Loading...
HomeMy WebLinkAbout8.3 Motion to Accept Proposal from Delta DemolitionBoardDocs® Pro Page I of 2 Agenda Item Details Meeting Jun 19, 2018 - REGULAR MEETING OF THEM UT PROSPECT VILLAGE BOARD - 7:00 p.m. Category 8. VILLAGE MANAGER'S REPORT Subject 8.3 Motion to accept a proposal from Delta Demolition, Inc. to demolish the Village -owned properties at 19 and 21 S. Emerson Street in an amount not to exceed $71,000. Access Public Type Action Preferred Date Jun 19, 2018 Absolute Date Jun 19, 2018 Fiscal Impact Ye.2 Dollar Amount 71f000.00 Budgeted Yes Budget Source TIF Funding Recommended Action Accept a proposal from Delta Demolition, Inc. to demolish the Village -owned properties at 19 and 21 S. Emerson Street in an amount not to exceed $71,000. Public Content Information The Village completed the purchase of the two residential properties at 19 and 21 S. Emerson Street on May 31, 2018, for the purposes of a park/open space for the Downtown. While under contract to purchase, staff advertised and issued a bid opportunity for the demolition of the existing single-family homes and flat restoration of the sites on May 25, 2018. On June 1, 2018, a walk-through and open house was held for interested demolition contractors. Alsit, on this day, the Village had environmental consultants on site to perform an environmental survey of the existing properties. This survey was received on June 5 and was provided to the contractors in attendance at the open house. Seven contractors submitted bids on June 7, 2018 and the results were as follows: Delta Demolition Salman Builders Albrecht Enterprises M 0 Dynamic Contracting McDonagh Demolition ,American Demolition https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 6/21/2018 BoardDocs® Pro Page 2 of 2 Delta Demolition has a long history of successful demolition projects throughout the northwest suburbs and City off Chicago. They are listed as a Class A Demolition firm with the City of Chicago, which is the highest qualification level *ffered by the City. After discussion with the contractor, staff is confident the scope of work is covered with this proposal and that the contractor can meet the timeframe to demolish these two properties and restore with grass seed and erosion control blanket before the start of Block Party in July. If this proposal is approved, Delta Demolition is prepared to begin the environmental remediation by June 25, at which time a construction fence will also bc erected. In related matters, the Community Development Department released an RFP for a .33 acre "Edwin and Elsie Meyn Busse" pocket park for this site. The RFP was released on June 11 and requires a public involvement component, as well as final design and construction cost estimates. The RFP closes June 29 at 5 PM. Alternatives 1. Motion to accept a proposal from Delta Demolition, Inc. to demolish the Village Owned Properties at 19 and 21 S. Emerson Street in an amount not to exceed $71,000. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends a motion to accept a proposal from Delta Demolition, Inc. to demolish the Village Owned Properties _?t 19 and 21 S. Emerson Street in an amount not to exceed $71,000. 1 8 .".1. 1, 7 (5) 9 S r ii -s o in Asbes-�.:-os SUiI,Vrey 8 0 6 0 �5, d �f: 8 ".11. 3 IIS 8 1 ..1. 1, 7 (5) 2 ".11. S t"n e iii -s o inIli Asbes-i.:-os SUiii ,Vrey 8 0 6 0 5, d f: 7 7 0 IIS III;eIII ia e ten o III i i i ii III:.3 i d G- �f , IIS III:.3) Administrative Content Minor edits. Added the notation that we have released an RFP for Park Design. NB Executive Content Motion & Voting Accept a proposal from Delta Demolition, Inc. to demolish the Village -owned properties at 19 and 21 S. Emerson Street in an amount not to exceed $71,000. Motion by Paul Hoefert, second by Michael Zadel. Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 6/21/2018 TRUENORTH C 0 N S U L T A N T S June 5, 2018 Mr. Mark Rysavy Village of Mount Prospect 50 S. Emerson Street Mount Prospect, IL 60056 Subject: Pre -Demolition Asbestos Survey 19 S. Emerson Street - Mount Prospect, Illinois True North Project No. T118376 Dear Mr. Rysavy: 1000 East Warrenville Road, Suite Ido Naperville, Illinois 60563 P : 630 717 2880 F: 630 689 5881 mail@consuittruenorth.com True North Consultants, Inc. was retained by the Village of Mount Prospect to conduct a pre - demolition asbestos survey of the single-family residential structure located at 19 S. Emerson Street in Mount Prospect, Illinois (Site). Survey services were provided by an Illinois Department of Public Health (IDPH) licensed Asbestos Building Inspector (Roy W. Bass, License No. 100-19144) on June 1, 2018. The purpose of the survey was to determine the asbestos -content of suspect asbestos -containing materials associated with the structure prior to planned demolition activities. A total of fifty- four (54) samples were collected during the sampling event. The bulk samples were submitted to a National Institute of Standards and Technology (NIST), National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory for analysis (Eurofins CEI, Inc. - Accreditation No. 101768-0). The bulk samples were analyzed for asbestos content in accordance with the procedures for Polarized Light Microscopy (PLM) with dispersion staining, contained in the Environmental Protection Agency (EPA) Method for the Determination of Asbestos in Bulk Building Materials (EPA/600/R-93/116). Results of sample analysis were reported as a percent composition. The following is a summary of PLM analytical results for sampled materials: n NENVIRONMENT: INFRASTRUCTURE: DEVELOPMENT Table 1: Summary of Findings — Suspect Asbestos -Containing Materials 19 S. Single -Family Residential Structure Emerson Street, Mount Prospect, Illinois ]gggg&k__ Material Description Sample Location(s) Estimated Asbestos Number(s) Quantity Content Textured Ceiling B19 -C-1,2,3 Located within the kitchen and first floor 200 Square Feet None hallway and bath. Detected Sheet Flooring — Yellow B19 -D1,2,3 Located in the first floor kitchen and hallway 160 Square Feet 25% Geometric Pattern under wood (top layer). Chrysotile Sheet Flooring — Stone 619-E-1,2,3 Located in the first floor kitchen, hallway and 460 Square Feet 25% Pattern family room (middle layer). Chrysotile Sheet Flooring — Green, 619-F-1,2,3 Located in the first floor kitchen and hallway 160 Square Feet None Yellow and White (bottom layer). Detected Sheet Flooring — Smooth 25% Stone Pattern 619-G-1,2,3 Located in the first floor bathroom. 30 Square Feet Chrysotile 9"x9" Floor Tile and 1319-H-1,2,3 Located on the second floor at the north 150 Square Feet None Mastic — Tan w/ Brown side. Detected 9"x9" Floor Tile and 1319-1-1,2,3 Located on the second floor at the south 150 Square Feet None Mastic — Brown w/ White side. Detected 9"x9" Floor Tile and 1319-J-1,2,3 Located in the second floor bathroom. 30 Square Feet None Mastic — Tan Marble Detected 12"x12" White Floor Tile — 1319-K-1,2,3 Located in the second floor closet. 10 Square Feet None Peel and Stick Detected Drywall and Joint B19 -L-1,2,3 Located in the basement. >1,000 Square None Compound Feet Detected Panel Adhesive B 19-M-1,2,3 Located in the basement and family room. >1,000 Square None Feet Detected 12"x12" Floor Tile & B19 -N-1,2,3 Located in the basement. 400 Square Feet None Mastic — White w/ Tan Detected 12"x12" Floor Tile and 1319-0-1,2,3 Located in the basement laundry room. 350 Square Feet None Mastic — White w/ Grey Detected Roofing Shingles B 19-P-1,2,3 Located on the roof of the house and shed. >1,000 Square None Feet Detected Window Caulk 1319-Q-1,2,3 Located on the edges of the aluminum 20 Windows 5% Chrysotile windows. Window Glazing 1319-R-1,2,3 Located between the frame and the glass on 10 Windows 2% Chrysotile the wood windows. The scope of sampling was limited to the aforementioned materials only. In the event that additional suspect asbestos -containing materials are identified during planned demolition/renovation activities additional testing may be required. Any quantities of material identified within this report are solely intended to be estimates and are not intended to be exact. The Environmental Protection Agency (EPA) defines asbestos -containing materials as those materials that contain greater than 1% asbestos. Based upon the results of analysis, asbestos -containing materials were identified at the subject Site. Due to the health effects associated with asbestos exposure, various federal, state and local agencies have promulgated standards and regulations for the performance of asbestos-related Pre -Demolition Asbestos Survey I T118376 16/5/2018 1 Page 2 n NENVIRONMENT: INFRASTRUCTURE: DEVELOPMENT activities. Specifically, asbestos -containing materials at the Site may be regulated by the Occupational Safety and Health Administration (OSHA), Environmental Protection Agency (EPA), Illinois Department of Public Health (IDPH) and other local agencies. In that asbestos - containing materials were identified at the Site, the aforementioned asbestos regulations may apply to the removal and disposal of identified materials. Enclosed with this letter are copies of analytical results. If you have any questions regarding this report, or if we can be of further assistance, please contact us at your convenience. Sincerely, TRUE NORTH CONSULTANTS Michael D. Brennan Senior Project Manager Enclosures: Laboratory Analytical Report Pre -Demolition Asbestos Survey I T118376 16/5/2018 1 Page 3 tiff eurofins CEI June 5, 2018 True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 CLIENT PROJECT: 19 S. Emerson CEI LAB CODE: A18-5703 Dear Customer: Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on June 4, 2018. The samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600 Method. Sample results containing >1% asbestos are considered asbestos -containing materials (ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1 % asbestos by weight as determined by visual estimation. Thank you for your business and we look forward to continuing good relations. If you have any questions, please feel free to call our office at 919-481-1413. Kind Regards, Tianbao Bai, Ph.D., CIH Laboratory Director INVt (R) TESTING NVLAP LAB CODE 101768-0 730 SE Maynard Road • Cary, NC 27511 • 919.481.1413 tiff eurofins CL, ASBESTOS ANALYTICAL REPORT By: Polarized Light Microscopy Prepared for True North Consultants, Inc. CLIENT PROJECT: 19 S. Emerson LAB CODE: A18-5703 TEST METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 REPORT DATE. 06/05/18 TOTAL SAMPLES ANALYZED. 