. The terms "Work" and "Project" are used interchangeably and shall mean the improvement advertised for letting, described in the bid form, indicated on the plans, and covered in the specifications and contract, and authorized alterations, extensions and deductions, including labor, tools, equipment, materials and incidentals necessary for the satisfactory completion of the project. INDEX FOR SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS Adopted January 1, 2018 This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS. ERRATA Standard Specifications for Road and Bridge Construction (Adopted 4-1-16) (Revised 1-1-18) SUPPLEMENTAL SPECIFICATIONS Std. Spec. Sec. Page No. 106 Control of Materials.............................................................................. 1 403 Bituminous Surface Treatment (Class A-1, A-2, A-3) ........................... 2 404 Micro -Surfacing and Slurry Sealing ...................................................... 3 405 Cape Seal............................................................................................. 14 420 Portland Cement Concrete Pavement .................................................. 24 442 Pavement Patching.............................................................................. 26 502 Excavation for Structures..................................................................... 27 503 Concrete Structures............................................................................. 29 504 Precast Concrete Structures................................................................ 32 542 Pipe Culverts........................................................................................ 33 586 Sand Backfill for Vaulted Abutments .................................................... 34 630 Steel Plate Beam Guardrail.................................................................. 36 631 Traffic Barrier Terminals....................................................................... 39 670 Engineer's Field Office and Laboratory ................................................ 40 701 Work Zone Traffic Control and Protection ............................................ 41 704 Temporary Concrete Barrier................................................................. 42 781 Raised Reflective Pavement Markers .................................................. 44 888 Pedestrian Push-Button........................................................................ 45 1003 Fine Aggregates................................................................................... 46 1004 Coarse Aggregates.............................................................................. 47 1006 Metals................................................................................................... 50 1020 Portland Cement Concrete................................................................... 51 1050 Poured Joint Sealers............................................................................ 53 1069 Pole and Tower.................................................................................... 55 1077 Post and Foundation............................................................................ 56 1096 Pavement Markers............................................................................... 57 1101 General Equipment.............................................................................. 58 1102 Hot -Mix Asphalt Equipment.................................................................. 59 1103 Portland Cement Concrete Equipment ................................................. 61 1106 Work Zone Traffic Control Devices....................................................... 63 UT111n&=enl Check Sheet For Recurring ! �Special Provisions 0.4 The Following Recurring Special Provisions Indicated By An "X" Are Applicable To This Contract And Are Included By Reference: Recurring Special Provisions Check Sheet # Page No. 1 ❑ Additional State Requirements for Federal -Aid Construction Contracts 64 2 ❑ Subletting of Contracts (Federal -Aid Contracts) 67 3 ❑ EEO 68 4 ❑ Specific EEO Responsibilities Non Federal -Aid Contracts 78 5 ❑ Required Provisions - State Contracts 83 6 ❑ Asbestos Bearing Pad Removal 89 7 ❑ Asbestos Waterproofing Membrane and Asbestos Hot -Mix Asphalt Surface Removal 90 8 ❑ Temporary Stream Crossings and In -Stream Work Pads 91 9 ❑ Construction Layout Stakes Except for Bridges 92 10 ® Construction Layout Stakes 95 11 ❑ Use of Geotextile Fabric for Railroad Crossing 98 12 ❑ Subsealing of Concrete Pavements 100 13 ❑ Hot -Mix Asphalt Surface Correction 104 14 ❑ Pavement and Shoulder Resurfacing 106 15 ❑ Patching with Hot -Mix Asphalt Overlay Removal 107 16 ❑ Polymer Concrete 109 17 ❑ PVC Pipeliner 111 18 ❑ Bicycle Racks 112 19 ❑ Temporary Portable Bridge Traffic Signals 114 20 ❑ Work Zone Public Information Signs 116 21 ❑ Nighttime Inspection of Roadway Lighting 117 22 ❑ English Substitution of Metric Bolts 118 23 ❑ Calcium Chloride Accelerator for Portland Cement Concrete 119 24 ❑ Quality Control of Concrete Mixtures at the Plant 120 25 ❑ Quality Control/Quality Assurance of Concrete Mixtures 128 26 ❑ Digital Terrain Modeling for Earthwork Calculations 144 27 ❑ Reserved 146 28 ❑ Preventive Maintenance - Bituminous Surface Treatment 147 29 ❑ Reserved 153 30 ❑ Reserved 154 31 ❑ Reserved 155 32 ❑ Temporary Raised Pavement Markers 156 33 ❑ Restoring Bridge Approach Pavements Using High -Density Foam 157 34 ❑ Portland Cement Concrete Inlay or Overlay 160 35 ❑ Portland Cement Concrete Partial Depth Hot -Mix Asphalt Patching 164 Printed 05/02/18 Page 1 of 2 BLR 11300 (10/17/17) The Following Local Roads And Streets Recurring Special Provisions Indicated By An "X" Are Applicable To This Contract And Are Included By Reference: Local Roads And Streets Recurring Special Provisions Check Sheet # Page No. LRS 1 Reserved 168 LRS 2 ❑ Furnished Excavation 169 LRS 3 ® Work Zone Traffic Control Surveillance 170 LRS 4 ® Flaggers in Work Zones 171 LRS 5 ® Contract Claims 172 LRS 6 ® Bidding Requirements and Conditions for Contract Proposals 173 LRS 7 ❑ Bidding Requirements and Conditions for Material Proposals 179 LRS 8 Reserved 185 LRS 9 ❑ Bituminous Surface Treatments 186 LRS 10 Reserved 187 LRS 11 ® Employment Practices 188 LRS 12 ® Wages of Employees on Public Works 190 LRS 13 ® Selection of Labor 192 LRS 14 ❑ Paving Brick and Concrete Paver Pavements and Sidewalks 193 LRS 15 ® Partial Payments 196 LRS 16 ® Protests on Local Lettings 197 LRS 17 ® Substance Abuse Prevention Program 198 LRS 18 ❑ Multigrade Cold Mix Asphalt 199 Printed 05/02/18 BLR 11300 (10/17/17) INDEX OF SPECIAL PROVISIONS PAGE NO. LOCATIONOF PROJECT..........................................................................................................1 DESCRIPTION OF WORK.........................................................................................................1 MAINTENANCE OF ROADWAYS..............................................................................................1 STATUS OF UTILITIES(D-1).....................................................................................................1 MOBILIZATION..........................................................................................................................4 TRAFFIC CONTROL PLAN........................................................................................................5 GENERAL ELECTRICAL REQUIREMENTS..............................................................................5 ELECTRIC SERVICE INSTALLATION.......................................................................................9 ELECTRIC UTILITY SERVICE CONNECTION (COMED)........................................................10 LIGHT POLE, ALUMINUM........................................................................................................11 LUMINAIRE, LED.....................................................................................................................11 BREAKAWAY DEVICE, COUPLING WITH ALUMINUM SKIRT...............................................12 METAL HELIX FOUNDATION..................................................................................................12 UNDERGROUND RACEWAYS................................................................................................13 UNITDUCT..............................................................................................................................14 WIRE AND CABLE...................................................................................................................16 AS -BU I LTS...............................................................................................................................18 CCDD PROVISION SHOP DRAWING REVIEW COMPLETION DATE BDE SPECIAL PROVISIONS BLR SPECIAL PROVISIONS HIGHWAY STANDARDS Page 1 of 1 Special Provisions Village of Mount Prospect 180062 Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook SPECIAL PROVISIONS The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction", adopted April 1, 2016, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways", and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of the Village of Mount Prospect's street light installation, and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern. LOCATION OF PROJECT: The project is located on various streets in the Village of Mount Prospect, Cook County, Illinois. A location map is shown on the cover of the Plans. DESCRIPTION OF WORK: The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of light poles, foundations, conduit, wiring, controller; and other incidental and miscellaneous items of work in accordance with the Plans, Standard Specifications, and these Special Provisions. MAINTENANCE OF ROADWAYS: Effective: September 30, 1985 Revised: November 1, 1996 Beginning on the date that work begins on this project, the Contractor shall assume responsibility for normal maintenance of all existing roadways within the limits of the improvement. This normal maintenance shall include all repair work deemed necessary by the Engineer, but shall not include snow removal operations. Traffic control and protection for maintenance of roadways will be provided by the Contractor as required by the Engineer. If items of work have not been provided in the contract, or otherwise specified for payment, such items, including the accompanying traffic control and protection required by the Engineer, will be paid for in accordance with Article 109.04 of the Standard Specifications. STATUS OF UTILITIES (D-1): Effective: June 1, 2016 Conflicts noted below have been identified by following the suggested staging plan included in the contract. The company has been notified of all conflicts and will be required to obtain the - 1 - Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook necessary permits to complete their work; in some instances resolution will be a function of the construction staging. The responsible agency must relocate or complete new installations as noted in the action column; this work has been deemed necessary to be complete for the Department's contractor to then work in the stage under which the item has been listed. Pre -Stage STAGE / TYPE DESCRIPTION RESPONSIBLE ACTION LOCATION Cable AGENCY No conflict None Telephone No conflicts Various Electric Gas See Plans for more See Below anticipated UTILITIES TO BE WATCHED AND PROTECTED The areas of concern noted below have been identified by following the suggested staging plan included for the contract. The information provided is not a comprehensive list of all remaining utilities, but those which during coordination were identified as ones which might require the Department's contractor to take into consideration when making the determination of the means and methods that would be required to construct the proposed improvement. In some instances the contractor will be responsible to notify the owner in advance of the work to take place so necessary staffing on the owners part can be secured. Pre -Stage STAGE / LOCATION TYPE DESCRIPTION OWNER ACTION Cable No conflict Telephone anticipated. Utility Various Electric Gas See Plans for more See Below review ongoing. Fiber information Contractor shall Sanitary watch and protect all Water facilities The following contact information is what was used during the preparation of the plans as provided by the owner of the facility. -2- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook Agency/Company Name of Address Phone e-mail address Responsible to contact Resolve Conflict Wide Open West Paul 630-536- Paul.flinkow@wowinc.com Flinkow 3139 AT&T Transmission Kenneth 210-368- kc1298@att.com Colwell 8099 AT&T Distribution Donna 630-573- ds2674@att.com Szpytek 5530 ComEd Eric Jostes 630-437- eric.jostes@comed.com 2927 Comcast Martha 224-229- Martha_Gieras@cable.comcast.com Gieras 5862 Level Xan 720-888- Xan.Rypkema@level3.com Communications Rykema 1089 Crown Castle David Antol David.Antol@crowncastle.com IL-AMER WATER- RAY 630-739- raymond.fowler@AMWATER.COM CHICAGO METRO FOWLER 8819 MCI (Verizon) Dean 972-729- Dean.Boyers@Verizon.com Boyers 6322 Zayo Fiber Solutions Tim 630-203- timpayment@zayo.com Payment 8003 MWRD Joe 312-751- joseph.schuessler@mwrd.org Schuessler 3184 Nicor Bruce 630-388- bkoppan@aglresources.com Koppang 3046 REDSPEED JOSE 630-317- JOSE.CHAVEZ@REDSPEED- ILLINOIS, LLC CHAVEZ 5705 ILLINOIS.COM AT&T TCG (AT&T Bobby 630-810- BA3817@att.com LNS) Akhter 6274 -3- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook G4S TECHNOLOGY DOUG 630-343- douglas.gones@usa.g4s.com LLC GONES 2826 N.W.SUB.MUNIC.J- RONALD L. 773-686- rbaker@nsmjawa.com ACTION WATER BAKER 0077 WINDSTREAM Jean (800) Jean.Lander@windstream.com KDL/MCLEOD USA Lander 289-1901 UNITE PRIVATE GEORGE 478-832- GEORGE.FORBES@upnfiber.com NETWORK FORBES 0669 VINAKOM DICKY 847-592- DICKY.PATEL@VlNAKOM.COM COMMUNICATIONS PATEL 5785 The above represents the best information available to the Department and is included for the convenience of the bidder. The days required for conflict resolution should be taken into account in the bid as this information has also been factored into the timeline identified for the project when setting the completion date. The applicable portions of the Standard Specifications for Road and Bridge Construction shall apply. Estimated duration of time provided in the action column for the first conflicts identified will begin on the date of the executed contract regardless of the status of the utility relocations. The responsible agencies will be working toward resolving subsequent conflicts in conjunction with contractor activities in the number of days noted. The estimated relocation dates must be part of the progress schedule submitted by the contractor. A utility kickoff meeting will be scheduled between the Department, the Department's contractor and the utility companies. The Department's contractor is responsible for contacting J.U.L.I.E. prior to any and all excavation work. MOBILIZATION: This work shall be done in accordance with Section 671 of the Standard Specifications except as modified herein. 671.02 Basis of Payment. Revise this article to read: "671.02 Basis of Payment. Mobilization will not be paid for separately but rather shall be included in the cost of the items for which this work applies." Special Provisions 180062 TRAFFIC CONTROL PLAN: Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook This work shall be done in accordance with applicable portions of Section 701 of the Standard Specifications, the Supplemental Specifications, the "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways", and any details and Highway Standards contained in the Plans and Special Provisions, and the Special Provisions contained herein, except as modified herein. Special Attention is called to Article 107.09 of the Standard Specifications and the following Highway Standards, Details, Recurring Local Roads and Streets Special Provisions, and Special Provisions contained herein, relating to traffic control. HIGHWAY STANDARDS: 701006, 701301, 701501, 701701, 701801, 701901 DETAILS: SPECIAL PROVISIONS (Included in these Special Provisions): Maintenance of Roadways Work Zone Traffic Control Surveillance (LRS 3) Flaggers in Work Zones (LRS 4) The Contractor shall contact the Village at least 72 hours in advance of beginning work. Construction operations shall be conducted in a manner such that streets will be open to emergency traffic and accessible as required to local traffic. Advanced notice shall be provided to residents, police, fire, school districts and trash haulers when access to any street will be temporarily closed or limited. Removal and replacement of curb and gutter and driveways shall be planned so as to cause a minimum of inconvenience to the abutting property owners. The work shall be accomplished such that the streets will be left open to local traffic at the end of each working day. Unless otherwise indicated in Section 701, the above standards, details and special provisions shall be considered included in the contract. GENERAL ELECTRICAL REQUIREMENTS Effective: January 1, 2012 General. Before performing any excavation, removal, or installation work (electrical or otherwise) at the site, the Contractor shall request a maintenance transfer and preconstruction site inspection, to be held in the presence of the Engineer and a representative of the party or -5- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook parties responsible for maintenance of any lighting and/or traffic control systems which may be affected by the work. The request for the maintenance transfer and preconstruction inspection shall be made no less than seven (7) calendar days prior to the desired inspection date. The maintenance transfer and preconstruction inspection shall: Establish the procedures for formal transfer of maintenance responsibility required for the construction period. Establish the approximate location and operating condition of lighting and/or traffic control systems which may be affected by the work Marking of Existing Cable Systems. The party responsible for maintenance of any existing lighting and/or traffic control systems at the project site will, at the Contractor's request, mark and/or stake, once per location, all underground cable routes owned or maintained by the State. A project may involve multiple "locations" where separated electrical systems are involved (i.e. different controllers). The markings shall be taken to have a horizontal tolerance of at least 304.8 mm (one (1) foot) to either side. The request for the cable locations and marking shall be made at the same time the request for the maintenance transfer and preconstruction inspection is made. The Contractor shall exercise extreme caution where existing buried cable runs are involved. The markings of existing systems are made strictly for assistance to the Contractor and this does not relieve the Contractor of responsibility for the repair or replacement of any cable run damaged in the course of his work, as specified elsewhere herein. Note that the contractor shall be entitled to only one request for location marking of existing systems and that multiple requests may only be honored at the contractor's expense. No locates will be made after maintenance is transferred, unless it is at the contractor's expense. Condition of Existing Systems. The Contractor shall conduct an inventory of all existing electrical system equipment within the project limits, which may be affected by the work, making note of any parts which are found broken or missing, defective or malfunctioning. Megger and load readings shall be taken for all existing circuits which will remain in place or be modified. If a circuit is to be taken out in its entirety, then readings do not have to be taken. The inventory and test data shall be reviewed with and approved by the Engineer and a record of the inventory shall be submitted to the Engineer for the record. Without such a record, all systems transferred to the Contractor for maintenance during construction shall be returned at the end of construction in complete, fully operating condition." Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook Lighting Operation and Maintenance Responsibility. The scope of work shall include the assumption of responsibility for the continuing operation and maintenance the of existing, proposed, temporary, sign and navigation lighting, or other lighting systems and all appurtenances affected by the work as specified elsewhere herein. Maintenance of lighting systems is specified elsewhere and will be paid for separately Safety and Protection. Electrical systems shall not be left in an exposed or otherwise hazardous condition. All electrical boxes, cabinets, pole handholes, etc. which contain wiring, either energized or non -energized, shall be closed or shall have covers in place and be locked when possible, during nonworking hours. Electrical raceway or duct openings shall be capped or otherwise sealed from the entrance of water and dirt. Wiring shall be protected from mechanical injury. Standards of Installation. Materials shall be installed according to the manufacturer's recommendations, the NEC, OSHA, the NESC, and AASHTO's Standard Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals. Submittals. At the preconstruction meeting, the Contractor shall submit a written listing of manufacturers for all major electrical and mechanical items. The list of manufacturers shall be binding, except by written request from the Contractor and approval by the Engineer. The request shall include acceptable reasons and documentation for the change. Major items shall include, but not limited to the following: Type of Work Item (discipline) All Electrical Work Electric Service Metering Emergency Standby System Transformers 7- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook Testing. Before final inspection, the electrical work shall be tested. Tests may be made progressively as parts of the work are completed, or may be made when the work is complete. Tests shall be made in the presence of the Engineer. Items which fail to test satisfactorily shall be repaired or replaced. Tests shall include checks of control operation, system voltages, cable insulation, and ground resistance and continuity. The forms for recording test readings will be available from the Engineer in electronic format. The Contractor shall provide the Engineer with a written report of all test data including the following: • Voltage Tests • Amperage Tests • Insulation Resistance Tests • Continuity tests • Detector Loop Tests Lighting Systems. The following tests shall be made: (1) Voltage Measurements. Voltages in the cabinet from phase to phase and phase to neutral, at no load and at full load, shall be measured and recorded. Voltage readings at the last termination of each circuit shall be measured and recorded. (2) Insulation Resistance. Insulation resistance to ground of each circuit at the cabinet, with all loads connected, shall be measured and recorded. Cable Unit Duct Splices Conduit Surge Suppression System Lighting Tower Pole Luminaire Foundation Breakaway Device Controllers Control Cabinet and Peripherals Testing. Before final inspection, the electrical work shall be tested. Tests may be made progressively as parts of the work are completed, or may be made when the work is complete. Tests shall be made in the presence of the Engineer. Items which fail to test satisfactorily shall be repaired or replaced. Tests shall include checks of control operation, system voltages, cable insulation, and ground resistance and continuity. The forms for recording test readings will be available from the Engineer in electronic format. The Contractor shall provide the Engineer with a written report of all test data including the following: • Voltage Tests • Amperage Tests • Insulation Resistance Tests • Continuity tests • Detector Loop Tests Lighting Systems. The following tests shall be made: (1) Voltage Measurements. Voltages in the cabinet from phase to phase and phase to neutral, at no load and at full load, shall be measured and recorded. Voltage readings at the last termination of each circuit shall be measured and recorded. (2) Insulation Resistance. Insulation resistance to ground of each circuit at the cabinet, with all loads connected, shall be measured and recorded. Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook On tests of new cable runs, the readings shall exceed 50 megohms for phase and neutral conductors with a connected load over 20 A, and shall exceed 100 megohms for conductors with a connected load of 20 A or less. On tests of cable runs which include cables which were existing in service prior to this contract, the resistance readings shall be the same or better than the readings recorded at the maintenance transfer at the beginning of the contract. Measurements shall be taken with a megohm meter approved by the Engineer. (3) Loads. The current of each circuit, phase main, and neutral shall be measured and recorded. The Engineer may direct reasonable circuit rearrangement. The current readings shall be within ten percent of the connected load based on material ratings. (4) Ground Continuity. Resistance of the system ground as taken from the farthest extension of each circuit run from the controller (i.e. check of equipment ground continuity for each circuit) shall be measured and recorded. Readings shall not exceed 2.0 ohms, regardless of the length of the circuit. (5) Resistance of Grounding Electrodes. Resistance to ground of all grounding electrodes shall be measured and recorded. Measurements shall be made with a ground tester during dry soil conditions as approved by the Engineer. Resistance to ground shall not exceed 10 ohms. ELECTRIC SERVICE INSTALLATION Effective: January 1, 2012 Description. This item shall consist of all material and labor required to extend, connect or modify the electric services, as indicated or specified, which is over and above the work performed by the utility. Unless otherwise indicated, the cost for the utility work, if any, will be reimbursed to the Contractor separately under ELECTRIC UTILITY SERVICE CONNECTION. This item may apply to the work at more than one service location and each will be paid separately. Materials. Materials shall be in accordance with the Standard Specifications. CONSTRUCTION REQUIREMENTS General. The Contractor shall ascertain the work being provided by the electric utility and shall provide all additional material and work not included by other contract pay items required to complete the electric service work in complete compliance with the requirements of the utility. Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook No additional compensation will be allowed for work required for the electric service, even though not explicitly shown on the Drawings or specified herein Method Of Measurement. Electric Service Installation shall be counted, each. Basis Of Payment. This work will be paid for at the contract unit price each for ELECTRIC SERVICE INSTALLATION, which shall be payment in full for the work, specified herein. ELECTRIC UTILITY SERVICE CONNECTION (COMED Description. This item shall consist of payment for work performed by ComEd in providing or modifying electric service as indicated. THIS MAY INVOLVE WORK AT MORE THAN ONE ELECTRIC SERVICE. For summary of the Electrical Service Drop Locations see the schedule contained elsewhere herein. CONSTRUCTION REQUIREMENTS General. It shall be the Contractor's responsibility to contact ComEd. The Contractor shall coordinate his work fully with the ComEd both as to the work required and the timing of the installation. No additional compensation will be granted under this or any other item for extra work caused by failure to meet this requirement. Contact information for ComEd; Christine Leftwich 630-424-5124 Christi ne.leftwich@comed.com The Contractor should make particular note of the need for the earliest attention to arrangements with ComEd for service. In the event of delay by ComEd, no extension of time will be considered applicable for the delay unless the Contractor can produce written evidence of a request for electric service within 30 days of execution. Method Of Payment. The Contractor will be reimbursed to the exact amount of money as billed by ComEd for its services. Work provided by the Contractor for electric service will be paid separately as described under ELECTRIC SERVICE INSTALLATION. No extra compensation shall be paid to the Contractor for any incidental materials and labor required to fulfill the requirements as shown on the plans and specified herein. For bidding purposes, this item shall be estimated as $5,000.00 -10- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook Basis Of Payment. This work will be paid for at the contract lump sum price for ELECTRIC UTILITY SERVICE CONNECTION which shall be reimbursement in full for electric utility service charges. LIGHT POLE, ALUMINUM Description. This work shall consist of providing and installing light poles. This work shall include equipment, hardware, assembly, wiring, mounting, testing, grounding, labor and other miscellaneous work necessary to for complete fully operational installation of the light poles. This work shall be done in accordance with Sections 830 of the Standard Specifications insofar as applicable. Materials. The following materials comprise the light pole assembly. Light Poles: Round tapered aluminum pole with 10' mast arm as manufactured by HAPCO Pole Products to accommodate the LUMINAIRE, LED, HORIZONTAL MOUNT at 25' M.H. as detailed in the plans. Catalog Number: RTA25C7B4T1A-01 Finish: Factory satin aluminum finish. Wiring: Pole wiring shall be color -coded Type XLP-USE, 600V insulation, 90 degrees C, 1/C #10 stranded copper. Fuse holder: Bussmann HEX -A W-DRCLA. Method of Measurement. This work will be measured for payment per each fully -assembled and operational lighting pole installed. Basis of Payment. This work will be paid for at the contract unit price per each for LIGHT POLE, ALUMINUM of the type and size shown in the plan set. LUMINAIRE, LED Description. This work shall consist of providing and installing horizontal mount LED luminaires. This work shall include equipment, hardware, assembly, wiring, mounting, testing, grounding, labor and other miscellaneous work necessary to for complete fully operational installation of the LED luminaires. This work shall be done in accordance with Sections 821 of the Standard Specifications insofar as applicable. -11- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook Materials. The following materials comprise the luminaire. Luminaire: LEOTEK Lite -On Group, Green Cobra Series (Catalog number GCM2-40H-MV-WW- 2R-GY-700-LPCR-WL) 88 watt, multi -volt compatible, 3000K color temperature, 700mA drive current, with utility wattage label. Finish: Factory gray finish. Basis of Payment. This work will be paid for at the contract unit price per each for LUMINAIRE, LED, HORIZONTAL MOUNT, of the TYPE indicated. BREAKAWAY DEVICE, COUPLING WITH ALUMINUM SKIRT Description. This work shall be performed in accordance with Section 838 of the Standard Specifications insofar as applicable and as detailed on the Plans. Breakaway couplings, wire cloth, and aluminum pole base skirt shall be provided and installed per Highway Standard 838001. Method of Measurement. This work will be measured for payment per each fully -assembled and operational lighting unit installed. Basis of Payment. This work shall be paid for at the contract unit price per each for BREAKAWAY DEVICE, COUPLING WITH ALUMINUM SKIRT. Price shall be payment in full for all labor, materials, equipment and incidental expenses as necessary to complete this work as specified and as indicated on the Plans. METAL HELIX FOUNDATION Description. This work shall be performed in accordance with Section 836 of the Standard Specifications insofar as applicable and as detailed on the Plans. Contractor is responsible for installation of foundations and coordinating with other trades and aspects of the project. -12- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook Foundation shall be as detailed in the plan set. Baseplate size and bolt circle diameter must be sufficient to accommodate the mounting configuration of the actual lighting unit being provided. Restoration of the work area shall be included in the cost of this item. All damage as determined by the Village or its representative shall be replaced without dispute. Restoration by seeding in accordance with Article 250 or sod in accordance with Article 252 shall be at the Village's sole discretion. Any restored area that does not survive without meeting specifications as determined by the Village or its representative shall be replaced by the contractor at no additional compensation. Method of Measurement. This work will be measured for payment per each fully -assembled and operational lighting unit installed. Basis of Payment. This work shall be paid for at the contract unit price per each for METAL HELIX FOUNDATION. Price shall be payment in full for all labor, materials, equipment and incidental expenses as necessary to complete this work as specified and as indicated on the Plans. UNDERGROUND RACEWAYS Revise Article 810.04 of the Standard Specifications to read: "Installation. All underground conduits shall have a minimum depth of 30 -inches (700 