42 # SAMPLES >1 % ASBESTOS: 6 TEL: 866-481-1412 www.ceilabs.com %%eurofins PROJECT: 19 S. Emerson Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 LAB CODE: A18-5703 ASBESTOS Client ID Layer Lab ID Color Sample Description % B19 -A-1 A21080A White Plaster None Detected A21080B White Sheetrock None Detected B19 -A-2 A21081A White Plaster None Detected A21081 B White Sheetrock None Detected B19 -A-3 A21082A White Plaster None Detected A21082B White Sheetrock None Detected B19 -B-1 Layer 1 A21083 White,Beige Ceiling Tile None Detected ------------------------ Layer 2 A21083 ---------- Brown ------------- Adhesive ---------------- • B19 -B-2 A21084 Sample Not Analyzed per COC B19 -G-3 B19 -B-3 A21085 Sample Not Analyzed per COC Sample Not Analyzed per COC A21101A B19 -C-1 A21086 White Textured Ceiling None Detected B19 -C-2 A21087 White Textured Ceiling None Detected B19 -C-3 A21088 White Textured Ceiling None Detected B19 -D-1 A21089 Yellow, Geometric Sheet Flooring MMEMOM B19 -D-2 A21090 Sample Not Analyzed per COC B19 -D-3 A21091 Sample Not Analyzed per COC B19 -E-1 A21092 Stone Pattern Sheet Flooring • B19 -E-2 A21093 Sample Not Analyzed per COC B19 -E-3 A21094 Sample Not Analyzed per COC B19 -F-1 A21095 Green,Yellow White Sheet Flooring None Detected B19 -F-2 A21096 Green,Yellow White Sheet Flooring None Detected B19 -F-3 A21097 Green,Yellow White Sheet Flooring None Detected B19 -G-1 A21098 Stone Pattern Sheet Flooring • B19 -G-2 A21099 Sample Not Analyzed per COC B19 -G-3 A21100 Sample Not Analyzed per COC B19 -H-1 A21101A Tan,Brown Floor Tile None Detected A21101 B Yellow Mastic None Detected B19 -H-2 A21102A Tan,Brown Floor Tile None Detected Page 1 of 3 %%eurofins PROJECT: 19 S. Emerson Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 LAB CODE: A18-5703 ASBESTOS Client ID Layer Lab ID Color Sample Description % Page 2 of 3 A21102B Yellow Mastic None Detected 1319-1-1-3 A21103A Tan,Brown Floor Tile None Detected 1319-L-2 A21103B Yellow Mastic None Detected 1319-1-1 A21104A Brown,White Floor Tile None Detected 1319-M-1 A21104B Yellow Mastic None Detected B19-1-2 A21105A Brown,White Floor Tile None Detected 1319-M-3 A21105B Yellow Mastic None Detected B19-1-3 A21106A Brown,White Floor Tile None Detected A21106B Yellow Mastic None Detected 1319-J-1 A21107A Tan,Marble Floor Tile None Detected A21107B Yellow Mastic None Detected 1319-J-2 A21108A Tan,Marble Floor Tile None Detected A21108B Yellow Mastic None Detected 1319-J-3 A21109A Tan,Marble Floor Tile None Detected A21109B Yellow Mastic None Detected 1319-K-1 A21110A White Floor Tile None Detected A2111013 Clear Mastic None Detected 1319-K-2 A21111A White Floor Tile None Detected A21111 B Clear Mastic None Detected 1319-K-3 A21112A White Floor Tile None Detected Page 2 of 3 A21112B Clear Mastic None Detected 1319-L-1 A21113 White Drywall/Joint Compound None Detected 1319-L-2 A21114 White Drywall/Joint Compound None Detected 1319-L-3 A21115 White Drywall/Joint Compound None Detected 1319-M-1 A21116 Yellow Panel Adhesive None Detected 1319-M-2 A21117 Yellow Panel Adhesive None Detected 1319-M-3 A21118 Yellow Panel Adhesive None Detected 1319-N-1 A21119A Red Floor Tile None Detected A21119B Yellow Mastic None Detected 1319-N-2 A21120A White,Tan Floor Tile None Detected A21120B Yellow Mastic None Detected Page 2 of 3 %%eurofins PROJECT: 19 S. Emerson Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 LAB CODE: A18-5703 ASBESTOS Client ID Layer Lab ID Color Sample Description % 1319-N-3 A21121 White,Tan Floor Tile None Detected A21121 B Yellow Mastic None Detected B19-0-1 A21122A White,Gray Floor Tile None Detected A21122B Yellow Mastic None Detected B19-0-2 A21123A White,Gray Floor Tile None Detected A21123B Yellow Mastic None Detected B19-0-3 A21124A White,Gray Floor Tile None Detected A21124B Yellow Mastic None Detected 1319-P-1 A21125 Red,Black Roofing Shingle None Detected 1319-P-2 A21126 Red,Black Roofing Shingle None Detected 1319-P-3 A21127 Red,Black Roofing Shingle None Detected 1319-Q-1 A21128 White,Gray Window Caulk • 1319-Q-2 A21129 Sample Not Analyzed per COC 1319-Q-3 A21130 Sample Not Analyzed per COC 1319-R-1 A21131 White Window Glazing • 1319-R-2 A21132 Sample Not Analyzed per COC 1319-R-3 A21133 Sample Not Analyzed per COC Page 3 of 3 ti%eurofins CEI Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5703 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous % 1319-A-1 Plaster Heterogeneous 5% Cellulose 10% Paint None Detected A21080A White 70% Calc Carb Fibrous 15% Binder Bound A21080B Sheetrock Heterogeneous 10% Cellulose 80% Gypsum None Detected White 10% Binder Fibrous Bound 1319-A-2 Plaster Heterogeneous 5% Cellulose 10% Paint None Detected A21081A White 70% Calc Carb Fibrous 15% Binder Bound A21081 B Sheetrock Heterogeneous 10% Cellulose 80% Gypsum None Detected White 10% Binder Fibrous Bound 1319-A-3 Plaster Heterogeneous 5% Cellulose 10% Paint None Detected A21082A White 70% Calc Carb Fibrous 15% Binder Bound A21082B Sheetrock Heterogeneous 10% Cellulose 80% Gypsum None Detected White 10% Binder Fibrous Bound 1319-13-1 Ceiling Tile Heterogeneous 95% Cellulose 5% Paint None Detected Layer 1 White,Beige A21083 Fibrous Bound Page 1 of 11 ti:*W* eurofins CLw Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab ID Description -------------- Layer 2 Adhesive A21083 1319-13-2 Sample Not Analyzed A21084 per COC Lab Attributes ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5703 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 NON -ASBESTOS COMPONENTS ASBESTOS Fibrous Non -Fibrous % Heterogeneous 5% Cellulose 93% Mastic Brown Fibrous Bound 1319-13-3 Sample Not Analyzed Heterogeneous 20% Paint None Detected A21085 per COC White 70% Calc Carb 1319-C-1 Textured Ceiling Heterogeneous 20% Paint None Detected A21086 White 70% Calc Carb 1319-D-1 Sheet Flooring Non-fibrous 10% Binder A21089 Bound 15% Binder 1319-C-2 Textured Ceiling Heterogeneous 20% Paint None Detected A21087 White 70% Calc Carb 1319-D-2 Sample Not Analyzed Non-fibrous 10% Binder A21090 per COC Bound 1319-C-3 Textured Ceiling Heterogeneous 20% Paint None Detected A21088 White 70% Calc Carb Non-fibrous 10% Binder Bound 1319-D-1 Sheet Flooring Heterogeneous 20% Cellulose 40% Vinyl • A21089 Yellow, Geometric 15% Binder Fibrous Bound 1319-D-2 Sample Not Analyzed A21090 per COC 1319-D-3 Sample Not Analyzed A21091 per COC Page 2 of 11 ti:*W* eurofins CLw Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5703 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 IClient ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS I Lab ID Description Attributes Fibrous Non -Fibrous 1319-E-1 Sheet Flooring Heterogeneous 20% Cellulose 40% Vinyl • - A21092 Stone Pattern 15% Binder Fibrous Bound 1319-E-2 Sample Not Analyzed A21093 per COC 1319-E-3 Sample Not Analyzed A21094 per COC 1319-F-1 Sheet Flooring Heterogeneous 30% Cellulose 50% Vinyl None Detected A21095 Green,Yellow 20% Binder White Fibrous Bound 1319-F-2 Sheet Flooring Heterogeneous 30% Cellulose 50% Vinyl None Detected A21096 Green,Yellow 20% Binder White Fibrous Bound 1319-F-3 Sheet Flooring Heterogeneous 30% Cellulose 50% Vinyl None Detected A21097 Green,Yellow 20% Binder White Fibrous Bound 1319-G-1 Sheet Flooring Heterogeneous 20% Cellulose 40% Vinyl • A21098 Stone Pattern 15% Binder Fibrous Bound 1319-G-2 Sample Not Analyzed A21099 per COC Page 3 of 11 ti:*W* eurofins CLw Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5703 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous % 1319-G-3 Sample Not Analyzed 80% A21100 per COC Tan,Brown 1319-H-1 Floor Tile Homogeneous 80% Vinyl None Detected A21101A Tan,Brown 20% Binder Tightly Bound Non-fibrous A21102B Mastic Tightly Bound A21101 B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Yellow Fibrous Fibrous Bound 1319-H-2 Floor Tile Homogeneous 80% Vinyl None Detected A21102A Tan,Brown 20% Binder Non-fibrous Tightly Bound A21102B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Fibrous Bound 1319-H-3 Floor Tile Homogeneous 80% Vinyl None Detected A21103A Tan,Brown 20% Binder Non-fibrous Tightly Bound A21103B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Fibrous Bound 1319-1-1 Floor Tile Homogeneous 80% Vinyl None Detected A21104A Brown,White 20% Binder Non-fibrous Tightly Bound Page 4 of 11 ti:*W* eurofins CLw ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: True North Consultants, Inc. Lab Code: A18-5703 1000 East Warrenville Road Suite 140 Date Received: 06-04-18 Naperville, IL 60563 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous A21104B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Fibrous Bound 1319-1-2 Floor Tile Homogeneous 80% Vinyl None Detected A21105A Brown,White 20% Binder Non-fibrous Tightly Bound A21105B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Fibrous Bound 1319-1-3 Floor Tile Homogeneous 80% Vinyl None Detected A21106A Brown,White 20% Binder Non-fibrous Tightly Bound A21106B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Fibrous Bound 1319-J-1 Floor Tile Homogeneous 80% Vinyl None Detected A21107A Tan,Marble 20% Binder Non-fibrous Tightly Bound A21107B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Fibrous Bound Page 5 of 11 ti%eurofins CEI ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: True North Consultants, Inc. Lab Code: A18-5703 1000 East Warrenville Road Suite 140 Date Received: 06-04-18 Naperville, IL 60563 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous 1319-J-2 Floor Tile Homogeneous 80% Vinyl None Detected A21108A Tan,Marble 20% Binder Binder Non-fibrous A21110B Mastic Homogeneous Tightly Bound Mastic None Detected Clear A21108B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Fibrous Bound 1319-J-3 Floor Tile Homogeneous 80% Vinyl None Detected A21109A Tan,Marble 20% Binder Non-fibrous Tightly Bound A21109B Mastic Heterogeneous 5% Cellulose 95% Mastic None Detected Yellow Fibrous Bound 1319-K-1 Floor Tile Homogeneous 70% Vinyl None Detected A21110A White 20% Calc Carb Non-fibrous 10% Binder Tightly Bound A21110B Mastic Homogeneous 100% Mastic None Detected Clear Non-fibrous Bound 1319-K-2 Floor Tile A21111A Homogeneous White Non-fibrous Tightly Bound 70% Vinyl None Detected 20% Calc Carb 10% Binder Page 6 of 11 ti:*W* eurofins CLw ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: True North Consultants, Inc. Lab Code: A18-5703 1000 East Warrenville Road Suite 140 Date Received: 06-04-18 Naperville, IL 60563 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous A21111 B Mastic Homogeneous 100% Mastic None Detected Cellulose Clear Paint None Detected A21113 Non-fibrous White Bound Gypsum 1319-K-3 Floor Tile