mm) below the finished grade." Add the following to Article 810.04 of the Standard Specifications: "All metal conduit installed underground shall be Rigid Steel Conduit unless otherwise indicated on the plans." Add the following to Article 810.04 of the Standard Specifications: "All raceways which extend outside of a structure or duct bank but are not terminated in a cabinet, junction box, pull box, handhole, post, pole, or pedestal shall extend a minimum or 300 mm (12") or the length shown on the plans beyond the structure or duct bank. The end of this extension shall be capped and sealed with a cap designed for the conduit to be capped. The ends of rigid metal conduit to be capped shall be threaded, the threads -13- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook protected with full galvanizing, and capped with a threaded galvanized steel cap. The ends of rigid nonmetallic conduit and coilable nonmetallic conduit shall be capped with a rigid PVC cap of not less than 3 mm (0.125") thick. The cap shall be sealed to the conduit using a room -temperature -vulcanizing (RTV) sealant compatible with the material of both the cap and the conduit. A washer or similar metal ring shall be glued to the inside center of the cap with epoxy, and the pull cord shall be tied to this ring." Description. Conduits for this project shall be installed by boring and pulling as described in Article 810 of the Standard Specifications. Installation by trenching shall not be used. Sizes shall be as shown on the plans. Restoration of the work area shall be included in the cost of this item. All damage as determined by the Village or its representative shall be replaced without dispute. Restoration by seeding in accordance with Article 250 or sod in accordance with Article 252 shall be at the Village's sole discretion. Any restored area that does not survive without meeting specifications as determined by the Village or its representative shall be replaced by the contractor at no additional compensation. Method of Measurement. This work will be measured for payment in feet in place. Measurement will be made in accordance with Article 810.06. Basis of Payment. This work shall be paid for at the contract unit price per foot for UNDERGROUND CONDUIT, of the type and size indicated on the Plans. Price shall be payment in full for all labor, materials, equipment and incidental expenses as necessary to complete this work as specified and as indicated on the Plans. UNIT DUCT Revise the first paragraph of Article 810.04 to read: "The unit duct shall be installed at a minimum depth of 30 -inches (760 mm) unless otherwise directed by the Engineer." Revise Article 1088.01(c) to read: "(c) Coilable Nonmetallic Conduit. General: -14- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook The duct shall be a plastic duct which is intended for underground use and which can be manufactured and coiled or reeled in continuous transportable lengths and uncoiled for further processing and/or installation without adversely affecting its properties of performance. The duct shall be a plastic duct which is intended for underground use and can be manufactured and coiled or reeled in continuous transportable lengths and uncoiled for further processing and/or installation without adversely affecting its properties of performance. The duct shall be made of high density polyethylene which shall meet the requirements of ASTM D 2447, for schedule 40. The duct shall be composed of black high density polyethylene meeting the requirements of ASTM D 3350, Class C, Grade P33. The wall thickness shall be in accordance with Table 2 for ASTM D 2447. The duct shall be UL Listed per 651-B for continuous length HDPE coiled conduit. The duct shall also comply with NEC Article 354.100 and 354.120. Submittal information shall demonstrate compliance with the details of these requirements. Dimensions: Duct dimensions shall conform to the standards listed in ASTM D2447. Submittal information shall demonstrate compliance with these requirements. Nominal Size Nominal I.D. Nominal O.D. Minimum Wall mm I in mm in mm I in mm in 31.75 1.25 35.05 1.380 42.16 1 1.660 1 3.556 +0.51 1 0.140 +0.020 38.1 1 1.50 40.89 1.610 48.26 1 1.900 1 3.683 +0.51 1 0.145 +0.020 Nominal Size Pulled Tensile mm in N Ibs 31.75 1 1.25 3322 747 38.1 1 1.50 3972 893 Marking: As specified in NEMA Standard Publication No. TC -7, the duct shall be clearly and durably marked at least every 3.05 meters (10 feet) with the material designation (HDPE for high density polyethylene), nominal size of the duct and the name and/or trademark of the manufacturer. Performance Tests: -15- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook Polyethylene Duct testing procedures and test results shall meet the requirements of UL 651. Certified copies of the test report shall be submitted to the Engineer prior to the installation of the duct. Duct crush test results shall meet or exceed the following requirements: Duct Min. force required to Diameter deform sample 50% MM in N lbs 35 1.25 4937 1110 41 1.5 4559 1025 Description. Unit Duct for this project shall be installed by boring and pulling as described in Article 816 of the Standard Specifications. Installation by trenching shall not be used. Sizes shall be as shown on the plans. Restoration of the work area shall be included in the cost of this item. All damage as determined by the Village or its representative shall be replaced without dispute. Restoration by seeding in accordance with Article 250 or sod in accordance with Article 252 shall be at the Village's sole discretion. Any restored area that does not survive without meeting specifications as determined by the Village or its representative shall be replaced by the contractor at no additional compensation. Method of Measurement. This work will be measured for payment in feet in place. Measurement will be made in accordance with Article 816. Basis of Payment. This work shall be paid for at the contract unit price per foot for UNIT DUCT, 600V, of the type and size indicated on the Plans. Price shall be payment in full for all labor, materials, equipment and incidental expenses as necessary to complete this work as specified and as indicated on the Plans. WIRE AND CABLE Effective: January 1, 2012 Add the following to the first paragraph of Article 1066.02(a): "The cable shall be rated at a minimum of 90°C dry and 75°C wet and shall be suitable for installation in wet and dry locations, and shall be resistant to oils and chemicals." -16- Special Provisions 180062 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook Revise the Aerial Electric Cable Properties table of Article 1066.03(a)(3) to read: Aerial Electric Cable Properties Phase Conductor Messenger wire Size AWG Stranding Average Insulation Thickness Minimum Size AWG Stranding MITI mils 6 7 1.1 45 6 6/1 4 7 1.1 45 4 6/1 2 7 1.1 45 2 6/1 1/0 19 1.5 60 1/0 6/1 2/0 19 1.5 60 2/0 6/1 3/0 19 1.5 60 3/0 6/1 4/0 19 1.5 60 4/0 6/1 Add the following to Article 1066.03(b) of the Standard Specifications: "Cable sized No. 2 AWG and smaller shall be U.L. listed Type RHH/RHW and may be Type RHH/RHW/USE. Cable sized larger than No. 2 AWG shall be U.L. listed Type RHH/RHW/USE." Revise Article 1066.04 to read: "Aerial Cable Assembly. The aerial cable shall be an assembly of insulated aluminum conductors according to Section 1066.02 and 1066.03. Unless otherwise indicated, the cable assembly shall be composed of three insulated conductors and a steel reinforced bare aluminum conductor (ACSR) to be used as the ground conductor. Unless otherwise indicated, the code word designation of this cable assembly is "Palomino". The steel reinforced aluminum conductor shall conform to ASTM B-232. The cable shall be assembled according to ANSI/ICEA S-76-474." Revise the second paragraph of Article 1066.05 to read: "The tape shall have reinforced metallic detection capabilities consisting of a woven reinforced polyethylene tape with a metallic core or backing." -17- Special Provisions 180062 AS-BUILTS Effective: January 1, 2012 Village of Mount Prospect Randview Highlands Street Lighting Project Section No.: 1 8 -00169 -00 -LT County: Cook The contractor shall provide as -built locations for all conduit and unit duct at 50 foot intervals along each street. Method of Measurement. This work will not be measured for payment. (SAN) 6/20/2018 I:\Crystal Lake\MTPRO\180062-Randview St Light\40-Design\Special Provisions\Special Provisions.docx -18- CLEAN CONSTRUCTION OR DEMOLITION DEBRIS (CCDD) The Contractor shall only be responsible for the disposal of clean construction debris. The Contractor shall prepare all bid pricing based on the assumption that all excavations and associated debris will comply with the clean construction debris disposal requirements and that the debris can and will be disposed of at any clean debris landfill. The Village or its CCDD consultant will prepare all Source Site Certification by Owner or Operator forms (or LPC -662 manifests) for each location and for each date of excavation during this project. These forms will be provided to the Contractor by the engineering project representative or (EPR). The Contractor shall acquire one manifest for each load as outlined in the state regulations and shall be responsible for only the costs of disposal of clean construction debris. SUSPECT DEBRIS The Contractor shall only be responsible for the disposal of any and all clean construction debris. If the Contractor, for whatever reason, suspects that an excavation, debris load, or any portion thereof, may contain non -clean construction debris, then he shall immediately notify the Village or the EPR. The Public Works Department can be reached at 847-870-5640. If the Village or EPR agree that the material is suspect then the Contractor shall set aside that suspect load or portion thereof on site or at a holding area identified by the Village. The Contractor shall at that time be no longer responsible for the disposal of that load or portion thereof. The Village and its CCDD consultant will become responsible for the testing and subsequent disposal of all suspect debris. SP -8 SHOP DRAWINGS AND CATALOG CUTS The Contractor shall submit to the Village and the Engineer for approval electronic shop drawings and catalog cuts of the lighting items including: Electric Service Installation Cables Splices Fuses Conduits Lighting Controller, Base Mounted, 240Volt, 100 Amp Light Standard, Aluminum, 25 Ft. M.H., 10 Ft. Clamp -on Mast Arm, 88W LED Breakaway Devices with Aluminum Skirt Light Pole Foundation, Metal, 11" Bolt Circle, 8" X 6' no later than seven (7) days after the award of the contract. The electronic submittals shall be made to the Village, miawrie@mountprospect.org and the Engineer, dschug@baxterwoodman.com. The Village and the Engineer will review the submittal and notify the Contractor no later than 14 days after the award of the contract if the shop drawings and catalog cuts are acceptable. If the Contractor wishes to speed up the review process, the shop drawings and catalog cuts can be submitted with the Proposal. The Contractor shall order the materials as soon as approval is received from the Village to assure timely delivery. No extension of time will be granted because the materials have not been delivered. SP -9 COMPLETION DATE (VIA CALENDAR DAYS) PLUS WORKING DAYS (BDE) Effective: April 1, 2008 The Contractor shall complete all work on or before the completion date of this contract which will be based upon 100 calendar days. After the completion date, an additional 15 working days will be allowed to complete punch.list items. The completion date will be determined by adding the specified number of calendar days to the date the Contractor begins work, or to the date ten days after execution of the contract, whichever is the earlier, unless a delayed start is granted by the Engineer. 80199 SP -26 BDE SPECIAL PROVISIONS For the August 3 and September 21, 2018 Lettings The following special provisions indicated by an "x" are applicable to this contract and will be included by the Project Development and Implementation Section of the BD&E. An * indicates a new or revised special provision for the letting. File Name 80099 80382 80274 80192 80173 80241 50261 50481 50491 50531 80366 80386 80396 80384 80198 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 80199 16 80293 17 80311 18 80277 19 80261 20 80387 21 Special Provision Title Accessible Pedestrian Signals (APS) Adjusting Frames and Grates Aggregate Subgrade Improvement Automated Flagger Assistance Device Bituminous Materials Cost Adjustments Bridge Demolition Debris Building Removal -Case I (Non -Friable and Friable Asbestos) Building Removal -Case II (Non -Friable Asbestos) Building Removal -Case III (Friable Asbestos) Building Removal -Case IV (No Asbestos) Butt Joints Calcium Aluminate Cement for Class PP -5 Concrete Patching Class A and B Patching Compensable Delay Costs Completion Date (via calendar days) Completion Date (via calendar days) Plus Working Days Concrete Box Culverts with Skews > 30 Degrees and Design Fills <_ 5 Feet Concrete End Sections for Pipe Culverts Concrete Mix Design - Department Provided Construction Air Quality - Diesel Retrofit Contrast Preformed Plastic Pavement Markinq Effective April 1, 2003 April 1, 2017 April 1, 2012 Jan. 1, 2008 Nov. 2, 2006 July 1, 2009 Sept. 1, 1990 Sept. 1, 1990 Sept. 1, 1990 Sept. 1, 1990 July 1, 2016 Nov. 1, 2017 Jan. 1, 2018 June 2, 2017 April 1, 2008 April 1, 2008 April 1, 2012 Revised Jan. 1, 2014 April 1, 2016 Aug. 1, 2017 April 1, 2010 April 1, 2010 April 1, 2010 April 1, 2010 July 1, 2016 Jan. 1, 2013 April 1, 2016 Jan. 1, 2012 April 1, 2016 June 1, 2010 Nov. 1, 2014 Nov. 1, 2017 80378 23Dowel 80388 24 80229 25 80304 26 Bar Inserter Jan. 1, 2017 Equipment Parking and Storage Nov. 1, 2017 Fuel Cost Adjustment April 1, 2009 Groovina for Recessed Pavement Markinas Nov. 1. 2012 ✓ 80383 31 80376 32 80392 33 80336 34 80045 37 80394 38 80165 39 80349 40 80371 41 80390 42 80377 43 80389 44 80359 45 Hot -Mix Asphalt - Quality Control for Performance April 1, 2017 Hot -Mix Asphalt - Tack Coat Nov. 1, 2016 Lights on Barricades Jan. 1, 2018 1, 2014 Lon itudinal Joint and Crack Patchin A ril 2014 Norm/21,migal, rrt-, , Material Transfer Device June 15, 1999 Metal Flared End Section for Pipe Culverts Jan. 1, 2018 Moisture Cured Urethane Paint System Nov. 1, 2006 Pavement Marking Blackout Tape Nov. 1, 2014 Pavement Marking Removal July 1, 2016 Payments to Subcontractors Nov. 2, 2017 Portable Changeable Message Signs Nov. 1, 2016 Portland Cement Concrete Nov. 1, 2017 Portland Cement Concrete Bridae Deck Curina April 1. 2015 ✓ ✓ ✓ Jan. 1, 2018 Aug. 1, 2017 Nov. 1. 2017 Nov. 1, 2017 Wil 1, 2016 NIMNIN 1111 r 1011 Aug. 1, 2014 April 1, 2018 Jan. 1, 2010 April 1, 2016 April 1, 2017 1►[.I�i���Zrl 80385 47 New Location Effective Portland Cement Concrete Sidewalk Aug. 1, 2017 80300 48 80369 Mast Arm Assembly and Pole Preformed Plastic Pavement Marking Type D - Inlaid April 1, 2012 80328 49 Recurring CS #35 April 1, 2014 Progress Payments Nov. 2, 2013 34261 50 80379 Steel Plate Beam Guardrail Railroad Protective Liability Insurance Dec. 1, 1986 80157 51 630.06, and 630.08 Railroad Protective Liability Insurance (5 and 10) Jan. 1, 2006 80306 52 80380 Tubular Markers Reclaimed Asphalt Pavement (RAP) and Reclaimed Asphalt Shingles Nov. 1, 2012 701.18, and 1106.02 (RAS) 80395 53 Sloped Metal End Section for Pipe Culverts Jan. 1, 2018 80340 54 Speed Display Trailer April 2, 2014 80127 55 Steel Cost Ad ustment A n 2, 2004 rr i�i�io, rii araarairair iaiaro �,,,i�ir air , �„ r -, 80391 57 Subcontractor Mobilization Payments Nov. 2, 2017 80317 58 Surface Testing of Hot-Mix Asphalt Overlays Jan. 1, 2013 80298 59 Temporary Pavement Marking (NOTE: This special provision was April 1, 2012 previously named "Pavement Marking Tape Type IV".) 20338 60 Training Special Provisions Oct. 15, 1975 80318 61 Traversable Pipe Grate for Concrete End Sections (NOTE: This Jan. 1, 2013 special provision was previously named "Traversable Pipe Grate".) 80288 62Warm Mix Asphalt Jan. 1, 2012 80302 63 Weekly DBE Trucking Reports June 2, 2012 80071 64 Working Days Jan. 1, 2002 The following special provisions are in the 2018 Supplemental Specifications and Recurring Special Provisions File Name Special Provision Title New Location Effective 80368 Light Tower Article 1069.08 July 1, 2016 80369 Mast Arm Assembly and Pole Article 1077.03(a)(1) July 1, 2016 80338 Portland Cement Concrete Partial Depth Hot -Mix Recurring CS #35 April 1, 2014 Asphalt Patching 80379 Steel Plate Beam Guardrail Articles 630.02, 630.05, Jan. 1, 2017 630.06, and 630.08 80381 Traffic Barrier Terminal, Type 1 Special Article 631.04 Jan. 1, 2017 80380 Tubular Markers Articles 701.03, 701.15, Jan. 1, 2017 701.18, and 1106.02 April 1, 2016 Jan. 1, 2006 Jan. 1, 2018 Jan. 1, 2017 AuQ. 1, 2017 April 1, 2016 April 1, 2017 Jan. 1, 2018 April 1, 2016 April 2, 2015 Revised April 1, 2016 The following special provisions require additional information from the designer. The additional information needs to be submitted as a separate document. The Project Development and Implementation section will then include the information in the applicable special provision. The Special Provisions are: • Bridge Demolition Debris • Building Removal -Case IV • Material Transfer Device • Building Removal - Case I • Completion Date • Railroad Protective Liability Insurance • Building Removal - Case II • Completion Date Plus Working Days • Training Special Provisions • Building Removal - Case III • DBE Participation • Working Days IF il, 1 111 111 Effective: June 2, 2017 (b) Compensation. Compensation wHl not be allowed for delays, inconveniences, or damages sustained by the Contractor from conflicts with facilities not meeting the above definifion, or if a conflict with a utility in an unanticipated location does, not cause a shutdown of the work or a docurnentable reduction in the rate of progress exceeding the filmits set herein. The provisions of Article 104.Oi3 notwithstanding, copensation for delays caused by a utility in an unanticipated on will be paid according to the N rovisions of th,is Aoverning minor and'! major delays or reduced rate of production which are defined' as folIlows,, (1)i Minor Delay. A minor de�a�y occurs when the work *M conflict with the utflity in an unanticipMted locat�ion is completely stopped for moire than two hours, but not t#, exceed two weieks, (2)i Major Delay, A major delay occurs when the work in conflict with the utility in an unanticipated location is completely stopped for I than two weeks. (3) Reduced Rate of Production Delay. A reduced rate of production dellay occurs when I the rate of production on the work in copated location decreases by moire than 25 percent and lasts longer than seven calendar days." ;I11 I 1 111111 !11 1111 IIII�1111 111111111 Ill llll;l� ::I "(c:) Payment. Paymient for Minor, Major, and Reduced Rate of Production Delays will be I miadle as foHows, (1) Minor Delay. Labor idled', which cannot be used on oIthier work wilIl', be paid for according to Article 10!9,04(b)(1) and (2) for the time between start of the delay and the minim:uim remaining hours in the work shift required by the prevailing practice in the area. Equipmenit idled whIilch cannot be used on other work, and which is authorized to I standby on the project site by the Engineer, will be palid for according to Article 1091.04(b)(4). Equipment will be the sarne as for a minor de�ay, except Contractor -own I tquipment will be limited to two weeks, plus the cost of move -out to either t Contractor's yard or another job and t�he cost to re-mobiilize, whichever is les! ; .1 Rental!: equipment may be paid for longer than two weeks provided the Contractor presents adequate suipport to the Department (includinglease agireernent) to shoiw retaining equipment on the job is, the most economical COUrse to follow and in the pubfic interest. (3) Reduced Rate of Production Delay'. The Contractor wiflIll be compensated for the reduced rdUCtIVity for labor and equipment time in excess of the 25 percent threshold for that portion of the delay in excess of seven calendar days. Determination of compensation will be in accordai,nice with Article 104.02, except labor and material additives will not be permitted. 14 Ito KQX (Q IN - 1] 4 IN KTATJ I In ONKO 1 91, 11111 gl�1�1 IiIIII i I 1 0 (1) When adverse weather prevents work on the controlling item. (2) When job conditions due to recent weather prevent work on the controlling item. (3) When conduct or lack of conduct by the Department or its cons,ultants, representatives, officers, agents, or ernployeesY delay by the Department in making the site available; or delay in furnishing any items required to be furnished to the Contractor by the Department prevents work on the controlling item,, (4) When delays caused by utility or railroad adjustments prevent work on the controlling item. (5i) When strikes, lock-ouits, extraordinary delays in transportation, or inabiility to procure critical materials prevent work on the controlling iteim, as long as these delays are not due to any fault of the Contractor. (6) When any condition over which the Contractor has no control prevents work on the controlling item." other than as al'l'owe!d by, Artide 1019.13, lost opportunity, preparation of claim expenses and other consequential indirect costs regardless of method of calculation. The above Basis of Payment is an essential element of the contract and the claim cost recovery of the Contractor shall be so limited." 1211111111511@111VNi1i R1112 VITIR III! "109.13 Payment for Contract Delay., Compensation for escalated material cost escalated labor costs, extended project overhead, and extended traiffic control' wfl:11 be al�111�o when such costs result from a delay meeting the criteria in the following table. .... ....... Contract Type Cause of Delay Length of Delay ............. Working Days Article 108.04(b)(4)(b)(3) or No workinved weeks. ays have been charged for two Article 108.04... Completion Articl_........qonsequitie 108.08(b)(1) or , The Contractor has been granteda minimum Date Article, 108.0 b)(7) two week extension of contract time, according t Article 108.08. Payment for each: of the various costs will be according to the following. (a) Escalated Material and/or Labor Costs. When the delay causes work, which would have otherwise been completed, to be done after material and/or labor costs have increased, such increases will be paid. Payment for escalated material costs will be limited to the increased' COStS substantiated by doentation! furnished by the Contractor. Payment for escalated labor costs will be lirnited to those items in Article 109.04(b)(1) and (2), except the 35 percent and 10 percent additives will not be permitted. (b) Extended Project Overhead, For the duration of the delay, payment for extended project overhead wiill be paid as follows, (1) Direct Jobsite and Offsite Overhead. Payment for documented direct jobsite overhead and documented' direct offsite overhead, including onsite supervisory and administrative personnel, wil"I be allowed according to the following t�able. Original Contract Supervisory and Administrative Amount Personnel Up to $5,000,0010 One Project Superintendent One Project Manager, Over $ 5,0010,000 - One Project Superintendent or up to $25,000,000 Engineer, and One Clerk Over $25,,000,0100 - One Prect Manager, te up to $50,000,000 One Prooject Superinndent, L.- -- ---- -- One Erjq� One Clerk One Project Manager, Over $50,000,000 Two Project Superintendents, One Engineer, and One Clerk . . ............. ',2)i Home Office and Unabsorbed Overhead. Payment for home office and unabsorbed overhiead wil�l be calcul;lated as 8 percent of the total delay cost, (c) Extendied-Traffic Control, Traffic control required for an extended' period' of time due -4 the delay will be paid. For working day contracts the payment will be made according4t Article 109.04. For completion date contract�s, an adjustment will be determined as followsi. or MEN MW � � i P 11111RI !!11111111 11111111 1 11 If a A-33115 R NO a = rn WO� 11 1111111fw ETCP Adjustment ($) = TE x (%/1:010 x CUP / OCT) Extended Traffic Control occurs between December 1 and March 31 :. ETCP Adjustment ($) = TE x 1.5 (%/1001 x CUP / OCT) WhereftTE Duration of approved time extens,ion in calendar days, % Percent maintenance for the traffic control!, % (see table below), C U P Contract u n it price for the tra, ffic control pay Itern in place during the delay. OCT Original contract time in calendar days, LVMWFM,��!' Percent Maintenance $2,000,000 65% $2,000,000 to $10,000,000i 75% $10, 0001, 00O0010i, O00 Over $20,000,0100 When an ETCP adjustment is paid under this provision, an adjusted' unit price, as i provided foir in Ar-6cle 701 .20(a) for increase or decrease in the value of work by more than ten percent will not be, paid. Upon payment for a contract delay under this provision, the Contractor shall assign su � I b�ro�gation rights, to the Department for the Department's efforts of recovery from any other party for monies paid by the Department as a resuft of any claim Under this provision. The Contractor shall fully cooperate with the Department in its efforts to recover from another party any money paid to, the Contractor for delay damages under this provision." CONSTRUCTION AIR QUALITY — DIESEL RETROFIT (BDE) Effective: June 1, 2010 Revised: November 1, 2014 The reduction of emissions of particulate matter (PM) for off-road equipment shall be accomplished by installing retrofit emission control devices. The term "equipment' refers to diesel fuel powered devices rated at 50 hp and above, to be used on the jobsite in excess of seven calendar days over the course of the construction period on the jobsite (including rental equipment). Contractor and subcontractor diesel powered off-road equipment assigned to the contract shall be retrofitted using the phased in approach shown below. Equipment that is of a model year older than the year given for that equipment's respective horsepower range shall be retrofitted: Effective Dates Horsepower Range Model Year June 1, 2010 600-749 2002 750 and up 2006 June 1, 2011 21 100-299 2003 300-599 2001 600-749 2002 750 and up 2006 June 1, 2012 21 50-99 2004 100-299 2003 300-599 2001 600-749 2002 750 and up 2006 1/ Effective dates apply to Contractor diesel powered off-road equipment assigned to the contract. 2/ Effective dates apply to Contractor and subcontractor diesel powered off-road equipment assigned to the contract. The retrofit emission control devices shall achieve a minimum PM emission reduction of 50 percent and shall be: a) Included on the U.S. Environmental Protection Agency (USEPA) Verified Retrofit Technology List (I��tt�p:ff eta.covfclleandiiesellfveiriifiicatiionfveiriif Iliist.l��tir��), or verified by the California Air Resources Board (CARB) (I��ttip:ff airb.ca.ovfdiiesellfveirdevfvt/cvt.l��tir��); or b) Retrofitted with a non -verified diesel retrofit emission control device if verified retrofit emission control devices are not available for equipment proposed to be used on the project, and if the Contractor has obtained a performance certification from the retrofit device manufacturer that the emission control device provides a minimum PM emission reduction of 50 percent. Note: Large cranes (Crawler mounted cranes) which are responsible for critical lift operations are exempt from installing retrofit emission control devices if such devices adversely affect equipment operation. Diesel powered off-road equipment with engine ratings of 50 hp and above, which are unable to be retrofitted with verified emission control devices or if performance certifications are not available which will achieve a minimum 50 percent PM reduction, may be granted a waiver by the Department if documentation is provided showing good faith efforts were made by the Contractor to retrofit the equipment. Construction shall not proceed until the Contractor submits a certified list of the diesel powered off-road equipment that will be used, and as necessary, retrofitted with emission control devices. The list(s) shall include (1) the equipment number, type, make, Contractor/rental company name; and (2) the emission control devices make, model, USEPA or CARB verification number, or performance certification from the retrofit device manufacturer. Equipment reported as fitted with emissions control devices shall be made available to the Engineer for visual inspection of the device installation, prior to being used on the jobsite. The Contractor shall submit an updated list of retrofitted off-road construction equipment as retrofitted equipment changes or comes on to the jobsite. The addition or deletion of any diesel powered equipment shall be included on the updated list. If any diesel powered off-road equipment is found to be in non-compliance with any portion of this special provision, the Engineer will issue the Contractor a diesel retrofit deficiency deduction. Any costs associated with retrofitting any diesel powered off-road equipment with emission control devices shall be considered as included in the contract unit prices bid for the various items of work involved and no additional compensation will be allowed. The Contractor's compliance with this notice and any associated regulations shall not be grounds for a claim. Diesel Retrofit Deficiency Deduction When the Engineer determines that a diesel retrofit deficiency exists, a daily monetary deduction will be imposed for each calendar day or fraction thereof the deficiency continues to exist. The calendar day(s) will begin when the time period for correction is exceeded and end with the Engineer's written acceptance of the correction. The daily monetary deduction will be $1,000.00 for each deficiency identified. The deficiency will be based on lack of diesel retrofit emissions control. If a Contractor accumulates three diesel retrofit deficiency deductions for the same piece of equipment in a contract period, the Contractor will be shutdown until the deficiency is corrected. Such a shutdown will not be grounds for any extension of the contract time, waiver of penalties, or be grounds for any claim. 80261 LIGHTS ON BARRICADES (BDE) Effective: January 1, 2018 Revise Article 701.16 of the Standard Specifications to read: "701.16 Lights. Lights shall be used on devices as required in the plans, the traffic control plan, and the following table. Circumstance Lights Required Daylight operations None First two warning signs on each approach to the work involving a nighttime lane "ROUGH Flashing mono -directional lights closure and GROOVED SURFACE" (W8-1107) signs Devices delineating isolated obstacles, excavations, or hazards at night Flashing bi-directional lights (Does not apply to patching) Devices delineating obstacles, excavations, or hazards exceeding Steady burn bi-directional lights 100 ft (30 m) in length at night (Does not apply to widening) Channelizing devices for nighttime lane None closures on two-lane roads Channelizing devices for nighttime lane None closures on multi -lane roads Channelizing devices for nighttime lane closures on multi -lane roads separating None opposing directions of traffic Channelizing devices for nighttime along Steady burn mono -directional lights lane shifts on multilane roads Channelizing devices for night time along Steady burn bi-directional lights lane shifts on two lane roads Devices in nighttime lane closure tapers Steady burn bi-directional lights on Standards 701316 and 701321 Devices in nighttime lane closure tapers Steady burn mono -directional lights Devices delineating a widening trench None Devices delineating patches at night on None roadways with an ADT less than 25,000 Devices delineating patches at night on None roadways with an ADT of 25,000 or more Batteries for the lights shall be replaced on a group basis at such times as may be specified by the Engineer." Delete the fourth sentence of the first paragraph of Article 701.17(c)(2) of the Standard Specifications. Revise the first paragraph of Article 603.07 of the Standard Specifications to read: "603.07 Protection Under Traffic. After the casting has been adjusted and Class SI concrete has been placed, the work shall be protected by a barricade for at least 72 hours." 