Homogeneous 70% Vinyl None Detected A21112A White 20% Calc Carb Non-fibrous 10% Binder Tightly Bound A21112B Mastic Homogeneous 100% Mastic None Detected Cellulose Clear Paint None Detected A21114 Non-fibrous White Bound Gypsum 1319-L-1 Drywall/Joint Heterogeneous 10% Cellulose 5% Paint None Detected A21113 Compound White 65% Gypsum Fibrous 20% Calc Carb Bound 1319-L-2 Drywall/Joint Heterogeneous 10% Cellulose 5% Paint None Detected A21114 Compound White 65% Gypsum Fibrous 20% Calc Carb Bound 1319-L-3 Drywall/Joint Heterogeneous 10% Cellulose 5% Paint None Detected A21115 Compound White 65% Gypsum Fibrous 20% Calc Carb Bound 1319-M-1 Panel Adhesive Heterogeneous 5% Cellulose 95% Mastic None Detected A21116 Yellow Fibrous Bound Page 7 of 11 ti%eurofins CEI ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: True North Consultants, Inc. Lab Code: A18-5703 1000 East Warrenville Road Suite 140 Date Received: 06-04-18 Naperville, IL 60563 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous 1319-M-2 Panel Adhesive Heterogeneous 5% Cellulose 95% Mastic None Detected A21117 Calc Carb Yellow Non-fibrous 10% Binder Tightly Bound Fibrous A21120B Mastic Heterogeneous 5% Cellulose 85% Mastic None Detected Bound Yellow 10% Binder 1319-M-3 Panel Adhesive Heterogeneous 40% Cellulose 60% Mastic None Detected A21118 Yellow Homogeneous 70% Vinyl None Detected A21121 White,Tan Fibrous Calc Carb Non-fibrous 10% Binder Bound Tightly Bound 1319-N-1 Floor Tile Homogeneous 70% Vinyl None Detected A21119A Red 20% Calc Carb Non-fibrous 10% Binder Tightly Bound Lab Notes: Color appears to be red instead of white/tan A21119B Mastic Heterogeneous 5% Cellulose 85% Mastic None Detected Yellow 10% Binder Fibrous Bound 1319-N-2 Floor Tile Homogeneous 70% Vinyl None Detected A21120A White,Tan 20% Calc Carb Non-fibrous 10% Binder Tightly Bound A21120B Mastic Heterogeneous 5% Cellulose 85% Mastic None Detected Yellow 10% Binder Fibrous Bound 1319-N-3 Floor Tile Homogeneous 70% Vinyl None Detected A21121 White,Tan 20% Calc Carb Non-fibrous 10% Binder Tightly Bound Page 8 of 11 ti:*W* eurofins CLw ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: True North Consultants, Inc. Lab Code: A18-5703 1000 East Warrenville Road Suite 140 Date Received: 06-04-18 Naperville, IL 60563 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous A21121 B Mastic Heterogeneous 5% Cellulose 85% Mastic None Detected Vinyl Yellow 10% Binder White,Gray Fibrous Calc Carb Bound Non-fibrous 10% 1319-0-1 Floor Tile Homogeneous 70% Vinyl None Detected A21122A White,Gray 20% Calc Carb A21123B Non-fibrous 10% Binder Mastic Tightly Bound A21122B Mastic Heterogeneous 5% Cellulose 85% Mastic None Detected Yellow 10% Binder Fibrous Bound Bound 1319-0-2 Floor Tile Homogeneous 70% Vinyl None Detected A21123A White,Gray 20% Calc Carb Non-fibrous 10% Binder Tightly Bound A21123B Mastic Heterogeneous 5% Cellulose 85% Mastic None Detected Yellow 10% Binder Fibrous Bound 1319-0-3 Floor Tile Homogeneous 70% Vinyl None Detected A21124A White,Gray 20% Calc Carb Non-fibrous 10% Binder Tightly Bound A21124B Mastic Heterogeneous 5% Cellulose 85% Mastic None Detected Yellow 10% Binder Fibrous Bound Page 9 of 11 ti%eurofins CEI Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 19 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5703 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous % 1319-P-1 Roofing Shingle Heterogeneous 40% Fiberglass 40% Tar None Detected A21125 Red,Black 20% Gravel 20% Fibrous Fibrous Bound 1319-P-2 Roofing Shingle Heterogeneous 40% Fiberglass 40% Tar None Detected A21126 Red,Black 20% Gravel Paint • Fibrous White,Gray 92% Bound 1319-P-3 Roofing Shingle Heterogeneous 40% Fiberglass 40% Tar None Detected A21127 Red,Black 20% Gravel Fibrous Bound 1319-Q-1 Window Caulk Heterogeneous 3% Paint • A21128 White,Gray 92% Binder Fibrous Bound 1319-Q-2 Sample Not Analyzed A21129 per COC 1319-Q-3 Sample Not Analyzed A21130 per COC 1319-R-1 Window Glazing Heterogeneous 98% Binder • A21131 White Fibrous Bound 1319-R-2 Sample Not Analyzed A21132 per COC 1319-R-3 Sample Not Analyzed A21133 per COC Page 10 of 11 tiff eurofins M LEGEND: Non-Anth = Non-Asbestiform Anthophyllite Non-Trem = Non-Asbestiform Tremolite Calc Carb = Calcium Carbonate METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 REPORTING LIMIT: <1% by visual estimation REPORTING LIMIT FOR POINT COUNTS: 0.25% by 400 Points or 0.1% by 1,000 Points REGULATORY LIMIT: >1% by weight Due to the limitations of the EPA 600 method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. Estimated measurement of uncertainty is available on request. This report relates only to the samples tested or analyzed and may not be reproduced, except in full, without written approval by Eurofins CEI. Eurofins CEI makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results. Interpretation of the analytical results is the sole responsibility of the client. Samples were received in acceptable condition unless otherwise noted. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government. ANALYST: iG APPROVED BY: Adriana de la Nuez Tianbao Bai, Ph.D., CIH Laboratory Director U INV TESTING NVLAP LAB CODE 101768-0 Page 11 of 11 tieurofins 730 SE Maynard Road, Cary, NC 27511 Tel: 866-481-1412: Fax: 919-481-1442 CHAIN OF CUSTODY r� CE1 Lab ..- COMPANY INFORMATION PROJECT INFORMATION CEI CLIENT #: Job Contact: Company: r - ,-J i1 Email / Tel: Address: r oo o ; r to ., / ol. / cs Project Name: .o 3 %- /(- 15 Project ID#: Email: C 4— HIP V7 e- .c .%P� PO #: Tel: ( ^ s-7 Cnf Fax: STATE SAMPLES COLLECTED IN: IF TAT IS NOT MARKED STANDARD 3 DAY TAT APPLIES. ASBESTOS METHOD J� Accept Samples TURN AROUND TIME 4 HR 8 HR 1 DAY 2 DAY 3 DAY 5 DAY PLM BULK EPA 600 ❑ ❑ ❑ I❑ ❑ ❑ PLM POINT COUNT (400) EPA 600 ❑ ❑ ❑ ❑ ❑ PLM POINT COUNT (1000) EPA 600 ❑ ❑ ❑ ❑ ❑ ❑ PLM GRAV w POINT COUNT EPA 600 ❑ ❑ ❑ ❑ ❑ PLM BULK CARB 435 ❑ ❑ ❑ ❑ ❑ PCM AIR NIOSH 7400 ❑ ❑ ❑ ❑ ❑ ❑ TEM AIR EPA AHERA ❑ ❑ ❑ ❑ ❑ ❑ TEM AIR NIOSH 7402 ❑ ❑ 0 ❑ ❑ ❑ TEM AIR (PCME) ISO 10312 ❑ ❑ ❑ ❑ ❑ ❑ TEM AIR ASTM 6281-15 ❑ ❑ ❑ ❑ ❑ ❑ TEM BULK CHATFIELD ❑ ❑ ❑ ❑ ❑ TEM DUST WIPE ASTM D6480-05 (2010) ❑ Q ❑ ❑ ❑ TEM DUST MICROVAC ASTM D5755-09 (2014) ❑ ❑ ❑ ❑ ❑ ❑ TEM SOIL ASTM D7521-16 ❑ ❑ ❑ TEM VERMICULITE CINCINNATI METHOD ❑ ❑ ❑ ❑ TEM QUALITTATIVE IN-HOUSE METHOD ❑ ❑ ❑ ❑ ❑ OTHER: I ❑ ❑ ❑ ❑ ❑ ❑ REMARKS / SPECiAL INSTRUCTIONS: J� Accept Samples Reject Samples Relinquished By: Date/Time Received By: DatelTime r 1,21,,-/ 1%v Samples will be disposed of 30 days after analysis Page of Version: CCOC.01.18.112.LD eurofins CEI mr-,S103 SAMPLING FORM COMPANY CONTACT INFORMATION Company: r.,r ,(krY�5u 1TMsraC• Job Contact: Project Name: - Project ID #: Tel: SAMPLE ID# - DESCRIPTION / LOCATION. VOLUME/ AREA TEST - / . /,. ,— 1 PLM TEM 0 filet x 1 �cr' , - -T%)�a K hr's i- e I PLM [ ] TEM 0 919-1- - -r,-v4urrd C, IPLM TEM 0 Ill - ver - eII6,, �. c PLM TEM 0 91 / r..7i PLM ® TEM 1 F S - Ll — l -Y,1 16,4114 -C i1 PLM TEM PLM TEM PLM fffj TEM PLM TEM 0 / PLM EZ TEM Rv12 ff :r+; le -Lk feelOL s41< PLM En TEM 0 Ii r• wtL i e'• .+ I� c1 PLM TEM 0 PA "I A Ile PLM , r TEM 0 -%J G! ., �; a/srrz hoc.f PLM TEM 0 PLM [] TEM 0 61 -F PLM TEM 0 PLM EZ� TEM `{ - r ;,•{8iv •tZ.n PLM E;n TEM PLM TEM 0 PLM TEM 0 PLM TEM 0 PLM Q TEM PLM Q TEM PLM Q TEM PLM TEM PLM TEM 0 PLM 0 TEM PLM TEM Page of Version: CCOC.01.18.2/2.LD TRUENORTH C 0 N S U L T A N T S June 5, 2018 Mr. Mark Rysavy Village of Mount Prospect 50 S. Emerson Street Mount Prospect, IL 60056 Subject: Pre -Demolition Asbestos Survey 21 S. Emerson Street - Mount Prospect, Illinois True North Project No. T118376 Dear Mr. Rysavy: 1000 East Warrenville Road, Suite Ido Naperville, Illinois 60563 P : 630 717 2880 F: 630 689 5881 mail@consuittruenorth.com True North Consultants, Inc. was retained by the Village of Mount Prospect to conduct a pre - demolition asbestos survey of the single-family residential structure located at 21 S. Emerson Street in Mount Prospect, Illinois (Site). Survey services were provided by an Illinois Department of Public Health (IDPH) licensed Asbestos Building Inspector (Roy W. Bass, License No. 100-19144) on June 1, 2018. The purpose of the survey was to determine the asbestos -content of suspect asbestos -containing materials associated with the structure prior to planned demolition activities. A total of forty- two (42) samples were collected during the sampling event. The bulk samples were submitted to a National Institute of Standards and Technology (NIST), National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory for analysis (Eurofins CEI, Inc. - Accreditation No. 101768-0). The bulk samples were analyzed for asbestos content in accordance with the procedures for Polarized Light Microscopy (PLM) with dispersion staining, contained in the Environmental Protection Agency (EPA) Method for the Determination of Asbestos in Bulk Building Materials (EPA/600/R-93/116). Results of sample analysis were reported as a percent composition. The following is a summary of PLM analytical results for sampled materials: n NENVIRONMENT: INFRASTRUCTURE: DEVELOPMENT Table 1: Summary of Findings — Suspect Asbestos -Containing Materials 21 S. Single -Family Residential Structure Emerson Street, Mount Prospect, Illinois Material Description Sample Location(s) Estimated Asbestos Number(s) Quantity Content 1'x1' Ceiling Tile and B21 -C-1,2,3 Located within the first floor bathroom. 40 Square Feet None Adhesive Detected Paneling Adhesive B21 -D1,2,3 Located behind the paneling at the center of 400 Square Feet 3% Chrysotile the main floor. 18"x18" Floor Tile and Located in the kitchen and first floor None Adhesive — Tan w/ Brown B21 -E-1,2,3 bathroom (top layer). 350 Square Feet Detected Marks 12"x12" Floor Tile — Gray B21 -F-1,2,3 Located in the kitchen and first floor 350 Square Feet None Peel and Stick bathroom (top middle layer). Detected Sheet Flooring — Pebble B21 -G-1,2,3 Located in the kitchen and first floor 350 Square Feet None Tan Pattern bathroom (bottom middle layer). Detected 9"x9" Floor Tile and B21 -H-1,2,3 Located in the kitchen and stairs (bottom 360 Square Feet 3% Chrysotile Mastic - Grey layer). Pipe Wrap B21-1-1,2,3 Located in the basement at the south side. 10 Linear Feet 65% Chrysotile Mud Packing B21 -J-1,2,3 Located along the chimney in the basement. 4 Square Feet 3% Chrysotile Attic Insulation B21 -K-1,2,3 Located throughout the attic. 000 Square >1,Feet None Detected 1'x1' Ceiling Tile -Smooth B21 -L-1,2,3 Located on the south porch. 200 Square Feet None Detected Located on the windows of the house and Window Caulk B21 -M-1,2,3 30 Windows 2% Chrysotile garage. Roofing Shingles B21 -N-1,2,3 Located on the roof of the house and garage. 000 Square >1,Feet None Detected The scope of sampling was limited to the aforementioned materials only. In the event that additional suspect asbestos -containing materials are identified during planned demolition/renovation activities additional testing may be required. Any quantities of material identified within this report are solely intended to be estimates and are not intended to be exact. The Environmental Protection Agency (EPA) defines asbestos -containing materials as those materials that contain greater than 1% asbestos. Based upon the results of analysis, asbestos -containing materials were identified at the subject Site. Due to the health effects associated with asbestos exposure, various federal, state and local agencies have promulgated standards and regulations for the performance of asbestos-related activities. Specifically, asbestos -containing materials at the Site may be regulated by the Occupational Safety and Health Administration (OSHA), Environmental Protection Agency (EPA), Illinois Department of Public Health (IDPH) and other local agencies. In that asbestos - containing materials were identified at the Site, the aforementioned asbestos regulations may apply to the removal and disposal of identified materials. Pre -Demolition Asbestos Survey I T118376 16/5/2018 1 Page 2 n NENVIRONMENT: INFRASTRUCTURE: DEVELOPMENT Enclosed with this letter are copies of analytical results. If you have any questions regarding this report, or if we can be of further assistance, please contact us at your convenience. Sincerely, TRUE NORTH CONSULTANTS Michael D. Brennan Senior Project Manager Enclosures: Laboratory Analytical Report Pre -Demolition Asbestos Survey I T118376 16/5/2018 1 Page 3 tiff eurofins CEI June 5, 2018 True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 CLIENT PROJECT: 21 S. Emerson CEI LAB CODE: A18-5715 Dear Customer: Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on June 4, 2018. The samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600 Method. Sample results containing >1% asbestos are considered asbestos -containing materials (ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1 % asbestos by weight as determined by visual estimation. Thank you for your business and we look forward to continuing good relations. If you have any questions, please feel free to call our office at 919-481-1413. Kind Regards, Tianbao Bai, Ph.D., CIH Laboratory Director INVt (R) TESTING NVLAP LAB CODE 101768-0 730 SE Maynard Road • Cary, NC 27511 • 919.481.1413 tiff eurofins CL, ASBESTOS ANALYTICAL REPORT By: Polarized Light Microscopy Prepared for True North Consultants, Inc. CLIENT PROJECT. 21 S. Emerson LAB CODE: A18-5715 TEST METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 REPORT DATE. 06/05/18 TOTAL SAMPLES ANALYZED. 32 # SAMPLES >1 % ASBESTOS: 5 TEL: 866-481-1412 www.ceilabs.com %%eurofins PROJECT: 21 S. Emerson Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 LAB CODE: A18-5715 ASBESTOS Client ID Layer Lab ID Color Sample Description % B21 -A-1 A21242A Multi -Colored Sheet Flooring None Detected A21242B Tan Sheet Flooring None Detected B21 -A-2 A21243 Multi -Colored Sheet Flooring None Detected B21 -A-3 A21244A Multi -Colored Sheet Flooring None Detected A21244B Tan Sheet Flooring None Detected B21 -B-1 A21245 Tan Plaster None Detected B21 -B-2 A21246 Tan Plaster None Detected B21 -B-3 ---------- Layer 1 ------ Layer 2 A21247 -------- A21247 Gray ----------- Gray Plaster Skim Coat ----------------- Plaster Base Coat None Detected ----------- None Detected B21 -C-1 ---------- Layer 1 ------ Layer 2 A21248 -------- A21248 Tan,White ----------- Tan Ceiling Tile ----------------- Adhesive None Detected ----------- None Detected B21 -C-2 ---------- Layer 1 ------ Layer 2 A21249 -------- A21249 Tan,White ----------- Tan Ceiling Tile ----------------- Adhesive None Detected ----------- None Detected B21 -C-3 ---------- Layer 1 ------ Layer 2 A21250 -------- A21250 Tan,White ----------- Tan Ceiling Tile ----------------- Adhesive None Detected ----------- None Detected B21 -D-1 A21251 Brown Paneling Adhesive • B21 -D-2 A21252 Sample Not Analyzed per COC B21 -D-3 A21253 Sample Not Analyzed per COC B21 -E-1 A21254A Tan Floor Tile None Detected A21254B Yellow,Clear Adhesive None Detected B21 -E-2 A21255A Tan Floor Tile None Detected A21255B Yellow,Clear Adhesive None Detected B21 -E-3 A21256A Tan Floor Tile None Detected A21256B Yellow,Clear Adhesive None Detected B21 -F-1 A21257A Gray Floor Tile None Detected A21257B Clear Adhesive None Detected B21 -F-2 A21258A Gray Floor Tile None Detected A21258B Clear Adhesive None Detected B21 -F-3 A21259A Gray Floor Tile None Detected A21259B Clear Adhesive None Detected B21 -G-1 A21260 Pebble Pattern Sheet Flooring None Detected Page 1 of 2 %%eurofins PROJECT: 21 S. Emerson Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 LAB CODE: A18-5715 ASBESTOS Client ID Layer Lab ID Color Sample Description % B21 -G-2 A21261 Pebble Pattern Sheet Flooring None Detected B21 -G-3 A21262 Pebble Pattern Sheet Flooring None Detected B21 -H-1 Layer 1 A21263 Gray Floor Tile ( Sheet Flooring) • --------------------------------------------------------------- Layer 2 A21263 Brown Mastic None Detected B21 -H-2 A21264 Sample Not Analyzed per COC B21 -H-3 A21265 White Sample Not Analyzed per COC B21-1-1 A21266 Off-white Pipe Wrap —EM• B21-1-2 A21267 B21 -L-1 Sample Not Analyzed per COC B21-1-3 A21268 None Detected Sample Not Analyzed per COC B21 -J-1 --------------------------------------------------------------- Layer 1 A21269 Layer 2 A21269 White Gray Mud Packing None Detected Mud Packing • B21 -J-2 A21270 White,Tan Sample Not Analyzed per COC B21 -J-3 A21271 Layer 1 A21278 Layer 2 A21278 Sample Not Analyzed per COC B21 -K-1 A21272 White Attic Insulation None Detected B21 -K-2 A21273 White Attic Insulation None Detected B21 -K-3 A21274 White Attic Insulation None Detected B21 -L-1 A21275 White,Tan Ceiling Tile None Detected B21 -L-2 A21276 White,Tan Ceiling Tile None Detected B21 -L-3 A21277 White,Tan Ceiling Tile None Detected B21 -M-1 --------------------------------------------------------------- Layer 1 A21278 Layer 2 A21278 White Tan Window Caulk Window Caulk None Detected • B21 -M-2 A21279 Sample Not Analyzed per COC B21 -M-3 A21280 Sample Not Analyzed per COC B21 -N-1 A21281 Black Roofing Shingles None Detected B21 -N-2 A21282 Black Roofing Shingles None Detected B21 -N-3 A21283 Black Roofing Shingles None Detected Page 2 of 2 ti%eurofins CEI ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: True North Consultants, Inc. Lab Code: A18-5715 1000 East Warrenville Road Suite 140 Date Received: 06-04-18 Naperville, IL 60563 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Project: 21 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous % B21 -A-1 Sheet Flooring Heterogeneous 35% Cellulose 15% Tar None Detected A21242A Multi -Colored 50% Vinyl Fibrous Bound A21242B Sheet Flooring Heterogeneous 35% Cellulose 15% Tar None Detected Tan 50% Vinyl Fibrous Bound B21 -A-2 Sheet Flooring Heterogeneous 35% Cellulose 15% Tar None Detected A21243 Multi -Colored 50% Vinyl Fibrous Bound B21 -A-3 Sheet Flooring Heterogeneous 35% Cellulose 15% Tar None Detected A21244A Multi -Colored 50% Vinyl Fibrous Bound A21244B Sheet Flooring Heterogeneous 35% Cellulose 15% Tar None Detected Tan 50% Vinyl Fibrous Bound B21 -B-1 Plaster Heterogeneous <1% Cellulose 65% Binder None Detected A21245 Tan <1% Hair 35% Silicates Fibrous Bound B21 -B-2 Plaster Heterogeneous <1% Cellulose 55% Binder None Detected A21246 Tan <1% Hair 35% Silicates Fibrous 10% Paint Bound Page 1 of 9 ti:*W* eurofins CLw ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: True North Consultants, Inc. Lab Code: A18-5715 1000 East Warrenville Road Suite 140 Date Received: 06-04-18 Naperville, IL 60563 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Project: 21 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous % B21 -B-3 Plaster Skim Coat Heterogeneous 55% Binder None Detected Layer 1 Gray 35% Silicates A21247 Non-fibrous 10% Paint Fiberglass Bound Perlite E----------------------------------------------------------------- Layer 2 Plaster Base Coat Heterogeneous <1% Cellulose 65% Binder None Detected A21247 Gray <1% Hair 35% Silicates Fibrous Bound Bound B21 -C-1 Ceiling Tile Heterogeneous 50% Cellulose 10% Binder None Detected Layer 1 Tan,White 15% Fiberglass 25% Perlite A21248 Fibrous <1% Paint Bound ------------------------------------------------------------------ Layer 2 Adhesive Heterogeneous 100% Mastic None Detected A21248 Tan Non-fibrous Bound B21 -C-2 Ceiling Tile Heterogeneous 50% Cellulose 10% Binder None Detected Layer 1 Tan,White 15% Fiberglass 25% Perlite A21249 Fibrous <1% Paint Bound ------- Layer 2 ----------- Adhesive ----------- Heterogeneous ---- ------- ----- 100% ------- Mastic -------- - - - - -- None Detected A21249 Tan Non-fibrous Bound B21 -C-3 Ceiling Tile Heterogeneous 50% Cellulose 10% Binder None Detected Layer 1 Tan,White 15% Fiberglass 25% Perlite A21250 Fibrous <1% Paint Bound Page 2 of 9 ti:*W* eurofins CLw Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 21 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5715 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous % ---------------------------------------------------------------- Layer 2 Adhesive Heterogeneous 100% Mastic None Detected A21250 Tan Non-fibrous Bound B21 -D-1 Paneling Adhesive Heterogeneous 97% Mastic WIMPM A21251 Brown Fibrous Bound B21 -D-2 Sample Not Analyzed 100% A21252 per COC Yellow,Clear B21 -D-3 Sample Not Analyzed A21253 per COC B21 -E-1 Floor Tile Heterogeneous 25% Binder None Detected A21254A B21 -E-2 Floor Tile Tan 75% Vinyl 25% Binder None Detected Non-fibrous Tan 75% Bound A21254B Adhesive Heterogeneous 100% Mastic None Detected Yellow,Clear Non-fibrous Bound B21 -E-2 Floor Tile Heterogeneous 25% Binder None Detected A21255A Tan 75% Vinyl Non-fibrous Bound A21255B Adhesive Heterogeneous 100% Mastic None Detected Yellow,Clear Non-fibrous Bound Page 3 of 9 ti%eurofins CEI ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: True North Consultants, Inc. Lab Code: A18-5715 1000 East Warrenville Road Suite 140 Date Received: 06-04-18 Naperville, IL 60563 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Project: 21 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous B21 -E-3 Floor Tile Heterogeneous 25% Binder None Detected A21256A Tan 75% Vinyl Clear Non-fibrous Bound Non-fibrous A21256B