80392 PAYMENTS TO SUBCONTRACTORS (BDE) Effective: November 2, 2017 Add the following to the end of the fourth paragraph of Article 109.11 of the Standard Specifications: "If reasonable cause is asserted, written notice shall be provided to the applicable subcontractor and/or material supplier and the Engineer within five days of the Contractor receiving payment. The written notice shall identify the contract number, the subcontract or material purchase agreement, a detailed reason for refusal, the value of payment being withheld, and the specific remedial actions required of the subcontractor and/or material supplier so that payment can be made." 80390 PORTLAND CEMENT CONCRETE (BDE) Effective: November 1, 2017 Revise the Air Content % of Class PP Concrete in Table 1 Classes of Concrete and Mix Design Criteria in Article 1020.04 of the Standard Specifications to read: "TABLE 1. CLASSES OF CONCRETE AND MIX DESIGN CRITERIA Class of Conc. Use Air Content % PP Pavement Patching Bridge Deck Patching (10) PP -1 4.0 - 8.0" PP -2 PP -3 PP -4 PP -5 Revise Note (4) at the end of Table 1 Classes of Concrete and Mix Design Criteria in Article 1020.04 of the Standard Specifications to read: "(4) For all classes of concrete, the maximum slump may be increased to 7 in (175 mm) when a high range water -reducing admixture is used. For Class SC, the maximum slump may be increased to 8 in. (200 mm). For Class PS, the maximum slump may be increased to 8 1/2 in. (215 mm) if the high range water -reducing admixture is the polycarboxylate type." 80389 LR 107-4 Page 1 of 1 State of Illinois Department of Transportation Bureau of Local Roads and Streets SPECIAL PROVISION FOR INSURANCE Effective: February 1, 2007 Revised: August 1, 2007 All references to Sections or Articles in this specification shall be construed to mean specific Section or Article of the Standard Specifications for Road and Bridge Construction, adopted by the Department of Transportation. The Contractor shall name the following entities as additional insured under the Contractor's general liability insurance policy in accordance with Article 107.27: Village of Mount Prospect The entities listed above and their officers, employees, and agents shall be indemnified and held harmless in accordance with Article 107.26. LR 109 Page 1 of 1 State of Illinois Department of Transportation Bureau of Local Roads and Streets SPECIAL PROVISION FOR EQUIPMENT RENTAL RATES Effective: January 1, 2012 All references to Sections or Articles in this specification shall be construed to mean a specific Section or Article of the Standard Specifications for Road and Bridge Construction, adopted by the Department of Transportation. Replace Article 109.04(b)(4) with the following: "(4) Equipment. For any machinery or special equipment (other than small tools) the use of which has been authorized by the Engineer, the Contractor will be paid according to the latest revision of "SCHEDULE OF AVERAGE ANNUAL EQUIPMENT OWNERSHIP EXPENSE" and latest index factor as issued by the Illinois Department of Transportation. The equipment should be of a type and size reasonably required to complete the extra work." � w O z m F H _ j o a z oz mFz d o w zz z� w z ❑ ❑ Nom o00 as Y no o w ow¢zzz ❑ �w uwLL j 000LL' Jz w ❑? �w dww a�mwwwrrzT�a vein vri oa�-_ a �a2zw J a m o o w u a w~~ 0 .5 o - w w z r r r w s z w w w w z m m LL LL> w w= o J N a x o ❑omaaa z� �.aa. zzz ���w��� 0 0 0 0 o ou�z aaoi�w LL. j'm»z �.,w w�, y�,n �,rr rr rrrrrrr rrrrrrrrrrr»» »»»>>»;;;;;;; a o - o w w� 3 wo uz w i D < a Y a a c z J m F z w j n w � w z z z v. o N w z z❑ - ❑❑u>u� w<az LL �� �< -a❑ ao D o o r w r v, - w w www N zzz>zzz �r'g;aaa�°�o��0000gr�aiioo�z ��- w��za� ❑ » uu » H s w �>000000❑__ __-- mwms ww woaN as ww oao�000000aaaasaaammss:smmmsmam__000�� n nNNN 0000nwaaaoQ w r� N a ❑ LL y o .................0 .....o..... va,.ovs,...s., v�',�vo, ��., nn nv'❑,�'c Evo, ��., u o w ~ � w u a a ¢ z Y zz om � Fw wo3❑ � r oa 'x w❑❑a w�allo�� ,n > J� J, z s FF w❑ _ca a=a- x zms o a❑wxaoAwa azmou�r.aa3z ❑s�w�wom a m�z ww aa�o�zNjoo w¢swzz_oozz�xx�a, m'z zw wz�awoo��rmoaww=o-jazz m�w'�" wo'3oo�az�v�zzooQYdaaw'�uz�oo=aaaaw_____5000-a 00000wQ<�Q o a r n❑ w - ❑ z z z z o x x x x x _~? i T a a a ❑ K" w w a z o a� z o r Q a❑❑❑❑ o ❑ ❑ LL u w s y o N o m r w o o a z LL o a o u F u us, -Jr ❑ o a _ s~ -rr z z w J w s o z_ a w n n z aa> F w s a u u' ~❑ n a a o o¢ a> u u a w �❑, w w a s s LL a a❑❑ o o z o o xo a a w a >a o> a ❑a a ❑❑a ❑w w www wwwoLLLLLLwwLLw�LLLL LLwLLc�i�c�ui�ui�c�uc�u c� '¢ 1 ��� wn>�wLL >� a �u a z c�� ? >❑j uw u a om s muamo� _ - wLLwm❑sLLs¢a >�sssz a -xi a ❑a oa❑aoo❑oa ❑w w wwwww wwww�w LL�w LL�w LL�wLL �wLL LL LLuuuuGuuc�uuuc�x z 0 u w z J z a a a z u o 0 0 'w' w n ❑ a i o s- ou w a w J z w ,❑ a o a o z o t� za oa.� ?__ ,� ❑ w F u W N H w O a-- O ~ i `� z O w Y a z m x d s LL N y w❑ O--- F-- m' V H H twn ut oV z z~ Z~ w Q O O~ 2 2 z Z z z a a� » mo o a� - V U a w D x >> x a a a a a = 1-r O O s i O O o 0 0 0 0 0 0 0 o D o 0 a a a a a a s a s a s a s w m m m m m m m m m m m m m u u o u o u o u u u u u u u u u u u u u u u u u u u u u u u t� zx w d ❑ oo waw �� N❑ zzz a w V u a x a w❑> x Y '� > z y o Y m a u - u o o u o w a¢aa¢a¢a¢a<aaammm mmm mammuuuuuuuuuuuuuuuuuuuuu u u uuuuxth Eel al' o 1 O o T \ U) J o U)i� co o En w 1 O000 mOzLLU LU t 11 o ro U) Q C, z o= a aha m - wl Wl o° it- o 0 0° DIV z z n s baa cn cn 2 En w LU t 11 o= a Q=_ - - it- -- o a a a= z n s Ll I o a o ��w�� wl I i I I I N 2 w w N - W L - f - alb o o o, 0 0 0 0 o m o x w LU LLI- - v a = X W U) 2 W ~Z cn a is X U W N a - n x CL Lul a © a f J o U 0U,Z U m ZN 22 o o � W cng� c o Awa o a J omo ® ® ¢ aaa F- V -, v a � I � I i CL LU 0 w1 U) m 5 W W ~ ~ z = z a - W m U - LU w 0 0 z Zi it CL j 0. S S i X W z - w � z v� - - v s a = - - = o r Wo _ N ° (n NN i J ONfnw c DIN .I000 I�0W�a Nam o o> a� IANf R R o ° •• a a z oho BINE h N I z m z DIN •I000 I�aa cn N LU N c� z Y It LU I #� al 0 © Ali' t a� Wl U v b W � �= W- - - - - - _ 74 - a o LU u LU I #� al 0 © Ali' t a� Wl U v b W � �= W- - - - - - _ 74 - a o I w � ° ® � � � w w� W F � W - O = — ul LL h (+ T h r► T ;) �)4 � mi 4 � 4.) (+ 0. ONLY ONLY ONLY ONLY ONLY ONLY xi W U) Z Y Z LU LU uo uo- _ - - u J oNNw c MZZ= o r2 0 o P: W c a F p Awa o pmt � ZMZ cn F- (1) aa - o cn m. o <D>OOOOOm� mzza w ��W cna� ❑ ACD wa o LU �mG ZmZ cn aaa F- _ a a 0 W = z EiK d s In V En W J p _ �2 CL a a ❑ Z a a w m o a m m m u m LL a � � O I O Ln U + a� Q al 1 a I d a a x � II II II WI a a WI I � i Cl) Z LU H J D IL J a J ? W LL -3 u u u p _ ww ti N a V - a a o a _ I � I I al " ° aLd al ' I I I I I I I � I ! WI w d J >W JW I I ' I I I WI I I I I I En W J p _ �2 CL a a ❑ Z a a w m o a m m m u m LL a � � O I O Ln U + a� Q al 1 a I d a a x � II II II WI a a WI I � i Cl) Z LU H J D IL J a J ? W LL -3 u u u p _ ww ti N a V - a a o a _ a� b,i i IBJ El El o - a xi i�, ori iii -rte -ii -,-i �� i���� W - -yam _y, i_u_�� �� _� oJ_� -�_n W W E 2 N LL F - - - LL 11 x LU U) m W U) LU _ x W J Q Z - U_ W - a M F_ u _ _ - - - - U) J ONcnw a mZZN a �0� a P: LU a cngF- o Awa o pM t � Z m Z y aaa F - Fed ad N [EU 0 n 0 0 H , Ld IN 0 @ 2 0 2 2 U: o m m\ a M 2 2/ k ` �Rw U) o LU a § d s c o w d d o°\ Din 2in2 w 2 § ) } I. I o. l e o 0, w� \ \ \ } . § o r n - §§ I S u } § \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ > }} \ g w w kLU ) \ j LL § ) } } 0 « : LL LLj \ - b \LU- \ \ \LU \ \ \ \ \ \ \ \ \ \ \ \ \ \ K 7 LLI t \ \ 0 \ \ ) �� I e » o # e + • + \ \ « \ \ \ � \ / }{{°ƒ �� 2§ a y n e a« o®§ r o e } wI ^ ~ U) 2 \ \ \ \ § 0w m - \ k - § ) 2 § ) } I. I o. l e o 0, w� \ \ \ } . § o r n - §§ I S u } § \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ > }} \ ? R � )p cm _ - C4 w § | m �\ \ { 2 k ::: § ®:« : = 2 ` 0UJ Lu 5: E � E U b | o - o /{\>f o S f o |® o CL:(t\)\ | lo O})() cn z N C J Q o N a _ LLI W M v �a o O i- - UJ o s _ - W y JnL JnL [I/VI, • II - - O _ W Q (009) - (009) - _ -_ (009) REM -77 • I I y y o• - _ � y O I a `el O O lw Sb) O O O .0 .OS[ 41 41 LU o a JI w!I= - UJ gib_ Qz ALu O Z -_-- = -_, 3 n moa Z a O � E a Z to Z a Ng O LU- W Z w � a O O a V Q \© (w osl Ooz 0 O O lw Sb) O O O .0 .OS[ 41 41 LU Qz ALu O Z Q 3 n z Z a E a E LU- a W J Oo O O O O O OO � O � � � • a 0 n JL o� J L U 0 8 — Z T v N u� v ¢ w_ W N �„, ,.? v W LL p Q ' a O I Iml (006) � z LL z o N 22m a s o _- / s � s MIN 1006) 9£ Q U W a o,MR,, Z F ? Z � L� W m s J Q 006) ww F ” w a viui � (aoe-o0z) - I-0 F w - /iii iii U o m a (ao[) m b W o w J- b a ........... I � � z1 -z F (osl z axl sz m w Z in Q Q � U W Q W p� So 0 - Lu W Z c J (006 W (00£-OO7) Q N 9E - 0Z O iy ZI-S [[[ F W G I LU W i W Q % mC:i � Q . LLI �. U r L- las[) w y ¢ u"i ............ (OD d (00i) viw Lb (00e) es (006-00z) c O Al (aos-oaz) ZI�S LLA w - Z Q ��01V foo -asp) ` GO.7 D a ��� €€aa m — � m %i Q _ 5 a m 006) 0E 0 0 _ c5 Z o wQ V o ztz x H � � - O w W VQ CN X _ 6L Oz L --X— InO LLI j= aLu _ �`o _ _ 2 o�x _ _ y- 510, �zv xz- (Daw Quroi'wz-) s 7,1 WUC�ZZ�JW>W�xZy-.c _ w �(SZ5�C o0b0/IZ i9i iiifiiZ5 i % I ) N (001) (S LU Cni E EN LU c uj cn UJ 0. 4—w -ed ;o 6p3 vv on yJO�ZUVlWQFWL �$ j Z w :n � U O O O o s J o a o O N o ti c 0 Z LLI m o L o000o C V o O V ti ajo L Z 00000 � a ¢ L °0000 I y d F E N W J m Cd' 0 I _ I d - O--I-I— +I \ 1 a a y a Z +� Z eu tol O0.DUI ulw (w ul ul 16 I a I I II II II w a 0 (tr( j LLo ¢ m6) �hE l Z o y 0 Q J V U J tu W 1 0 U W H 1 ¢ W J Z _ ¢ V - a ¢ o a two g m w 2 oo _-- ���(,b cLU - - - J LLJP md' I ca a LL -- 00 a - ¢ s a TEzw ug 00 - u,w 069) �w - bZ (w S'Il �9 � 1 IM 2 (W I'Z) .L M -s .L - M - o 0 a aCL z z w cm ti z � M z - z s � a z c in z 0 1 cm -s .L - M - o _ - Wil✓ fW j'zl a z v = 0 �u `~ 0 o 00 } 00 in 17 LL W < [n W ¢ J 1 a m W a, ¢ z z - � a Z J w - o fs a a a W ' _ _ 17 ¢�¢ W w oo a � � 00 Q r � (ZEb) L[ / U 3 3 a Q - aW = J W ¢ J y V d L 0= I - aLU Z F� I IIII d a V C'3 O z - cn H CD a OJ 1 z y (q W fn _ H d O - a 9 O z OEM � o IIII z ¢ d' _ 7 �.� ALIgust 20, 2018 — 1:00 P.M. Local Time Mount Prospect Vill ' age Hall, 3" Floor 50 S. Emerson Street Mount Prospect, Illinois 60056 00 R, W. of Transpbftafion STATE OF fWNOIS COUNTY 01F Cook ViHavc afmotno Prosy Local Public Agency Formal Contract Plroposal (Narn,e ot Cq, VWage, Tawi oT Roid Disthirt) FOR THE. OWIROVEIMENI OF STREET NAME OR ROUTE NO Ra .��rdviL,w t,,IiqV.widree s Stt: SIECTIC)N NO, 18-00169-004,1' TYPES OF FUNDS \/tF'I" [�] SPECWCATIONS (requ�rvp EQ, PLANS (requgied) SubrnrttedlAppfd ', .... . ...... ......... . . . o Blawd of "St C�' 4 y P�e i rus ie�m umapal OffibM For Cou�nty and Road District Projects SubrnlIted/Approved Commissioner . .......... Date SubmittediApproved ITEIuv�� 411 _edc ......... .. . Date Department orf 'Transportation q'Ael9l' f6ebid basedtartHrTlilftdd rev*w ,)ate �J 4' N B b 4 R p todio e " t� 'S 22 61'2]062 J_ CCNSED o— oXI-r- V 0 IfW A, I TM q Nati AH proposal docurnents, rtncltudinct f1roposai Guaranty Checks or l.- raposaG Bid Bonds, shoul6d be stapled tog0her to prevent loss when bids are processed PInnted 612, W201 8 Page 1 07 BLR 12MI (01MRA4) IN,Aff U110FITHraw-.1no County _Sjook, NTICE TO BIDDERS Local Public Agency Mount 11rospect Section Number 18-00169-00-tJ Route Randvie" i&IaLi . . ..................... mw......, Sealed proposals for the improvement described below will be received at the office of the Mila e Manager, 3,d Floor, 50 S. Emerson Street, Mount PEqs2,ect, IL 60056 --- . until .. 1,OQpm on .....---Aug uist 20, 2018 Address 1-ime Date Sealed proposals will be opened and read publicly at the office of the Villa e Manager 31d Flo�or, 5�O S. Emerson Street, Mpu!�_F os (�ct, IL 60056 at 1 �00prn on Address T�mp Date Name Randview Highlarids Street IJLhfln, Project Lengith: 6100 'feet C 116 miles) Location Various - See location mal) oil plari cover sheel Proposed Improvement L!2h1_,pole installation, unit dUCt, conduit, lighting controller and other miscellaneous items, of work, 'I, Plans and proposal forms, will be available in the office of Village of Mount Pro��cVs website W�6�1 project should be directed to Daniel Schug at Baxter & Woodman Inic., 815-459-1260. . ........ . ... . .. . . ..... . .............. . . . . . ......... . . .. . ...... . ............ Address 2� 0 PrequaJification Municipal and private work, One original shall be filed with the Awarding Authority and one original with the 0OT District Office, 3, The Awarding Authority reserves the right to waive technicalities and to reject any or all proposals as provided in, BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals The following BLR Forms shall be returned by the bidder to the Awarding Authority: a. BLR 12200� Local Public Agency Formal Contracl-Proposal b. BLR 12200a Sche!duile of Prices c, BLR 12230: Proposal Bid Bond (if apphcable) d�, BLR 12325, Apprenticeship or Training Program Certification (do not use for federally funded projects) e, BLR 123i26� Affidavit of Illinois Business Offic�e PdrIed 7125/2018 Page 2 of 7 BLR 12200 (01(08/14) I 0:k do] N IMMAtworz] 5, The quantities appearing in the bid schedule are approximate and are prepared for the comparison of bids. Payment to the Contractor will be made only for the actual quantities of work performed and accepted or materials furnished according to the contract. The scheduled quantities of work to be done and materials to be furnished may be increased, decreased or omitted as hereinafter provided, 6, Submission of a bid shall be conclusive assurance and warranty the bidder has examined the plans and understands all requirements for the performance of work.. The bidder, will be responsible for alll errors in the proposal resultingfrom failure or neglect to conduct an in depth examination The Awarding Authority will', in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting, from such, failure or neglect of the bidder, 7, The bidder shall take no advantage of any error or omission in, the proposal and advertised contract. 8, if a special envelope is supplied by the Awarding Authority, each proposal should be submittectin that envelope furnished by the Awarding Agency and the blank spaces on, the envelope staalli be filled in correctly to clearly indicate its contents. When, an envelope other than the special one furnished by the Awarding Authority is used,, it shall be marked to clearly, indicate its contents, When sent by mail, the seated proposal shall be addressed to the Awarding Authority at the address and in care of the official In whose office, the bids are to be received, All proposals shall be filed prior to the time and at the place specified in the Notice to Bidders, Proposals received after the time specified will be returned to the bidder unopened, 9. Permission will be given to a bidder to withdraw a proposal if the bidder makes the request in writing of in person before the time for opening proposals, Printed &2212018 Page 3 d 7 8LR 12200 (O9P08114) I IS A11R.Vk ITZIMUMN County C:"ook Local Public Agency _�4 4� PROPOSAL Lt uqu Section Number I 8 -00 1691 -00 -LI" Route RandNlew Hiphlands 1, Proposal of ° for the improvement of the above section by the construction of Liq��e installation, unit duct, conduit, ljqIu t, —controller and other miscellaneous items of work . ... . ......... a total distance of 61 feet, of which a distance of W 6100 feet, 4 116 miles,), are to be improved, Z The plans for the proposed work are those prepared by Bamcr & Wooda-lan, fric, and approved by the Department of Transportation on 1 The specifications referred to herein are those prepared! by the Department of Transportation and designated as "Standard Specifications for Road and Bridge Construction" and the "Suppiemental Specifications and Recurring Special Provisions" thereto, adopted and in effect on the date of invitation for bids, 4, The undersigned agrees to accept, as part of the contract, the applicable Special Provisions indicated on the 'Check Sheet for Recurring Special provisions" contained in this proposal. �4 101 r1gi-M-011 M Lois I; I &I 11ILZM1 I 6, A proposal guaranty in the proper amilount, as specified in BLIRS Special Provision for Bidding Requirements and i Conditions for Contract Proposals, will be required, Bid Bonds will be allowed as a proposal guaranty, Accompanying this proposal is either a bid bond if allowed, on Department form BL:�-1223�O or a proposal guaranty check, complying with the specifications, made payable to� TreaSUrer of Mouint t ---- ........ . .......... The amount of the check is 5% of the bid bond. T. In the event that one proposal guaranty check is intended to cover two or more proposals, the amount must be equal to the sum, of the proposal guaranties, which would be required for each individual proposal, If the proposal guaranty check is, placed in another proposal, it will be found in the proposal fors Section Ni]mber 8,. The successful bidder at the time of execution of the contract will be required to deposit a contract bond for the full arnount of the award, When, a contract bond is not required, theproposalguaranty check will be held in lieu thereof. If thus proposal is accepted and the undersigned failsto, execute a contract and contract bond as required', it is hereby agreed that the Bid Bond or check shall be forfeited to the Awarding Authority. 9, Each, pay iters should have a unit price and a total price, tf no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity, the unit price shall, govern. If a unit price is emitted, the total price will be divided by the quantity in order to establish a unit price, 10, A bid will be declared unacceptable if neither a unit price nor a total price is shown. 11, The undersigned submits herewith the schedule of prices on BLR 12200a covering the work to be performed under this contract. 