Adhesive Heterogeneous 100% Mastic None Detected Bound Yellow,Clear B21 -F-2 Non-fibrous Heterogeneous 25% Binder Bound A21258A B21 -F-1 Floor Tile Heterogeneous 25% Binder None Detected A21257A Gray 75% Vinyl Non-fibrous Bound Bound A21257B Adhesive Heterogeneous 100% Mastic None Detected Clear Non-fibrous Bound B21 -F-2 Floor Tile Heterogeneous 25% Binder None Detected A21258A Gray 75% Vinyl Non-fibrous Bound A21258B Adhesive Heterogeneous 100% Mastic None Detected Clear Non-fibrous Bound B21 -F-3 Floor Tile Heterogeneous 25% Binder None Detected A21259A Gray 75% Vinyl Non-fibrous Bound Page 4 of 9 ti%eurofins CEI Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 21 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5715 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous % A21259B Adhesive Heterogeneous 100% Mastic None Detected Clear Non-fibrous Bound B21 -G-1 Sheet Flooring Heterogeneous 25% Cellulose 10% Binder None Detected A21260 Pebble Pattern 15% Synthetic Fiber 50% Vinyl Fibrous Bound B21 -G-2 Sheet Flooring Heterogeneous 25% Cellulose 10% Binder None Detected A21261 Pebble Pattern 15% Synthetic Fiber 50% Vinyl Fibrous Bound B21 -G-3 Sheet Flooring Heterogeneous 25% Cellulose 10% Binder None Detected A21262 Pebble Pattern 15% Synthetic Fiber 50% Vinyl Fibrous Bound B21 -H-1 Floor Tile ( Sheet Heterogeneous 35% Cellulose 12% Tar • Layer 1 Flooring) Gray 50% Vinyl A21263 Fibrous Bound _----------------------------------------------------------------- Layer 2 Mastic Heterogeneous 100% Mastic None Detected A21263 Brown Fibrous Bound B21 -H-2 Sample Not Analyzed A21264 per COC B21 -H-3 Sample Not Analyzed A21265 per COC Page 5 of 9 ti%eurofins CEI Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 21 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5715 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 IClient ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS I Lab ID Description Attributes Fibrous Non -Fibrous B21-1-1 Pipe Wrap Heterogeneous 15% Cellulose 20% Binder • - A21266 Off-white Fibrous Bound B21-1-2 Sample Not Analyzed A21267 per COC B21-1-3 Sample Not Analyzed A21268 per COC B21 -J-1 Mud Packing Heterogeneous 15% Fiberglass 60% Binder None Detected Layer 1 per COC White 25% Silicates A21269 Attic Insulation Non-fibrous 65% Fiberglass None Detected A21272 Bound 35% Mineral Wool ------------------------------------------------------------------ Layer 2 Mud Packing Heterogeneous 62% Binder A21269 Gray 35% Silicates B21 -K-2 Attic Insulation Fibrous 65% Fiberglass None Detected A21273 Bound 35% Mineral Wool B21 -J-2 Sample Not Analyzed A21270 per COC B21 -J-3 Sample Not Analyzed A21271 per COC B21 -K-1 Attic Insulation Heterogeneous 65% Fiberglass None Detected A21272 White 35% Mineral Wool Fibrous Loose B21 -K-2 Attic Insulation Heterogeneous 65% Fiberglass None Detected A21273 White 35% Mineral Wool Fibrous Loose Page 6 of 9 ti%eurofins CEI Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 21 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5715 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous % B21 -K-3 Attic Insulation Heterogeneous 65% Fiberglass None Detected A21274 White 35% Mineral Wool A21278 Fibrous Loose B21 -L-1 Ceiling Tile Heterogeneous 90% Cellulose 10% Paint None Detected A21275 White,Tan 23% Binder Fibrous 65% Calc Carb Bound B21 -L-2 Ceiling Tile Heterogeneous 90% Cellulose 10% Paint None Detected A21276 per COC White,Tan B21 -M-3 Sample Not Analyzed Fibrous A21280 per COC Bound B21 -L-3 Ceiling Tile Heterogeneous 90% Cellulose 10% Paint None Detected A21277 White,Tan Fibrous Bound B21 -M-1 Window Caulk Heterogeneous 10% Paint None Detected Layer 1 White 90% Binder A21278 Non-fibrous Bound ------------------------------------------------------------------ Layer 2 Window Caulk Heterogeneous 10% Paint A21278 Tan 23% Binder Fibrous 65% Calc Carb Bound B21 -M-2 Sample Not Analyzed A21279 per COC B21 -M-3 Sample Not Analyzed A21280 per COC Page 7 of 9 ti%eurofins CEI Client: True North Consultants, Inc. 1000 East Warrenville Road Suite 140 Naperville, IL 60563 Project: 21 S. Emerson ASBESTOS BULK PLM, EPA 600 METHOD ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Lab Code: A18-5715 Date Received: 06-04-18 Date Analyzed: 06-05-18 Date Reported: 06-05-18 Client ID Lab Lab NON -ASBESTOS COMPONENTS ASBESTOS Lab ID Description Attributes Fibrous Non -Fibrous B21 -N-1 Roofing Shingles Heterogeneous 35% Fiberglass 40% Tar None Detected A21281 Black 25% Silicates Fibrous Bound B21 -N-2 Roofing Shingles Heterogeneous 35% Fiberglass 40% Tar None Detected A21282 Black 25% Silicates Fibrous Bound B21 -N-3 Roofing Shingles Heterogeneous 35% Fiberglass 40% Tar None Detected A21283 Black 25% Silicates Fibrous Bound Page 8 of 9 tiff eurofins M LEGEND: Non-Anth = Non-Asbestiform Anthophyllite Non-Trem = Non-Asbestiform Tremolite Calc Carb = Calcium Carbonate METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 REPORTING LIMIT: <1% by visual estimation REPORTING LIMIT FOR POINT COUNTS: 0.25% by 400 Points or 0.1% by 1,000 Points REGULATORY LIMIT: >1% by weight Due to the limitations of the EPA 600 method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. Estimated measurement of uncertainty is available on request. This report relates only to the samples tested or analyzed and may not be reproduced, except in full, without written approval by Eurofins CEI. Eurofins CEI makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results. Interpretation of the analytical results is the sole responsibility of the client. Samples were received in acceptable condition unless otherwise noted. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government. ZANALYST: 4&^ A& APPROVED BY: /��— Megan Rumble Tianbao Bai, Ph.D., CIH Laboratory Director INV TESTING NVLAP LAB CODE 101768-0 Page 9 of 9 eurofns 730 SE Maynard Road, Cary, NC 27511 Tel: 866-481-1412; Fax: 919-481-1442 CHAIN OF CUSTODY CE 1 LAB USE ONLY: -7 CEI Lab Code:" CEI Lab I.D. Ran e: COMPANY INFORMATION PROJECT INFORMATION CEI CLIENT #: Accept Samples Job Contact: Company: Email 1 Tel: Address: o o nu c( . ' �, Project Name: ni I $, E�irvsc� ❑ ©,. ln. r Protect ID#: Email: ❑ PO#: Tel: 7- 6 p 1 Fax: IVA STATE SAMPLES COLLECTED IN: IF TAT IS NOT MARKED STANDARD 3 DAY TAT APPLIES. ASBESTOS METHOD Accept Samples TURN AROUND TIME l 4 HR SHR 1 DAY 2 DAY 3 DAY 5 DAY PLM BULK EPA 600 ❑ ❑ ❑ ❑ ❑ ❑ PLM POINT COUNT 400) EPA 600 ❑ ❑ ❑ ❑ ❑ ❑ PLM POINT COUNT (1000) EPA 600 ❑ ❑ ❑ ❑ ❑ ❑ PLM GRAY w POINT COUNT EPA 600 ❑ ❑ ❑ ❑ PLM BULK CARB 435 ❑ ❑ ❑ ❑ ❑ PCM AIR NIOSH 7400 ❑ ❑ ❑ ❑ ❑ ❑ TEM AIR EPA AHERA ❑ ❑ ❑ ❑ ❑ ❑ TEM AIR NIOSH 7402 ❑ ❑ ❑ ❑ ❑ ❑ TEM AIR (PCME) ISO 10312 ❑ ❑ ❑ ❑ ❑ ❑ TEM AIR ASTM 6281-15 ❑ ❑ ❑ ❑ ❑ ❑ TEM BULK CHATFIELD ❑ ❑ ❑ ❑ ❑ TEM DUST WIPE ASTM D6480-05 (2010) ❑ ❑ ❑ ❑ ❑ ❑ TEM DUST MICROVAC ASTM D5755-09 (2014) ❑ ❑ ❑ ❑ ❑ ❑ TEM SOIL ASTM D7521-16 ❑ ❑ ❑ ❑ TEM VERMICULITE CINCINNATI METHOD ❑ ❑ ❑ ❑ TEM QUALITTATIVE IN-HOUSE METHOD ❑ ❑ ❑ ❑ ❑ OTHER: ❑ ❑ ❑ ❑ ❑ ❑ REMARKS 1 SPECIAL INSTRUCTIONS: Accept Samples Reject Samples Relinquished By:_ DatefTime Received By: Date/Time Samples will be disposed of 30 days after analysis Page of Version: CCOC.01.18.112.LD . ti eurofns SAMPLING FORM COMPANY CONTACT INFORMATION Company: Job Contact: Project Name: — Project ID #: Tel: SAMPLE IN DESCRIPTION 1 LOCATION VOLUME[ AREA TEST — tin Icer .e (v/c, PLM ELI TEM 0 I -R �3 ) P — PLM :� TEM 0 PLM TEM Q A jAd �� PLM 0 TEM 0 62 -k ' z 3 reOi i e6 ,-'iFl,, - PLM TEM 0 PLM TEM LeekIcta- lig , r PLM TEM 0 d2, 3 L rcr�tjc° rs�c -G P PLM TEM 0 62 ` i. Z.�p ivre PLM 0 TEM 0 a c n, PLM TEM .k , n5 'r rte, PLM TEM 0 PLM TEM 0 PLM [ TEM 0 J-' PLM 0 TEM 0 PLM TEM 0 PLM TEM PLM TEM 0 PLM TEM 0 PLM TEM PLM 0 TEM (� PLM 0 TEM PLM TEM PLM 0 TEM 0 PLM TEM 0 PLM TEM PLM TEM PLM TEM 0 PLM 0 TEM 0 Page of Version: CCOC.01.18.212.LD Invitation to Bid with Specifications Village Owned Property Demolition May 25, 2018 Community Development Department 50 S. Emerson Street Mount Prospect, IL 60056 (847) 818-5328 Village Demolition — BID Table of Contents ADVERTISEMENT TO BID........................................................... --.--.3 TERMS AND CONDITIONS .................. . ..... ......... .............. , ................... 4 BIDDER INFORMATION SHEET .............. ........ ........ 5 ASBESTOS CONTAINING MATERIAL AFFIDAVIT ....................................... 6 BIDDINGSCHEDULE.............................................................................. 8 SPECIAL PROVISIONS...........................................................................9 CERTIFICATES OF COMPLIANCE, ........................ ..................................... 16 GENERAL CONDITIONS AND INSTRUCTIONS TO BIDDERS FOR PROCUREMENT OF MATERIALS- ...... ........ . ...... . . . ................. -- .......... 19 VENDOR AUTHORIZATION ......................... ....... --- ................... . 26 2 of 27 Village Demolition — BID NOTICE TO BIDDERS The Village of Mount Prospect will accept bids for "Demolition" for two Village owned properties. The bids shall be sent to the Office of the Village Clerk located at 50 S. Emerson St., Mount Prospect, IL 60056, Third Floor, between 8:00 am and 5:00 pm, Monday through Friday. The bids will be publicly opened at 11:00 AM on June 7, 2018 at the Mount Prospect Village Hall, 50 S. Emerson Street, Third Floor Board Room. All bids must be received by the Village by bid time. No late bids will be accepted under any circumstances. The bid must be in a sealed opaque envelope plainly marked Demolitions — BID. The Village of Mount Prospect reserves the right to reject any or all proposals, to waive any and all technicalities, or to accept the proposal deemed most advantageous to the Village. Requests for Proposals can be obtained by emailing !pjr : wv� N�°p I � ll?N �)s : tA-1rg or by pick up at the Village Hall, 50 S. Emerson Street, Mount Prospect, IL 60056 at the Building Department counter on the second floor. Contractors are advised to attend a mandatory site visit on Friday June 1, 2018 at 10:00 am to inspect the structures at 19 and 21 S. Emerson Street prior to bidding. It is the Contractor's responsibility to become familiar with any and all site requirements and conditions, including environmental remediation requirements within each house. All work must conform to the demolition regulations contained herein. Bids will be rejected from Contractors that do not attend the mandatory site visit. No bid bond will be required for this project. 3 of 27 Village Demolition — BID TERMS AND CONDITIONS l) Three (3) references are required. The references shall be of like -kind contracts. 