1112'. The undersigned fUrther agrees, that if awarded the contract for the sections contained in the combinations an RLR 12200a, the work shall be in accordance with the requirements of each individual proposal, for the multiple bid specified in the Schedule for Multiple Bids, below. POnted 612212018 Page 4 of 7 BLR' 12200 (01 AW 14) Epp -p.m - Schedule for Mu County Cook Local Public Agency Village of Mount Prospect Section 18 -00169 -00 -LT Route Randviw Highlands Schedule for Silngille Bid! For com,12lete information coveiring these items, see glans and Item, Iterns, Unit Quantity Unit Price Total Na. 1 TEMPORARYFENCE FOOT 500 3 00 2 ELECTRIC SERViCE INSTALLATION EACH 1 3 ELECTRIC UTILITY SERVICE LSUM 1 CONNECTION 000 0 4 UNDERGROUND CONDUIT, GALVANIZED FOOT 100 STEEL, 3" DIA, UNIT DUCT, 60OV, 4-1C NO.8, II/C NO.8 5 GROUND, (XLP-TYPE USE), 1 1/4"' DW EACH 590 POLYETHYLENE UNIIT DUCT, 60OV, 2-1C NO 8, 1/C NO,8 6 GROUND, (XLP-T"PE USE), 3/4" DIA. EACH 4,725 POLYETHYLENE UNIT DUCT, 60OV, 2-1C NO8, 1/C NO,8 7 GROUND, (XI -P -TYPE USE), 1 112" DIA, EACH 255 POLYETHYLENE A 8 LIGHTING CONTROLLER, BASE EACH 1 MOUNTED, 240VOLT, 100AMP I 10, 58 584. 5'a 9 LIGHT POLE FOUNDATION, METAL, 11"'EACH 20 BOLT CIRCLE, 8 5/8"' X 6' Pp rled 612812018 Page 5-1 BLR 122001 (01MMA) Ridldir"s Proposal FoT making Entine Improvements item Items Unit Quantity I Unit Price Total 10 BREAKAWAY DEVICE, COUPLING WITH EACH 20 ALUMINUM SKIRT00 m LUMINAIRE, LECA, HORIZONTAL MOUNT, 11 LOW WATTAGE EACH 20 12, LIGHT POLE, ALUMINUM, 25 F T, M.II1.1 EACH! (t SINGLE 1CI" hA'ST ARM TRAFFIC CONTROL AND PROTECTION N 13 STANDARD 701501 L SUM 1 1 TRAFFIC CONTROL AND PROTECTION L Uiuti 1 STANDARD ARD 701701 70 TRAFFIC CONTROL AND PROTECTION 1 STANDARD 7018011 L SUIS 1 1 CONSTRUCTION LAYOUT L SUM 1 P dnted 6128/2018 Page 5-2 BLR 122200 (0110&14) R41112,10171111 11211 -.It County Cook Local Public Agency CONTRACTOR CERTIFICATIONS .. ...... Section Number 18-00169-004J Route Randview llijftlw rt The certifications heremafter made by the bidder are each, a material representation of fact upon which reliance is placed should the Department enter into the contract with the bidder. 1, Debt Delinquency, The bidder or contractor or subcontractor, respectively, certifies that it is, not delinquent in the payment of any tax administered by the Department of Revenue unless the individual or other entity is contesting, in accordance with the, procedures established by the appropriate revenue Act, its liability for the tax or the amount of tax, Makiinig a false staternent voids the contract and allows the Department to recover all amounts, paid to the individual or entity Linder the contract in a civil action - Birt -Rigging or Bid Rotating, The bidder or contractor or subcontractor, respectively, certifies that it is not barred: from contracting with the Department by reason of a violation of either 720, lLCS /33E-3 or 72'0 IL S, 5133&4- A violation: of Section 33E-3 would be represented by a conviction of the crime of bid -rigging which,, in addition to Class 3 felony sentencing, provides that any person convicted of this offense or any similar offense of any state or the United States which contains the same elements as this, offense shall be barred for 5 years from the date of conviction from contracting with any unit of State or local government. No corporation shall be barred from contracting with any unit of State or local government as a result of a conviction under this, Section of any employee or agent of such corporation if the employee, so convicted is no longer employed by the corp'Dration and: (1) it has been finally adjudicated not guilty or (2) if it demonstrates to the governmental entity with which it seeks to contract and that entity find's that the commission of the offense was neither authorized, requested, commanded, nor performed by a director, officer or a high, managerial agent in behalf of the corporati;oni, A violation of Section E-4 Would be represented by a conviction of the crime of bid -rotating which, in addition to Class 2 felony sentencing, provides that any, person convicted of this offense or any sirmlar offense of any state or the United States which contains the sameelements, as this offense shall be permanently barred from contracting with any unit of State or local government, No corporation shall be barred from contracting with any unit of State or local government as a result of a conviction under this Section of any employee or agent of such corporation if the employee so convicted is no longer employed by the corporation and: (1) it has been finally adjudicated not guilty or (2) if it demonstrates, to the governmental entity with which it seeks to contract and that entity finds that the commission of the offense was neither authorized, requested', commanded, nor performed by a director, officer or a highs managerial agent in behalf of the corporation, 3 Bribery. The bidder or contractor or subcontractor, respectively, certifies that it has not been convicted of bribery of attempting to bribe an officer or employee of the State of Illinois or any unit of local government, nor has the firmmade an admission Of gLilt Of Such conduct which is a matter of record, nor has an official, agent, or employee of the firill committed bribery or attempted bribery on behalf of the firm and pursuant to the direction, or authorization of a responsible official of the firm. 4. Interim Suspension or Suspension. The bidder or contractor or subcontractor, respectively, certifies that it is, not currently under a suspension as defined in Subpart l of Title 44 Subtitle A Chapter Ill Part 6 of the illinors Administrative Code, Furthermore, if suspended prior to completion of this work, the contract or contracts executed for the completion of this work may be cancelled, Printed 6/22J2 016 Page 6 of 7 BLR 12200 (0110,8114) (if a partnership) N.41TUM vil FUM U -Ins Signature of Bidder Business Address Firm Name Business Address Inset Names and Addressed of Alll Partners County Cook Local Public Agency _ ri p, t Section Number 18-00169-00-1-,'F Route Ru: pdVic w 1, I j,�z� I (If a corporation) Corporate Name l-ne, 6 it Signed By . . ...... .. .... . ......... President Business Address, I 0-64" IL 60181 PresVdent —LA�Awmp !1;1rM1 Vat 'Ptoijf-4 Insert Names of Officers 11j 01 Treasurer Set C�. Attest: Ptinled 6/22/2018 Page 7 of 7 8LR 12200 (01/081114) Tra n. ortabon WO M: FS Program Certification Route Return with Bid County fnok. . ... . ...... . ......................... . . . ........ — — -------- -- Local Agency Section MINTRIM1111! iiiii�ill'il=oz�� E For this contract proposal or for all groups in this deliver and install proposal, �-] For the following deliver and install groups in this material proposal-, I'llinois Department of Transportation poficy, adoptedin accordance with the provisions of the Illinois Highway Code, requires this contract to, be awarded to the lowest responsive and responsible b,idder. The award decision is subject to approval by the Department. In addition to all other responsibility factors, thiis contract or deliver sand install proposal requires all bidldlers and all bidders' subcontractors to disclose participation in apprenticeship or training programs that are (1l) approved by and registered with the United States Department of Labor's Bureau of Apprenticeship and! Training, and (2) applicable to the work of the above indicated proposals or groups. Therefore, all bidders are required to complete the following, certification: Except as provided in paragraph IV below, the undersigned bidder certifies that it is a participant, either as, an individual or as part of a group program, in an approved apprenticeship or training program applicable to each type of work or craft that the bidder will perform with, its own employees. The undersigned bidder further certifies for work to be performed by subcontract that each oaf its subcontractors submitted for approval either (A) is, at the time of such, bid, participating in an approved, applicable apprenticeship or training progirarni, or (B) will, prior to commencement of performance of work pursuant to this contract, establish participation in an approved apprenticeship or training program applicable to the work of the subcontract. III The undersigned bidder, by inclusion in the list in the space below, certifies the official name of each program sponsor holding the Certificate of Registration for all of the types of work or crafts in which the bidder is a participant and that will be performed with the bidder's employees, Types of work or craft that will be subcontracted shall be included and listed as, subcontract work, The list shall also, ind'cate any type of work or craft job category for which there is, no applicable apprenticeship or training program, available. Printed 6122/2018 Page I M 2 BLR '12325 (FRev. 4/07) IV Except for any work identified above, any bidder or SUbcontractor that shall perform all or part of the work of the contract or deliver and install proposal solely by individUall owners, partners or members and not by employees to, whom the payment of prevailing rates of wages WOUld be required, check the following box, and identify the owne0operator workforce and positions of ownership, [I The requirements of this certification and disclosure are a material part of the contract, and the contractor shall require this certification provision to be included in all approved subcontracts, The bidder is responsible for making a complete report and shall make certain that each type of work or craft job category that will be utihzed on the project is accounted for and listed. The Department at any firrie before or after award may require the production of a copy of each applicable Certificate of Registration issued by the United States Department of Labor evidencing such participation by the contractor and any or all of its subcontractors, In order to fulfill the participation requirement, it shall not be necessary that any applicable program sponsor be currently taking or that it will take applications for apprenticeship, training or employment during the performance of the work of this contract or deliver and install proposal, Bidder: C. 115, f By. Address� Title� V;tt Signature) SWIS16r,"t t, .. . .......... -- PO N e d 612:2/2' 18 Pagie 2 of 2 BL R 12,325 (Rev, 4,407) State of County of Iflatyp"PLUM Affidavit of Illinois Business, Office CoUrItY .,Cook Local Public Agency Section Number Rooute --R- jeyy I ---T'�Qmp Of $ IName of Affiant) (City of Affiant) into e of Afflant being first duly sworn upon oath, states as follower's 1, That I am the of 2. 'That I have personal knowledge of the facts herein stated, I That, if selected under this proposal . . ........ will maintain a (bid ef) business office in the State of Minois which wild be located in County, Illinois,, 4. That this business office, will serve as the primary place of employmenfor any persons employed in the construction contemplated by this proposal, 5. That this Affidavit is, given as, a reqUirernent of state law as provided in Section 30-22(8) of the Illinois Procurement Code. .. .. ... .. . ................ (Signalure) (PrOV Name of Affian�) This instrument was acknoWedged before me on ZCrt16— day of (SEAL) . ..... ..... . (Sqnatour e OF�FIQAL =SEAt- JULE �FELSK� StA 12326,(01/08/14) P hntedi 6/22/201B I 7NOTARY PUKK, - STATE OF ILLINKHSI �A I NIY MAMS04 EXPIRES Q�1�51 �9 10ral *0240] Bid for 'Nandview Highlands Street Lighit Project Sealed bids will be received until 1:00 p.rn, on August 20, 2018 in the office of the Village Manager, 3rd Floor, 50S. Ernerson Street, Mount Prospect, Illinois 60056. Ina sealed envelope, please submit bid clearly marked. - The project consists of installing new street lights, conduit, cable, and a controller on Forest Avenue, Fairview Avenue, Prospect Manor Avenue, and Eastwood Avenue between Highland Street arid Kensington Road 41 the Village of Mount prospect, Illinois. Biddocuments may be obtained at the Village of Mount Prolspect'swebsite www.sl of arty ros ect,qfgN05 P-- — Questions regarding this project ShOUld be directed to Daniel Schug at Baxter & Woodman Inc., 815-459- 1260 All work under this Bid and the resulting contract shall cornply with the lihnois Prevailing Wage Act, 820 ILCS 130,/01.01 et seq. and the other applicable laws and ordinances. Offers may not be withdrawn for a period of ninety (90) days after the bid date without the consent of the Board of Trustees, Any Bid submitted unsealed, unsigned, sent via email or fax or received subsequent to the aforementioned date and time, will be disqualified and returned to the bidder.. The Village reserves the right in its sole discretion, to reject any and all bids or parts thereof, to, waive any irregularities, technicalities, and inforrnalifies in bid procedures and to award the contract in a manner blest serving the, interests of the Village. 0hnois Department of Transportation pre-qUalification is required for this project, t rtabon Bureau of G'onstructon 2300 South Dirksen Flaikwa&,00ni 322 SpMigfield, Minors 62764 Part 1. Work Under Contract structlonsCornpld, e IN& form by erthef typing or usung black ir* "Authonzalion l�o Bid"will not be rssued Oes,s buM somas of 0a* form are", cnrnprOed in detail Use addi0onal fornis as needed to lR.M ail voork, Lisl below all work you haVe under contract as either a prime crintrwAcr or a sU4uCOr*3GlOTr It r% required to include all pendirq low bids not yet awarded or rejected In a j0nt venture, lml only that portion of the work which is the responsibility of your company, The LincompIefed dollar vahie is to be based upori tl)ciilostrecant eriglnee(sorown,erse�,tiniale.aridniustinctidework s,rut)c:ontractedtooltilerSr Ifnovoorkiscofiti,actE-d,sliowNONE. F—, i I - 2 1 3 1 4 11 Awards Pend`rrm7 Contract Nurnber Contract Wilt) Estimated Crmaplefion Date I o4a l C o nt raci F1 rk'.* Uncompleted Dollar Value it Flun is the Prime Contractor Uncorripleted Dollar Value it Firm is the Subcontractor Tota Value of AIII Work Accumulaled Part $1. Awards Pending and Uncompleteol Work to be done with your uwrl forces. List below the uncompileted dollar, value of work, for each contract and awards pending lobe completed with your own forces AilWark Ina joint venture, list only that potion of thewyour in be done by uf Accumulated ls cornpany. 11 no work is contracled, show NONE, Eadhwork Portland Cernenl Concrele Paving HMA Plant Wx Paving . . . . . ...... .. . ...........m.____._.......... Clean & Seal Cracks�Joinls ...... ...... .... .. -- A rjregate Bases & Sur -faces _.w... ..................... ......... .......................... . .... ... . .... . ..... .. . . ...... H ig hway, R, R, and Waterway Structures Drainage Electrical Cover and Seail Coals Concrete Coinstruclion Landscaping ........... . ........ .. . ........... Fencing Guardrail . .. .......... . .. . .. . ....... . ........... Painting Signing Cold Milling, Planning & Rotornilling Dernalifion Pavement Markings (Patnt) Other Construction (L i r. l) $ 0.010 L41 ['621 - ------ L_ Disclosure of INs information is REQUIRED to accornplish the slatutory purpose as oullined iin the "Illinais Procure�ment Code," Failure to crimply Wil result iii"I rion-jissuance of an "AL11hahzation"Fo Ptd."" 'This forn'i has been app by the Stale Forms, Management Center, Pdriled G221201 8 Page 1 of 2 BC 57 (Rev08/17110) IT, M01 MMMUMU For each contract described in Part 1. list all the work you have Subcontracted to others, MMM undersigned for Federal, State, County, City and private work, inctuding ALL subcontract work, ALL, pending low bids not yet awarded or rejected and ALL estimated completion dates Subscribed and sworn to befoina me this . ...... day of T'yp'e o'r, Print Narne Offer or Drector "Vide Notary PUU�c My commission expires (Notary Seal) Printed 612212018 Signed Company Address Page 2 of 2 BC 57 (Rev, OW1 7/10) 1 2 3 4 Awards Pending Subcontractor hf— Nloln Type of Work Subcontracl Price 90,336 Arnount Uncompleted SLAicanlrador Type of Work SWS Suboordracl Price Arnouril UncorliplMed ... . ..... . ........................................................................... . ....... 16 9; VISO Subcontractor .................... . ...... . ...... I Type of Work Subcontract Phre Arnouni Uncompleted 77. 451 Subcontractor type of Work Subloortract Price Arnouni Uncompleted Subcontractor Type ol Work 1"'it 644 Subconlract Prirx, Aniount Uncompleted ......................... ""4a7 Total Uncompleted c3e't ht g d0V sworn, do hereby declare that this affidavit is a true and correct statement redatin,g to AL. uncomiplleted contracts of the undersigned for Federal, State, County, City and private work, inctuding ALL subcontract work, ALL, pending low bids not yet awarded or rejected and ALL estimated completion dates Subscribed and sworn to befoina me this . ...... day of T'yp'e o'r, Print Narne Offer or Drector "Vide Notary PUU�c My commission expires (Notary Seal) Printed 612212018 Signed Company Address Page 2 of 2 BC 57 (Rev, OW1 7/10) 1 0 13 Pairt 111. Work Subcontracted to Others For each contract described in Part 1, list aH 0 e work you Ihavc subconlrided du 0 ters being dUly sworn, do hereby declare that ffius affidaOt is a true and correct statement rellating to ALI uncompleted contracts ofthe undersigned fw Federal, State, Caunty, City and prtivaie vvor�, inclwfing ALL subconlract work, ALI pending to bid's not yet awarded or rejecled and ALL, esfirrialed corrq)lefion dates Subscribed and sworn to befon,-,, me this day of Normy Pubhc Mv cominisslon exoires . .