2) The Village retains the right to cancel the contract for any or no specified reason. 3) The Village requires all bidders to read carefully all the specifications and what is required under the terms of the contract. 4) The Village will require proof of insurance. The requirements for insurance are provided under the Contract Provisions section of the bid document entitled Village Insurance Requirement. 5) All questions are to be directed in writing via email to Mark Rysavy, the Deputy Director of Building & Inspection Services, located at 50 S. Emerson Street, �lrnmAkpNnlg�atrtlnsm,_Cl rg 6) Contractors are advised to attend a mandatory site visit on Friday June 1, 2018 at 10:00 am to inspect the structures at 19 and 21 S. Emerson Street prior to bidding. It is the Contractor's responsibility to become familiar with any and all site requirements and conditions, including environmental remediation requirements within each house. All work must conform to the demolition regulations contained herein. Bids will be rejected from Contractors that do not attend the mandatory site visit. 7) No bid bond will be required for this project. The Village Board reserves the right to rejectany and all bids or portions thereof 4 of 27 Village Demolition — BID BIDDER INFORMATION SHEET NAME: (PRINT) Jeffrev M. Finucane w SIGNATURE: COMPANY NAME: Delta Demolition. Inc. (PRINT) ADDRESS: 6832 W. North Ave... Suite 1A Chicaqo, IL 60707-4429 TELEPHONE: 773-252-6370 EMAIL: delta(aMeltademolition.com SERVICE LOCATION, if different than above address same Please Return to: Office of the Village Clerk Village of Mount Prospect 50 S. Emerson St., Third Floor Mount Prospect, IL 60056 The bid must be in a sealed opaque envelope plainly marked: Demolition — BID. The bids must be received by 11:00am on June 7, 2018 at which time they will be opened and publicly read. It shall be the responsibility of the bidder to deliver its bid to the designated person at the appointed place, prior to the announced time for the opening of the bids. Late delivery of a bid for any reason, including faulty or late delivery by United States Mail or other carrier, will disqualify the bid. 5 of 27 Village Demolition — BID ASBESTOS CONTAINING MATERIALAFFIDAVIT #1 Contractor:Delta Demolition, Inc. Contractor Address: 6832 W. North Ave., Suite 1A, Chicago, IL 60707-4429 Address of Demolition: 19 S. H-nersop. Street_ Mount Pros -ect. IL 60056 Parcel Identification Number: 08-12-104-009-000 I, the undersigned, acknowledge that the attached permit application is pursuant to the Village of Mount Prospect Building Code. I agree to comply with the complete statutory and regulatory requirements found in the Illinois Environmental Protection Act 415 ILCS 5/8 et seq. and Title 35 of the Illinois Administrative Code of Regulations. I further agree to comply with the National Emission Standards for hazardous Air Pollutants (NESHAP) regulations. I further realize that it is my responsibility to determine if asbestos is present. In the event asbestos is present, if applicable, I shall comply with the Asbestos School Hazard Act and Commercial and Public Buildings Asbestos Abatement Act administered by the Illinois Department of Public Health. I recognize that the failure to comply with the above requirements shall render any permits issued by the Village of Mount Prospect null and void and without further effect. I also recognize any violation of these terms shall render the contract void and will result in the complete non-payment by the Village of Mount Prospect. Subscribed and sworn to before me this 7th day of June 2018. Notary Public M. Finucane, President Contractor's Name Printed OFFICIAL SEAL CATHERINE, HELENA NORRIS NOTARY PUBLIC, STATE OF ILLINOIS My Commission Expires Oct 30, 2018 6 of 27 Village Demolition — BID ASBESTOS CONTAINING MATERIAL AFFIDAVIT #2 Contractor: Contractor Address Delta Demolition, Inc. 6832 W. North Ave., Suite 1A, Chicago, IL 60707-4429 Address of Demolition: 21 S. Emerson Street. Mount Prospect, IL 60056 Parcel Identification Number: 08-12-104-010-000 I, the undersigned, acknowledge that the attached permit application is pursuant to the Village of Mount Prospect Building Code. I agree to comply with the complete statutory and regulatory requirements found in the Illinois Environmental Protection Act 415 ILCS 5/8 et seq. and Title 35 of the Illinois Administrative Code of Regulations. I further agree to comply with the National Emission Standards for hazardous Air Pollutants (NESHAP) regulations. I further realize that it is my responsibility to determine if asbestos is present. In the event asbestos is present, if applicable, I shall comply with the Asbestos School Hazard Act and Commercial and Public Buildings Asbestos Abatement Act administered by the Illinois Department of Public Health. I recognize that the failure to comply with the above requirements shall render any permits issued by the Village of Mount Prospect null and void and without further effect. I also recognize any violation of these terms shall render the contract void and will result in the complete non-payment by the Village of Mount Prospect. Subscribed and sworn to before me this 7th day of June -111111 2018. Notary Public )0--c7o kractor;sSignature Jeffrey M. Finucane, President Contractor's Name Printed OFFICIAL SEAL FlNOTARY ATHERINE HELENA NORRIS PUBLIC, STATE OF ILLINOIS y Commission Expires Oct 30, 2018 7 of 27 Village Demolition — BID BIDDING SCHEDULE Contractors are advised to attend a mandatory site visit on Friday June 1, 2018 at 10:00 am to inspect the structures at 19 and 21 S. Emerson Street prior to bidding. It is the Contractor's responsibility to become familiar with any and all site requirements and conditions, including environmental remediation requirements within each house. All work must conform to the demolition regulations contained herein. Bids will be rejected from Contractors that do not attend the mandatory site visit. PROPOSAL FOR DEMOLITION 19 S. ["inerson Street Total cost of environmental remediation, demolition, backfill and restoration $ 37„000.00 21 S. Emerson Street Total cost of environmental remediation, demolition, backfill and restoration $ 34,000.00 Total Demolition Costs of both properties $ 71,000.00 Options/Alterations: None, Authorized Signature Title : President Date: 6/7/2018 8 of 27 SPECIAL PROVISIONS General Village Demolition — BID These special provisions, and the Standard Specifications, and the Supplemental Specifications shall govern the work for the Village Owned Property Demolition in the Village of Mount Prospect, Illinois. copc of Work The work under this project shall consist of one contract for all material, tools, labor, hauling, disposal, remediation, restoration, and all necessary appurtenances required for the Village Owned Property Demolition and all other collateral work needed to complete the project as specified herein. Only contractors qualified to perform this type of construction shall bid this project. The selected Contractor shall designate one responsible company agent to act as an overall foreman. Said foreman shall be fluent in English. The foreman shall notify the Community Development Department or his designee 48 hours prior to each day that the Contractor will be working. Any work performed without said notification shall not be paid for. The Contractor agrees to repair or replace, to the satisfaction of the Community Development Department, or his agent, any vegetation or property damaged by his operations. The Contractor will furnish all labor, materials and equipment necessary to perform the work as outlined in accordance with the enclosed specifics. Prices indicated on the bid proposal for this contract shall include all work contemplated by these specifications. The Contractor shall submit monthly to coincide with the Village Board Warrant, along with request of payment, an itemized listing of "work performed," referring to the individual demolition addresses during the period covered for payment. This listing of "work performed" will be necessary prior to the releasing of any payment. These Special Provisions are intended to include all information necessary for the work contemplated. In case, by inadvertence or otherwise, these Special Provisions omit some information necessary for that purpose, the Contractor shall, nevertheless, be required to perform such work at either no expense to the Village, or at a negotiated cost with the Village, so that the maintenance program may be accomplished according to the true intent and purpose of these specifications. If the Contractor defaults or neglects to carry out the work in accordance with the contract specifications, or fails to perform any provision of the contract, the Village may, after seven days written notice to the Contractor and without prejudice to any other remedy he may have, make good deficiencies and may deduct the cost thereof from the payment then or thereafter due to the Contractor; or at it's option, may terminate the contract. onstructio n Timeline 9 of 27 Village Demolition — BID The anticipated schedule for this work has a very specific schedule that must be met;. • Bid opening June 7, 2018 • Low bidder submits 10 day EPA notice June 8, 2018 Final contract authorization by Village June 19, 2018 Remediation & Demolition can begin June 25, 2018 Demolition complete, site fully restored July 23, 2018 The Village has a special event in front of these two lots and throughout the downtown area scheduled for July 26-27, 2018. The houses must be demolished and the sites fully restored with all equipment being removed by the end of day on July 23, 2018. Contractors shall include weekend and overtime work as necessary to allow for completion by this date. No acceleration fees will be paid to the contractor to meet this schedule. Each day of incomplete work will be assessed at $2500 per day as liquidated damages. Environmental. Remediation The contractor is responsible for all testing, identification, removal and disposal of asbestos containing materials which may be located in the structures to be demolished in accordance with all applicable local, state and federal regulations. This cost shall be included in each property total cost. No line item fees or allowances will be accepted. The contractor will be given the opportunity at a field meeting to inspect the structures for any possible asbestos containing materials (ACM) and to price this remediation work accordingly. Prior to commencement of demolition, the contractor will be required to submit a signed affidavit (an example will be provided to the contractor by the Village of Mount Prospect) attesting to the proper identification and disposal of ACM. In addition the Contractor shall obtain necessary State of Illinois and Cook County permits for remediation and demolition. Utility Disconnections It shall be the responsibility of the Village to obtain final utility disconnection letters from ComEd for the electrical service, Nicor for the gas service, and AT&T or Comcast for cable television and phone services. Final disconnection letters will be required prior to commencement of work. Water and sewer services shall be disconnected by the Village of Mount Prospect Department of Public Works. No work will be necessary for the disconnection of these utilities by the contractor. However, restoration of the grass parkway and private grass will be the responsibility of the contractor. Tree Protection Several trees on the site shall be protected with orange construction fence to avoid damage to the limbs or the roots. No equipment will be allowed on site until the tree protection is in place and the Village has approved its installation. Any damages to the trees will be backcharged to the 10 of 27 Village Demolition — BID contractor according to the Village fee schedule. Trees to remain shall be identified by the Village and tagged for viewing at the walk throughs. REM All trucks hauling debris of any kind shall be fully covered. Any truck hauling without sufficient cover/ tarp will be ticketed in accordance with the Village of Mount Prospect Police Department standards. All trucks must meet any local, county, and state weight requirements at all times. Any overweight trucks will be ticketed in accordance with the Village of Mount Prospect Police Department standards. i""onstruction & Silt fence Site Protection The contractor is responsible for providing a 6'-0" temporary construction fence around the site with lockable gates for access. The fence may sit on pedestals, but pedestals shall be supported with sand bags in good condition. The silt fence requirement will be waived for the demolition of these two homes. Steel plates will be required to protect any concrete or brick paver sidewalks around the property that may be damaged due to equipment or truck entry to the site. Dust Control The contractor is responsible for obtaining a backflow prevention device and meter from Public Works to connect to a hydrant for dust control purposes. Any damage to the hydrant or water system from misuse will be the responsibility of the Contractor to pay for. l is aosal of.Debris The contractor shall legally and safely transport and dispose of off-site all materials removed from demolished structures, including recycling, in accordance with local, state, and federal regulations governing such operations. The contractor, and any of his representatives shall be prohibited from burning, or causing to be burned any items on site. 1@ours ofOperation The contractor may perform the work on any day or days of the week except Sunday. Work shall be performed between the howl of 7:00 a.m. and 7:00 p.m. The Community Development Department will notify the Contractor of any events or requirements that may impact or be affected by the performance of Contractor's maintenance duties and the Contractor shall reschedule his dernolition schedule to accommodate the Village. 11 of 27 Village Demolition — BID Public Safety and Convenience The Contractor shall exercise precaution at all times for the protection of persons and property. Safety provisions of all applicable laws and ordinances shall be strictly observed. Upon verbal notice from the Director of Community Development, or his authorized representative, the Contractor shall discontinue said hazardous work practice. It is required that the Contractor keep the necessary guards and protective devices at locations where work is being performed to prevent injury to the public or damage to public to private property. Backfill Upon removal of entire foundation and slabs, driveways, patios, driveway aprons, and private walkways, the contractor shall be responsible for the appropriate fill for each application. No curbs or depressed curbs shall be removed by the contractor. Stone fill (CA -6) shall be used to level any excavations to a point not less than 6" from the existing grade. Top soil shall be used for the remaining 6" of fill. Top soil shall be free of clay, brick, and stone and shall be ready for seed. Area will be graded to prevent ponding of water on the property. No existing building materials, concrete, or brick fill will be allowed. Recycled CA -6 will be an allowable alternative to virgin CA -6. Seeding. Final seeding shall be conducted and erosion control blankets laid in place until seed starts to grow. Seed mix to be approved Village of Mount Prospect, but shall not include fescue, wildflowers, clover or the like. Kentucky bluegrass is the preferred seed, but alternates will be reviewed. Watering of grass seed is the responsibility of the Village. Partial Pa r�rq Payments shall be processed within 45 to 60 days. The payment form shall be the document that the Contractor shall submit each month, along with request of payment, showing an itemized listing of "work performed," referring to the individual demolition addresses during the period covered for payment. This listing of "work performed" will be necessary prior to the release of any payment. Upon approval by the Community Development Department, the Village shall contact the Contractor to inform them of the approved amount for which the necessary lien waivers should be made. The waivers shall include all amounts paid to the contractors, subcontractors, suppliers, and their respective supporting lien waivers shall accompany the Contractor's request. Supporting lien waivers for subcontractors and suppliers shall be prepared on double faced forms, one side entitled "Waiver of Lien" and the other side "Contractor's Affidavit". Each side shall be completely filled out. The Contractor's Affidavit shall show names of all suppliers and contractors providing material and services for the subcontractor. Partial waivers shall be on Form 1722 C.T. & T. Company. 12 of 27 Village Demolition —BID Acceptance and Final Payment Final payment will be made sixty (60) days after the work is fully completed and the contract fully performed. This date will be determined from the date the seed and blanket is installed and completed. Request for final payment shall be accompanied by the documentation outlined hereinbefore in the special provision covering PARTIAL PAYMENTS. Final lien waivers shall be on Form 1550 C.T. & T. Company. Except as modified by the foregoing, final payment will be made in accordance with the requirements of Article 109.08 of the Standard Specifications as applicable to work. Quantities for this contract shall be subject to the contract unit price applied to final measured quantities. Neither the final payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Village a complete release of all liens arising out of this contract, or receipts in full in lieu thereof, and if required in either case, an affidavit that the releases and receipts include all the labor and material for which a lien could be filed, but the Contractor may, if any subcontractor refuses to furnish a release or receipt in full, furnish a bond satisfactory to the Village, to indemnify him against any lien. If any liens remain unsatisfied after all payments are made, the Contractor shall refund to the Village all monies that the latter may be compelled to pay in discharging such a lien, including all costs and reasonable Attorney's fee. Chanizes in the Work The Village, without invalidating the Contract, may order extra work or make changes by altering, adding to, or deducting from the work, the Contract sum being adjusted accordingly. All such work shall be executed under the conditions of the original Contract, except that any claims for extension of time caused thereby shall be adjusted at the time of ordering change. In giving instructions, the Village shall have the authority to make minor changes in the work involving extra costs and not inconsistent with the purpose of the work. Otherwise, except in an emergency endangering life or property, no extra work or change shall be made unless it is in pursuance of an order by the Community Development Department, and no claim for an addition to the Contract sum shall be valid unless or so ordered. The value of any such work change shall be determined in one or more of the following ways: a. By estimate and acceptance in lump sum; b. By cost and percentage; c. By cost and a fixed fee. 13 of 27 Village Demolition —BID If none of the above methods are agreed upon, the Contractor shall proceed with the work, provided he receives an order as above. In such cases and also under cases (c) and (d), he shall keep account of the net cost of labor and materials, together with vouchers. In any case, the Supervisor shall certify to the amount, including reasonable allowances for overhead and profit due to the Contractor. Pending final determination of value, payments on account of changes shall be made on the Village's estimate. Claims for Extra Cost If the Contractor claims extra cost under this Contract either by drawings or otherwise, he shall give the Supervisor written notice thereof within a reasonable time after receipt of such instructions, except in emergency which endangers life or property. The procedure shall then be as provided under CHANGES IN WORK. No such claim shall be valid unless so made. Correction of WorkITBefore Final ny jLjnt All materials determined by the Village as failing to conform to the Contract shall be promptly removed from the premises by the Contractor, whether incorporated into the work or not. He shall promptly replace and re -execute his own work in accordance with the contract and without expense to the Village. He shall bear all costs of making good the work of other contractors which is destroyed or damaged by such removal or replacement. If the Contractor does not remove such non -conforming work and materials within a reasonable time as fixed by written notice, the Village may remove them and store the material at the expense of the Contractor. If the Contractor fails to pay the expense of such removal within ten (l 0) days thereafter, the Village may, upon ten (10) days notice in writing, sell such materials at auction or private sale and shall account for the new proceeds thereof after deducting all cost and expense that should have been borne by the Contractor. Payment Withheld The Village may withhold, or on account of subsequently discovered evidence, nullify the whole or part of any payment certificate to such extent as may be necessary to protect itself from loss on account of. 1. Defective work not remedied. 