- . . ..... (Notary Seal) PhnIed CV2212018 Type or Print Name Signed Company Address . . ....... . Page 2 of 2 BC 57 (Rev, MY1 7/10) UTIllinois Departmen�t of Transportabon BureauafCont, iuciinn 2300 Soulh Dirk en ParkwaylRaum 22,2 Sprmql`wOd,11irwom 62764 Part L Work Under CmAract Affidavit of Availability For the Letting of 18-001619-0011 structionsz Ccmnprele thm lairs by efther I yping ON usmrg biack k* "Authonzabon to, tail "wili ncs be issusxl uless bdh Sides A I hs, furor afe crAi7p0cled m W,,M Uve addfioiiai lomru,, as meded to hd aD work 1-isl belowMl work you have undrr conliact as either;a prigne conliaclor or a subcontractor. vAth your owri, forces, All mrk orrejected Ina joint vonlure, list only Oial pc4tion The uncomplded dollar value is lo be based upon V"ie moll fecent enginev'S 0Nr owriers esbrnate., arid must mdulde wnrk, subcomracled to othefs If nommk is mm,*zrdpd,, show NONE. Earlhwrwk 1 1 2 3 — -- — ---- - ---------- - at Awards Pen&v Gontract Number . . ................ ......... ......... . .. Conlmcl'Wilh ... .. . ....... . Est4naled Cornplefion Dah., .............. '109 1 Aq8-- k4 Total Contract P'rice dM Accumulated Totals Uncoropieled DoHar Value il Firm us the Prime Contractor 11 Ian '7'2*7 ',,jjpj,fed DoH ar Vallue rf Hr in is the Subcontractor Electric a I ..._..W..._.__.._.' ..... . .. catait clue of All Work Pad 11, Awards Pending and Uncompleted Work to be done with your owri, forces. Llst bdow VIP, Uncompleted dollar ^value of work fear each conlract and awards pending to be completed vAth your owri, forces, All mrk Ina joint vonlure, list only Oial pc4tion of the work to be done by your Accumulated cninpony. Earlhwrwk Plarfland Cement Concrete Plaving . . ................ ......... ......... . .. I IMA Plant Mix FIMA Paving .............. Clean & Seal Cracks;Joirils, Aggregate Bases & Surfaa-.% Highway, R,R, and Waterway Strurtures . ..... . ... . ...... Drainage Electric a I ..._..W..._.__.._.' ..... . .. (,',ov(,t and Scal CoaI5 Concrele C onstruclrarl Landscaping - - — - - - - ---------- Guardlail . . ......... . . ........ . Painting --- — — ------------ - --- - — — — - - — ------------- - — - ------------ Signing C old Milling, FIllarming & RotomillHnq . . .... .............. ...... . . .... . ... . . .... Demolition Pavement Markings (Pamt) ottvr Construction (Li:sl S 000 Totals ...... .... Disclosure of thts i"inf'orrnatior) is, REQUIRED to accomplish I Ime slatulafy l',iur p(me as swat cried ir the "Illlmois Prncirrewent Coden" Failure to comoly WH insult urN non-issUance of an "Aulh mizalion To Dd," Thls fonri has' beian, approved by the 13tate Famis Management Genlev Flhnted 6Q212018 Page 1 cal 2 BC '67 (l,"Rov OFY1 71110) Part HL Work Subcontracted to Othem For each corAiad described un i'lad 1, fist 0 ffie work you hive sutconlracted to otheis- ' Toial! Uncompleted . . .. . . . . .................. . . 1, being duy swom, do hereby declare that this affidavit is a true and correct statement reNating to ALL uncompleted contracls ofthe undersigned foi, Federal, State, County, City and privade work, unck,ding ALL subcontract work, ALL pending low bids not yet awarded or rejected arnd.t ALI. esIrmated completion dates Subscribed and swof n to before rne this day of Type or Print Narne Officer or Direc9or Tde . ........... . Noiary Pubhc My commission expires (Notary Seal) Signed Company ,rte. mss Pnnted 612212018 Pago �2 of 2 BC 57 (Rev, 0,13/17/10) 1 2 . . . . . . ............ ............ . ... ... ..... 4 Awards Pending .............. SLAXOPA,radOf . . .. ...................... E hrwNW Subconiract Noe — � A'no un Ui 1(mrnplele�d Subconfrador Type of Work . . ............. .......... Subcortrad Price Amount .......... unconlpeted . ..... SUbcortrador Type at Work subcordract rldce AmourV, Uncompleted SubcorArador type at Waifk subcorilrad Flnce AmouO Uncompleted . ............ .. subcarktrackx I yp�e ol'Wbrk SLOUNAr3d PhCe ...W._......_ Afno�nint ....... ... . Toial! Uncompleted . . .. . . . . .................. . . 1, being duy swom, do hereby declare that this affidavit is a true and correct statement reNating to ALL uncompleted contracls ofthe undersigned foi, Federal, State, County, City and privade work, unck,ding ALL subcontract work, ALL pending low bids not yet awarded or rejected arnd.t ALI. esIrmated completion dates Subscribed and swof n to before rne this day of Type or Print Narne Officer or Direc9or Tde . ........... . Noiary Pubhc My commission expires (Notary Seal) Signed Company ,rte. mss Pnnted 612212018 Pago �2 of 2 BC 57 (Rev, 0,13/17/10) w'4' N 0 Illinois Department of Transportation DAreau C,,il consttumuon 2300 tar. Ah Dirksen Pa*wayMoorn 3?2 Spnng6dd, IUEirrvais 62764 Part 1. Work Under Contract structionsz Curpide thys tome by edher lyping cq using Nack ink, "Aulhorualiion io Bid" vvill irrA be Ps;.Sued ilen, bulli sidr, a, I Ili is form -,ire compk4ed in detafl. t Ne addgiivmial forms as ncc,,Wed lo iRsI ari work List b6nw aH Work you have under contract as Other a phtne contractor or a subcontractcir, It is required to Include all pand6g lowbids Pol yel awarded or lejvcled. In a joh-ft wi-quire, lust ority that podron of the work whii is Ihe respon,,0bilily of yoi v cornpany The uncompleled dollar value is to be ba,sed upon the tnost recent crigineer's or owners estimle, and rnust include work subcontracled to others ff rio woTk is contracled, show NONE. 7 F -t 2 3 4 Awa f d Contract if^tramber C 0 rit r act Witt) Estimiated Compk:Wbon Date Total C'ontract Price Uncomfacet ed DoHaf Value it Forn is the Prinie. Cont"aclo; Po„, ncernpleteld Doft Value of pians is, the Subcontractor TotM Value of All Work Am jurulaTed Tol"'Its Part 111, Awards Peridingi and Uncornpletrecl Work to be done with your own forces. List below the uncompleted dollar value of work for ead,i contract and awapds pending to be can ilpleted with YOUr OWT) fOICCs All work Accl,,mllji subcontracted0 to -ters will be listed on the reverse at this lorrn In a jow �verltur(�, 1pst only 1hapom l on olAht, work to loradone by youf I DIMS company, H no wr4 is conlmcled, stww NONE. Earthwork . ...... . .. . Porilind Cernent Concrete Piving HMA Plant Mix .......... .... ........ . .............. A_..... IMA Paving ........... ........ Clear) & Seal DracksOoinls Aggregate Bases &: Surfaces Highway, R R and Waterveay Structures Drainage Eledrical C mu a r 0 Baal ` Cual s . . ....... ...... Concriele Conslnxfiorl .1 13.2 33 . .......... . .. . ....... Fencing . . . . . ....... — ----- Gul'ardIail Painting sigNng Cold Milllng, PIafwi4,tg & RotomillIng DeR10400n Paveflwn,4 Markrogs (Painl) . ........ . ........ CiVier Co rmV u cl iol r (I- isfl $ 0,00 Total's "*gad 7 -infonnMiori is REQUIRED tCr afeUelpliSill I'le statUR1"'Y 35 'l) tlw "Illinoms Frocurenivil, Gode", Falture 10 Comply WII result m norOssuance of an "Alili'lo6zalion I's Bid." I his forni has been approved by the Stale Fomm Manaqeirnent Center, Pitniled 6/22/2018 Page I of 2 B(C' 57 (Rclv, 08,117110) tart 111, Work Subcontracted lo Others. For cach contract described in flarl p, list all flic work you have subcontracted to Olhers , 2 4 =A"ww"'ds Pencting . . ..... . ........... rotai Uncompleted ----Lk.njt . . ....... .. 11, being duly sworn, do hereby declare that this affidavit m as true and conect statements relafing to ALI uncompleted contracls ok the Undersigned for Federal, State, County, City and private work, mcluding At. L subcontract warti , ALI pending tow Wds not yet awarded or rejec�ted and ALL. estimated cofnpletion dates. Subscribed and sworn to befoire me Ibis _ day of ... Type or Print Name ,)Ifw-c,r or Diredcw I iitle &gned ............ . . ...... --­--....---- ...... . .... Notary Pubhc My cornrnrssion expwes (Notary Seal) Company Addfess Printed &22/2018 Page 2 of 2 BG 5 7 (R: c v 09117 M 0) UIllinois Department of Transportation V) Buru,au of Cors,ri,uctkm 2300 Scmith Dirksoi Parewjff,Nxx: N 322 Sp64wgNMd Minom 62764 Part I. Work Under Contract strucflonsGornpietfam, ftvm by 1`4110 tyjl(Mi) W LM",4q Uar* ink, Use adtWaonaf fowns as needed la rst N1 veoqk List b0uwafl Work you have under coritract as e4her il prime conliactor or a subm.witraclor. I( is reqUired to intlude Wl pending pow bids not yet awarded or rejected. In a j0nt venture, list orify that portmn of (fie work Witch is the reSj)0n%It)iIitY C+i Y()nr COTTIPaJj)r, ITie uncompleted dotlar vafi.je ds to t)e based upon the most recerif crqinef,.,r's of ownefs estimate, and must include weak subcontracted to offier's If race work iscontracted, srmw NONE. .... . . . .— ........ .—I . .. . ........ . . ....... . ... ...... . .... 31 4 2 Awar Cof-Macl Number Contract Witt"i Estimated Completion Date Date TaW Conlracf Price AccUMUMed 46-345 'Totals "tk-Tlcolnoetelj f uitl ar V a I � u e 1N IF i r r Ti i the Prinie Contractor 345 ......... . .. .... . .................. . . Uncompleted DoHaf Vahie if Fimi r» Ore SubconIraclor m._._. ............... ToUal Value of A11 Work Part 11. Awards Pending and Uncompleted Work to be done with your own forces, . ........... . . . List below the unomipletedi doltar value of work for each contract arid awards pending to be corripleled with yorAt awn (mes, Alf mrk subcontracted to oftiers will be listed on thee ft e reverse of s, form, In a MIt joint Ure, pjsl only OnM porl1cm of Me work to be done by your Accumulated corny. H no work is contracted, show NONE Totals pan Earlhwork . ...... . ... Portland Concent Concrete Paving HMA Plant Mix HMA PaOing Clean & Seat Cracks!Jolnts Aggregate Bases Sumer es, I-Irghway, R, R- and Waterway SIrLictures Drainage Efedric,all .......... . . Cover and Seat Goals C'oncmlc Construclicirr Fencing (',;uardrajI painting Signing Cold Milling, flilarining & Rotorrulknq Demoiftiiotr - -- — --------- Pavealient Markrngs (Paint) — ......... . 0"ier Construdion (Ust) tAsctusure & thin mformation is REQUIRED to wcampfiOi the stalutory purpose as i.nuttined in the "llfinorq PrOCUrel To Bid," F aiILIFe 10 UYrT1$)IY Wit result rP'i Prinif,,d 612212018 Page 1 of 7 BC 57 (Rev, 08/ 17110) "'s , * 0 Part lit, Work Subcontracted to Others, For each conliract described in Pair, 1, fist all ffie wnfk you tvwc subconlracted to olhc4s ' 1 2 3 4 Awards Pending Subcon, dar ... . . .. . ...... F Type of Worta Subcontrad P6ce Amount Uncompleted ....... .. . Stibconlractor, l ype of W,)irk — ----- ....... .. Subcor1ract Prjo; Amoun'. Uncornolcied Subcontractor Type of Work . ... . . ...... Su Nxoniiu'wp Price --------------------- . . ...... . ....... Arnouni . . ........ subconlrador . ........... . --- Type of Wci* ..... ... . ....... Subcontract Price Uncompleted Subcontractm Type 0'M"v* . ...... . . .... . . . ..... 13ubconfrac A Pnce, Amount Uncompleted Total Uncompreted i - ---------- 1, being duly sworn, do hereby decW'e that this of is a true and correct statement relating to ALL uncompleted contracts ofthie undersigned for Federal, Stale, Counity, City and private work, including ALL. subcontract work, ALL pending low bids not yet awarded cir rejected arid ALL esfirnaled completion cares Subscribed arid sworn, to before rule* this-- day of Type or Prirnt Name Off *k,,r v Dircctw Tifle Signed Notary Public: My commjsson expires (Notary Seal) Company Addres;s PriMed 6122Q018 Page 2 of 2 BC 57 (Rev. 08117)10) UIllinois Department of Transportation VI 230Q SoWh Dvksen PwkWayArWn1 322 SpflngIioiki, Olim.ms 52764 Part I. Work Under Contract Affidavit of Availability For the Letting of 18-00169.00-1 T structions: CornpWte INS form by either typing oo usiong black ink "Aaftrizaltars' a Bid" will nO be i!5sued List b0ow all wod� you have Under conIract as ethel a p6nle cc)rdractcr Or a Subrxwdractor. Il is icquired to include M pending low bids not yet awarded or rejected. Nn -a joins veriture, lust only that portion of the wark wfilch is ffie iespm istility of your cornpany, The uncompleted dolWr value is Io be based upon It. 'nowolk is contracted, show NONIE. 2— 3 4 AwardsPentfing Contract Nurnber Contract W41h Estimated Cornplefioln D . at . 0 Jan. rly 20,1 Oov P A Accurnulated Total Conlract Pricp Totals UncornpIeled Dollar Value if Firm is the Phime Contifactor .. ............. . �—ncor�lj�l—eied Dollar Value il Firrn is PIC SLAbcontractor -l'otal Value of All Work Part 11, Awards Pending and U ricompleted Wor k to be done with your' own f w6s. Usf below the uncompleted dollar value of work for each coniiacl and awards pending to be con,)pleted wtifi, your own forces M Work AccUrnulaled subcontracted to oMers WH be listed out the reverse of fill$ form in a joint venture, kst only lhal portion n,,A the work to be done by your Totals company. It no work is contacted, show NONE, Earthwork . . . ..... . ........... . . . ......... HMA Plant Mix HMA Paving . .. .... .... . . .......... . ........ Clean & Seap Cracks/Joints . . .. ............ Aggregate Bases & Surfaces firghmy, R , wi<l Walemay Structures — — ------ --------------------- Drainage EIectdcaf . . . ............ Cover and Seat Coals Concrete Constfuction, ... ......... . ......... Landscaping — —_ ----------- Fencing Guardrad Painting ........................... &qning Cold Milling, Planning Rotorniffifl(j ......... . .. . . .......... . ........ . .............. Deniobbon . .......... Pavernent Markings (Pajnl) Olfk-f Construction (List) $ 0,00 LT I ILI I -I,-- -- 1--luvU I I U 4. ......... ...... Disclosure of ths �nfonnation is REQUIRED to acconli'lNsh t,w StMulory puril as ouflineWin the 1111inois Ptocluleirwrit (ode," Failure to cornply WO re saint in nomissuance of an `Aurhixizahorl To Bid " This form has been approved by Ihe State Fonns Managernenl Center, Printed 6122!120 18 Page I of 2 BC 57 (Rev. 08/1 V 10) Part RL WWrark Subcontracted to Others, For each contract decant d 'd n flr=art I, tuat all the work you have subcontracted Io rarh7e m, ° t ? 3 ul Awards Pending s utaconlr aclofAOht Tyrm of'tr"efa;rrk Subcontract iPrice __.. rw.ranraca'rnl ...� �.... .__�....__.._. tfrrccnrnnpp ted S utrcorntrac 0; Type ofWork Siubcnarq$o'acp Price Amount Uncompleted SubcrarIlf actc,r Type of Work su bcraantwa d h nee Amount Ur nrarnanwplOed m:....._ _�. �_.. ... ... :. ..._.mom .... m...� .____-.�_� ._.._w��. .........�.._.. ...�...-:•...—�•� ��.� ._�m��...��..m.��._...�._. ..i au�ccanlmawsa a'rr I'ype or Work ......... _..._ _ _... ._ ... _....._ Subcontract ru nai Amount U pc:curanplr led -------- i--- Subcontract ,uubconlrracloi Type rul Work uubco ntr act Price Amouni U nconipleted 1 rudral fprncompteled q„ being dnupy sworn, do hereby declare that thnts "affidavit is a true and carry c~i statement r6ating to ALL uncompleted contracts of the undersigned lo+ Federal, State, o�aacrty, r.Ay and private work, including At...L subcontract work, AU., pending J aw brd�z not yet awarded or rejeecied and ALLestimated crarrnpV tion datums, Subscribed aarnd sworn to before me anis dray c4` �w... .... ....�m. Type or 9 -'rant Narnne f;�'tp'oa.r;f sur rApr��+� trsr� "9�ltira Signed Nolo vy Faabb My commission exriires Company (fwl''aat ary Seal) Address Printed t 2,12,0trh Page Jit 2 s 57 (Rev, Mr'lf.t e"*.wa 11 Illinois Department of Transpl rtabon uaa air of Constraas ion :atia�laCa �mertealw ta4tlk.+.at �'aaay�rrr�wyaV��;arran .��«�' Cwpuarughnekir tlgl00i 62764 Part L Work Under Contract Affidavit of Availability For tete Crating of 18-0016q-004. T' serracticamns• Crffivprele lhis fom'i by sriM4m.r tNpng rm rx grog blaci rink `Au0iaarrea¢8irami to Bid" an h not be issued Onc s, t aqw &slm,„ of Thais eaarr'rn am r urnr14el d in Metas , Use ridd 1pornsl fa rmr 5 aa rneotlnd to Hsi all work. Lrst beim aiatll omk you,a Stave trnalw;rr Countraactas wmrtl'icr ,a Crreasarc cc+illiactin (sr a rr)tiwr„oritreI(Ioor 11 is required urea to include MI µrer"I�riprrg V way ikvids not yet awarded or ro,po od. In a joint venture, irsl only that portion cut the* work which is the,resplorra ibistun C4o Your company, The cunconayuletod dolair valtuum is Io be biased upon Vie mrorasl rcacnrtl engineet's or, owner..; dr,timnroatc, and must include work u��R��contcrJCkt�,n to rwt'degs, It ra wd wk l,. contraciled, show NONE. �.._... .....-.�._ ��� _�3 ��....._.._ 4 Contract Number Contract t^wrltta Es lint ated Cn rn A � q,Ni""4 �{�pyyr Total C.�ontr'artIII.'Iafcti 1'......... __.�r dln�adllc"Jitd�^�� Aur t olals Uncompleted alkm-., it Firm is the m Contractor Ltm'Icorra lc'lod Dollar ValtU9.a It Firm is to the corwlramICrr Stuia �.,,.ub ._...... � _ ......m......�,._.�. ... _.._..._74, 8 3 ......... .......m..........___... T olal a"apue of All Work Part Ill. Award's Ponding and Uncompleted Work to be done with your own toece . Lust bellow the uncompleted dollar value of work for each craritf� act and awv,auds pewndlnpl to he completed With yotmr owsrea fortes_ Alf vrork fwc w,a�rtaaalato�af talasonlrac�twd to ottaors uwulq da lu^tffad ort ltu rw: *rs,o of ttois tawmmroa. in ^a joint venture, llsl only that t odion of the work lo tarn' done by your Totals company, if no work is conlracted, showNC.t . Earthwork Pcidlantt CementC�onrrele t�'mavruag �..._.... ���� HMA Plant, Mix HIMA Paavlrmg ..__� .. _... .. _ _......._... ... _........ . ..... .. ....... _ _.......... .... CAean, & ^gal Cr ackswf frrinlsa .... _....... _ ...._ . __ _ . _ . AgsprogateBases & Suffaces �. Highway, R,.kt. and' Waterway Structures Drainage Electrical Cover and scal, Coats .... _.... .. _ ....... Concrete C onslructiaan Landsceup0g: Fencing d'.' wuarctrakll �.._._................ _.._ _... -._ _ _...... _....__.............. . painting fold tvlelllmrtt” 1lrannduroy A tdotrurt0enat Dernolotpon Pavement Markings w..fPaerrt) C'' 1her C,on. lru tioi (List) A� of T-1 __.�. �. .� m Eirstl'o,ature of this informaluon is REQUIRED to arcornpalistr the . zeutory purposfa as odlitned in ttrc lllrrmols Procrverna.rrt i.. ode., Faullme las cornp;aly vAlll result in non•-ussr ruoo of an "As.rttiorir.,aliaan t o E°3mai." This, tom,i has been approved by tyre. Stale Forms anaa eme'rrl Crintr: i Printed (3122J2018 Page T of 2 HC:. 57 (Hlev 08Y1 11 tip Part M Work Subcontracted to Others. For each r"itract desedbed 4) Part 1, rsl alt Ihe voork you have subc(:' naraded to offiers ' .... . .... ..... 1 2 3 4 Awards Pending oil Subcorftao', Type of Wo of k Subo,.)nlrad Price Amount Uncon'iplele(,t Subcornrac(or Type of Work -- - - - - ---------- ------ Subconitact Nice Amount Jncon'ipieted Subcontrartoi Type oi Work - --- — ------- - ----- — - — - - - - ------------- - ------ - ----- Subcontract Price . ........ . ..... ..... Aji'iounl Unconiptetod Su bcoarutractor I ype ol'Worir Subcontr'act iarPa .. . ......... . . .......... A'"OtJr1l Un,c,amplEqed sw)corltractor r,= — — --------- - Type rat 'Wroan I Su,bcvitracl Nice Amount UncorrrpMed t I otal Oxonipleled 1, b6ng dWy sworn, do hereby declare that this affidavd is a true and correct statenient relating to ALL uncompleled contracts ofthe undersigned for Federal, Sate, County, City and private work, including ALL subcontract work, ALL pending low bids not y award or rejected and ALL estimated completion dates Subscribed and sworn, to befr)re nrre thiis day of Nolary Flubk My cornn*�,sion expires (Notary Seal) Type or Piiinl Name ww Officef o5 Drectv Tote &CIned Address Pentad 612212018 Page 2 M 2 BC, 57 (Rev 08117110) F of Transpbdabon oureau of constiiuctx"�rl 2100 SmAl"N Dirksen ParkwayMnorn, 322 Spmqfbeid, HMOs 62764 Part L Work Under Contract slnjcfinns. C'civ�plete "us fovn by florid typing cm usmg b4ack mk 'Aulhc�mzafion lc) Riid" wM nol rjo Q,suact tcgh Sides of I hr.a fiwm aw cfiropleled nn team l Use addi I ional forms as needed tci 60 afl wwk List beiCM all YA)FK YM haV(', Ufldef c.or-Macl as eilher a PrIRTW CorMzlctul w as subcooll actor, R is io4uired to include M penMnq ImN, bids r'W'If yet awarded (,)r rclected In a joint venlure, list only that portion of the work y6ch rs the re.+�onsibfljfy cut ycArr company, The uncomplOed dollar value rs to be, based upon the rnoM recent engpnee( S or ownem estimate, and must In(ludo wark, to others if no woO, is contracted, show NONE. ('xnitad Number Contiacl Mh -MI Estiniated Completion Date . ....... . . IMM Contract Price iT, -completed Botlai Value K Firrn is the Prime Contractor Uncompleted DOW Value if F'iirm is flie Subcontractor 1 99 to ,i 4;;. 4 Total Value of AM Work Part IL Awards Pending and UncornpMed Work to be done With your own tortes. List below the uncompleted dollar valuta of weak torearch conVacl andzwards pendia g to be compleled with your own f0rCeSr Ail woik cmrnpany- 11 no work is contracted, show NONEI Earthm.)rk Portland Coment Concrete Paving HMA Plant Mix HM,A Paving . . . ...... . Ctearl Seal Cracks'Joints . . ... . ........ ........ Aggregate Bases & Surfaces, - ---- . .... . ..... ... . ...... . ....... . ... Highway, R R, and Warterway Structures . .. . ........... . Drainage ... ....... ............ . .. Hertilicall . ......... . ...... . ........ Cover and Seal Coats Conciete Construction Landscap4ig . ... . ...... . . .......... . .. . . ........ l"encing Guardrarl . . . . . . ................... PaiMirig Signing Cold Miffing, Planning & Rotom4fing [)emollition . . . ...... . ... . . ........... . . Pavernent Markings (Pairril) Other Coristruchon (t.1st) ACCUII)Llilated 70tMs Accurnulatied T otah'i ............................. Dlscloscrre M this inforniation is REQUIRED to accompWi 011,", Statutory prippose as outline un the Illinois Procurenwril Code " Failureto ccrmplywrfl renuft In t ion. rssuance of an "Authoirizalion'To B,id " Ihm form, has bcvn approvctd by the State Fornis Management Centerr. Printed 6122120 18 Page I of 2 BC 57 (Rev, 0& 17110) Part M. Work Subcontraded to Others. For each coMad descnbcd 41 Pad 1, gist W Vic work you Nave subcontvWcd lo ofl"iers, ' TOM Uncompleted ..... . . . .... . ........ 1, Ibeung duly swom, do hereby declare that tNs affidavR is as true and rux'ect statement relating to ALL Uncompleted contracts of the Undersigned for Feder &, State, County, 01y and private work, inckj&ig ALL subcontract work, ALL pending Ilow bs not yet awarded or rejected arid ALL. esfiniated completion dates, Subsc6bed and sworn to before me this _2_o. day of Type or Mint Narne Signed '—�Nulvy flublw my canim*s= exp"'es Company � OF F [i _,SL al JULE FELSK� Address NOTARY PUBUC ,',�'rATE ')F UJN0K,,k MY COMWO,&N EXPIRE,.,", 121& 1 0 r )i P clvtL t", -- FIf Prited 6)22Q01 B Page 2 of 2 SC'� 57 (Rev, 108117,110) 1 3 4 AwarcJs Penchm Subcontractor .2 . . ........ . ..... .......W_. J - Type of Work i Subcontract F"Ifice .. Arnount . .... ....... ............ . Unconipleled .......... . . .... Subcontraclor Type of Wo rk ............. . .......... .. .............. Subrontract Pricp . . . ............. .. . ..... . Arnaud . . . .......... . .... . ................ . . ............. unconlipleted ---L .. . .. . ..... . ..... -- — . . ......... . ...... SLibcoalradar Fype of VV0fk . . .......... Subcorqract Prim- Arnouni Linc enipleled . ..... .. ........ . . . . ........ Subcontractor Ty pe of Wo rk subc�ordrac( price Arnoud Uncompleted Subconlraclor — - ------------ T yp e of Work F— Subcontrart trice jno un I Uncompleted TOM Uncompleted ..... . . . .... . ........ 1, Ibeung duly swom, do hereby declare that tNs affidavR is as true and rux'ect statement relating to ALL Uncompleted contracts of the Undersigned for Feder &, State, County, 01y and private work, inckj&ig ALL subcontract work, ALL pending Ilow bs not yet awarded or rejected arid ALL. esfiniated completion dates, Subsc6bed and sworn to before me this _2_o. day of Type or Mint Narne Signed '—�Nulvy flublw my canim*s= exp"'es Company � OF F [i _,SL al JULE FELSK� Address NOTARY PUBUC ,',�'rATE ')F UJN0K,,k MY COMWO,&N EXPIRE,.,", 121& 1 0 r )i P clvtL t", -- FIf Prited 6)22Q01 B Page 2 of 2 SC'� 57 (Rev, 108117,110) R RN WITH BID ,ETU Fo-�.- ,� E� Route Randview Highlands County Cook Local Agency Mount Prospect Section, 18 -00169 -00 -1 -1 - PAPER BID BOND WE THONE RELECTRIC, INC,, P,O. Box 321, Wheaton IL 60187 as PRINCIPAL, and I nSU ran ce Qt qjpg!py 'L a5C purier uft SURETY, � Z-'_Qf,_�5_ ­�, Q, Madison WI 53717 as are held Jointly, s0vor*yand 11frifly bound unto the above Local Agency (hereafter referred to as "LA") In 1110 penal sto'n of 5% of the total bid price„ or for the aniount spedried in the proposal documents in elfect on the dale of Invitation for b0s Whichever Is the lesser won, We bind ourselves,, rtur heirs, (weculdrs, adrWnWrL, fors, supessots, and assigns, Johtly pay to the LA this surn under the condMons of this instrument. VV11FRFASTHE CONDITION OF14 1E f"OREGOMG OBLIGATION N38k)Gid that, the said PRINCIPAL is subnAting a written proposal to the LA acflng through its awarding authority for the construction of Inc work designated as the above section. THERIE-F ORE If li* pi uposat Is accepted and a contract awarded to the Pd~ INCiPAL by Ilia LA for the above designated secHar, and the PRINCIPAL shall wiffiln fifteen (16) days after award entesr Into as fonnal Contract, furnish surely guaranteeing the faithful polormance of the work, ard furnish eviderrce of the oequired Insurance coverage, all as provided In the "StIandaid Specfficatlon,,afoi Road and JI Constructioti" and applicatle Suppleruenlal fapeclflcanons' than tlls, obligation shall becorre vold; otherwise it shaft rwnaln in full force and affect, IN THE FWAI'lite-l-A 0ptaro1nos the KONGIPAI, has W10 toeoter h')iu a formal conlraci in -compliance with any requiromerils sot forth In the, preceding paragmph, then the IA acting ffirough Its awarding authority shall hnniedlatoty be entitted to recover the full penial surn set ouf above, logettlar with all court =As, all attorney facs, and any officr cxpt.mse of recovery, IN TESTMONYWHEREOE , the said PRlNGIFIAL Brad thio said SURETY have caused this Instrument to tae signed by their respective officers this 20th__ dayof 20,18' Principw THORNE ELECTRIC, INC, npany Namel (Conspany Name) 5y� k N1, Al'r' J By . .... �JCII , SAJIS V� or ur6andllfla) V;(f V (Slgnalure and Title) r qf"l e .3;8 ,7 10 venture (If f'RINCALIsajo veniure of two or more contractors, the company names, and authorized signatures cfeach contractor must be at"fixied.) Surety West Bend Mutual Insurance Cornpany By� (Name of SmIrety) (S Igna(Zo 're of —M lorne—yY1 STATE OF ILLINOIS, Ta Anna Marie Garrod, Attorney -in, -Fact COUNTY OF --])i P2 1. , a Notary Public In and for said county, do hereby cedify that �LOHA -M011-410 ( I'VeJ n 11 nPLA1 Phi/ C; two I (i k irba ea nan'ses, oi Inametrais srgning on nenim ci MIINUTVAL, OJSUHt- I Y) whoare each personally known to me to he the same persons whose narnes are subscribed to the foregoling instrument on behallfofPRIINCIPAL and SURf-TY, appeared before neo this day In person and ucknowtodged respectively, that they signed and delivered said Instruments as their free and voluntary act for the uses and Purposes therein set forth, Chen under arty hand and notarial seal this: 0 11, , My cornmission expires IL. I to JJJI-E FI �''J ELECTRONIC BID BOND [3 Electronic bid bond Is allowed (box inust be checked by LA If electronic bid bond Is allowed) The Principal may submit an electronic bid bond In lieu of completing the above section of the Proposal Bid bond Form. By providing an electronic bid bond ID code and signing below, the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firaily bound unto the LA tinder the conditions of the bid bond as, shown: above. (If PRINCIPAL is a joint venture of two or rnore contractors, an electronic bid bond ID code, company/bidder narne title and date must be affixed for an ch contractor In the venture.) Mectrofgb Old Bondi ID Code Page 1 of I Printed on 6/22/2018 10:07:55 AM (Company0d,der Name) (signature and Title) Date BLR 12230 (Rev. V015 Acknowledgment of Corporate Surety ;iTATE OF Illinois ss County of DiuPaige On this, 20th day of August 20 18 , before me appeared Anna Marie Garrod to me personally known, who being by me duly sworn, did say that tie/she Is the aforesaid officer or attorney in fact of the West Bend Mutual Insurance Company, a corporation; that the seat affixed to the foregoing instrument is the corporate seal of said corporation, and that said instrument was signed and sealed on behalf of said corporation by the aforesaid officer (or Attorney -in -Fact), by authority of its Board of Directors; and the aforesaid officer (or Attorney -in -Fact), acknovAedged said instrument to be the free act and deed of said corporation. My Commission Expires garret. J Pakel Notary Public September 8 20 1 County of DuPage state of Ilfinois, — IMICHIGAN ONLY, This policy is exempt from the filing requirements of Section 2236 of the Insurance Code of 1956,1956 PA 218 and MCL 5001236. 0 FFICIAL S,E,AL SS= � PAKEL C State oI 7 ar Notary PubliC, State 09/08�/21 co,mmission EXPif"96 N8 0017 111 17 P0 Box 620976 [ Middleton, W11 53562 1 Phoiw (608) 410-3410 1 Fax: (877) 674-2663 1 wwwAhesherfining,com I �, I WESTGEND A MUTUAL INSURANCE COMPANY' T'H�E SILVER LIhal ING11 mffl��� Know all men by these Presents, That West Bend MLutual Insurance Company, a corporation having its principal office in the City of West Bend, Wisconsin does make, constitute and appoint: ANNA MARE ROD lawful Aftorney(s)-in-fact, to make, execute, seal and deliver for and on its behalf as surety and as its act and deed any and all bonds, undertakings: and contracts of suretyship, provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed in amount the surn of: Seven Milficin Five Hundr-ed Thousand Dollars, 1,$7,500,000) This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted Lay the Board of Directors of West Bend Mutual Insurance Company at a meeting duly callled and held on the 211, day of December, 1 999, Appointtru,,,nt The president,oran " y vice president, or oaY �)J)wrolficer�,af �Vest Bend Mutual I nsto-once (.."ornpony InuY otq)oolt by writte'n certificate A ttorne.Vs- I wktct to act on beh(dfol'the coin)pattv in the execution qj'ond attestitio of honds and undertakings and other written ohlipatory instrutnents of hhe nator(;�. Thesrynuture ol"anof y ficerauthorized hereby erred the corpolute Saul lnaY be (11fixed, h1v limsimile to ony sfjch Power arI"attornQ,r or to on'y cerlijkatf,� relotiqg ter--rclore, 01rd any such powerol ottorne,y or, certificutt! lwarOqj such fiqlcshrole S�notlo-es orfacsimile see) shall bc�von lid ad bindhql upon the compon , Y, and only'such powerso execute"'d ond certi/ff,�!d by fico and fucsirit de seal ,Judl be valid cornedbinding capon p the cornpal'tv in thefiltur(,� I'Vith respect to e:iqy hond or ander taking or other ivriting ohliqalory in natur(,-r to which it is attoched. Airw such (,ippointment rrio.Y be revoke(), for couse, or without cause, by un.ysaid officerat arrays Faroe, In witness whereof, the West Bend Mutual Insurance Company has caused these presents to be signed by its president undersigned and its, corporate seal to be hereto duly attested by its secretary this 22nd day of Betember, 2017. Ati�estfluirtr,Iii i C, ....... .......................... ...—� CORPORATI* Kevin A. Steiner Chrislopber .". ✓Z ygart 'A 'AL Secretary SE ,lie f, 1;xec N1diva offjtcr/ presicletit _%L11F State of Wisconsin County of Washington On the 22nd day of September, 2017, before me personally carne Kevin A, Steiner, to me known being by duly sworn, did depose and say that he resides in the County of Washington, Slate of Wisconsin; that he is the President of West Bend Mutual Insurance Company, the corporation described in, and which executed the above instrun-wnt; that he knows the seat of the said corporation; that the seal affixed to said instrument is, such corporate seali that is was so affixed by ordler of the board of directors of said corporation and that he signed his name thereto by like order, .......... juli A I neduni Senior 'orporate Attorney Notary Poblic, Washington Co., W1 My Commission is Permanent The undersigned, duly elected to the office stated below, now the incumbent in West Bend Mutual Insurance Company, a Wisconsin corporation, authorized to make this certificate, Do Hereby Certify that the foregoing attached Power of Attorney remains in full force effect and has not been revoked and that the Resolution of the Board of Directors,, set forth in the Power of Attorney is, now in force. Signed and sealed at West Bend, Wiscons,in this 20th daiy of august 2018, 7— Tor )u— SHAL Headier Dunn 11P Vice President — CI)icf Financi.,d Officer Notice: Any questions concerning this Power of Attorney may be directed to the Bond Manager at NSI, a division of West Bend Mutual Insurance Company, 19011 S 18,11vc, 4's vsu hvml, W11 5V)l 6 ph (2iP2) 1,34 617W I I 4010,1)6�^aW t n'xx (262) 16K-5(6 Page 1 of 3 https://www.boarddocs.com/il/vomp/Board.nsf/files/B4684J732BC8/$file/PHOTO%20OF%20RA... 9/7/2018 Page 2 of 3 https://www.boarddocs.com/il/vomp/Board.nsf/files/B4684J732BC8/$file/PHOTO%20OF%20RA... 9/7/20 Page 3 of 3 https://www.boarddocs.com/il/vomp/Board.nsf/files/B4684J732BC8/$file/PHOTO%20OF%20RA... 9/7/2018