2. Claims filed or reasonable evidence indicating probable filing of claims; 3. Failure of the contractor to make payments properly to subcontractors or for material or labor; 4. Damage to other contractors' tools, materials, work or equipment; 5. Damage to public or private property. When the above grounds are removed, payment shall be made for amounts withheld because of it. Deductions for Uncorrected Work 14 of 27 Village Demolition — BID If the Village deems it inexpedient to correct work done in accordance with the Contract, an equitable deduction from the Contract price shall be made therefrom. Public Safety and Convenience During his operations, the Contractor shall keep the site of the work and adjacent premises as free from material, debris, excessive dust, and rubbish as is practical and shall remove same entirely and at once, if, in the opinion of the Supervisor, such material, debris, excessive dust or rubbish constitutes a nuisance, a safety hazard, or is objectionable in any way to the Public. Before the final acceptance of the work, the Contractor shall remove all temporary work, equipment, unused and useless materials, rubbish, debris, etc. and shall leave the site of work in a neat and presentable condition wherever his operations have disturbed conditions which existed at the time of starting work. The cost of this cleaning up shall be incidental to the contract. The Contractor shall be liable for damages to property, real or personal, which may arise from his operations under this contract. All existing structures in the vicinity of the work shall be protected against damage during performance of the work. The Contractor shall protect pedestrians, vehicles, streets, sidewalks and buildings against damage. Any damage so resulting shall be entirely the responsibility of the Contractor. Noise Restrictions All engines and engine driven equipment shall be equipped with an adequate muffler in constant operation and properly maintained to prevent excessive or unusual noise. This time regulation shall not apply to maintenance or operation of safety and traffic control devices such as barricades, signs, and lighting, or to work of an emergency -type nature. Exceptions: Any machine or device or part thereof which is regulated by or becomes regulated by Federal or State of Illinois noise standard shall conform to those standards. Requests to modify or deviate from these requirements shall be submitted in writing by the Contractor and must be approved in writing by the Supervisor. Village Demolition — BID CERTIFICATE OF COMPLIANCE DRUG FREE WORK PLACE ACT 30 ILCS 580/ 1 et. seq. I, Jettrcy M, Rilucane , the contractor under a certain contract dated: —mmmmmmmmmmmmmm with the Village of Mount Prospect for The ztoniolition of 19 & 21 S, Enierson S1, hereby certifies that said contractor shall, as a condition of the aforesaid contract, provide a drug free workplace by: A) Publishing a statement: I ) Notifying employees that the unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance, including cannabis, is prohibited at the contractor's workplace or work site; 2) Specifying the actions that will be taken against employees for violations of such prohibition. 3) Notifying the employee that, as a condition of employment on such contract, the employee will: a) abide by the terms of the statement; and b) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than 5 days after such conviction. B) Establishing a drug free awareness program to inform employees about: I ) the dangers of drug abuse in the workplace; 2) the contractor's policy of maintaining a drug free workplace; 3) any available drug counseling, rehabilitation, and employee assistance programs; and 4) the penalties that may be imposed upon employees for drug violations. C) Making it a requirement to give a copy of the statement required by subsection A) to each employee engaged in the performance of the contract and to post the statement in a prominent lace in the workplace or worksite. 16 of 27 Village Demolition — BID D) Notifying the Village of Mount Prospect within 10 days after receiving notice under part b) of paragraph 3) of subsection A) from an employee or otherwise receiving actual notice of such conviction. E) Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by any employee who is so convicted as required by paragraph H) below. F) Assisting employees in selecting a course of action in the event drug counseling, treatment, and rehabilitation is required and indicating that a trained referral team is in place. G) Making a good faith effort to continue to maintain a drug free workplace through implementation of the foregoing. H) Employee sanctions and remedies. A contractor shall, within 30 days, after receiving notice from an employee of a conviction of a violation of a criminal drug statute occurring in the workplace: 1) Take appropriate personnel action against such employee up to and including tennination; or 2) Require the employee to satisfactorily participate in a drug abuse assistance or rehabilitation program approved for such purposes by a Federal, State, or local health, law enforcement, or other appropriate agency. Contractor: By: _. Title: President SUBSCRIBED AND SWORN to before me this 7th day of .lune , 2018. NOTARY PUBLIC — 17 of 27 70FF1=ALEAL HELENA MORRIS C, STATE OF ILLINOIS p 018 Ex fres Oct 30,M2 y Village Demolition — BID 18 of 27 Village Demolition — BID CERTIFICATE OF COMPLIANCE CRIMINAL CODE OF 1961 720 ILCS 5/33/2 et. seq. 1, Jeffrey M. Finucane , the contractor under a certain contract dated, ......... with the Village of Mount Prospect for the demolition of 19 & 21 s Emerson streethereby certifies that said contractor is not barred from bidding on the aforesaid contract as a result of a violation of any applicable provision of the Criminal Code of 1961. Contractor: By: Title: President SUBSCRIBED AND SWORN to before me this 7th day of June— „ 2018. NOTARY PUBLIC OFFICIAL SEAL E ERINE HELENA NORRIS PUBLIC, STATE OF ILLINOISmission Expires Oct 30, 2018 19 of 27 Village Demolition — BID GENERAL CONDITIONS AND INSTRUCTIONS TO BIDDERS FOR PROCUREMENT OF MATERIALS The following conditions apply to all purchases/services and become a definite part of each invitation to bid where applicable. Failure to comply may disqualify your bid. ELIGIBILITY TO BID Neil -Discrimination iii 1aniplo mcnt - Contractor, in performing under this contract, shall not discriminate against any worker, employee or applicant, or any member of the public because of race, creed, color, age, sex or national origin, or otherwise commit an unfair employment practice. The bidder, his sub -contractors, or labor organizations furnishing skilled or unskilled workers, craft union skilled labor, or anyone who may perform any labor or service, shall commit within the State of Illinois, under this contract, any unfair employment practices as defined in the act of the 72nd General Assembly entitled "Fair Employment Practices Act". Contractor is referred to I11. Rev. Stat. 1961) ch. 48, paragraph 851 et seq. The contractor in all contracts entered into with suppliers of materials or services, and subcontractors and all labor organizations, furnishing skilled, unskilled and craft union skilled labor, or who may perform any such labor or services in connection with this contract. l) lrevaili��' Wa yes ittflicable - The bidder shall pay not less than the prevailing rate of wages as found by the Department of Labor or determined by the court to all laborers, workmen and mechanics performing work under this contract. Bidder must adhere at all times to Federal Wage Determination #I189-11, Rev. Stat. Section 39 S-2 (Modification #3). 2) Removal or Suspension of Bidders - The Village of Mount Prospect may remove or suspend any bidder from the bidder's list for a specified period not to exceed two (2) years. The Vendor will be given notice of such removal or suspension if: a) Services performed do not comply with specifications of contract with the vendor; b) Work is not done within the contract's specified in the contract; c) An offer is not kept firm for the length of time specified in the contract; d) Contractor fails to provide performance bond when required by invitation to bid; e) Contractor is found guilty of collusion; f) Bankruptcy or other evidence of insolvency is found; g) An employee currently serves as a Board member or employee of Mount Prospect and is financially involved in proposed work. 3) CQM. fiance to Law - a) The bidder shall at all times observe and comply with all laws, ordinances, regulations and codes of federal, state, county, and village governments and/or any other local governing agencies which may in any manner affect the preparation of proposal or the performance of this contract. 20 of 27 Village Demolition — BID b) All merchandise or commodities must conform to all standards and regulations as set forth under the Occupation Safety Health Administration (O.S.H.A.) CONDITIONS FOR BIDDING 1) jjjLJ1 Definitions - a) Bidding documents include the advertisement of invitation to bid, terms and conditions, scope of work / specifications, the bid price form and the proposed contract documents including addenda issued prior to receipt of bids. b) Addenda are written or graphic instruments issued prior to the execution of the contract that modify or interpret the bidding documents, including drawings and specifications, by additions, deletions, clarifications, or corrections. Addenda will become part of the contract documents when the contract is executed. 2) laid Price Form - Shall be submitted on the Bid Price Form provided, completed properly and signed in ink. Bid form shall be submitted in a sealed envelope plainly marked "Demolition - BID". 3) I..,atc Bids - Formal bids received after specified bid opening time will not be considered and will be returned unopened. 4) Withdrawal olBids -A written request for withdrawal is required and must be received before bid opening. After bid opening, bids become a legal document and an integral part of the bid and shall not be withdrawn. Such requests are to be directed to the attention of the Deputy Village Clerk, telephone number (630) 350-3404. 5) Examination o1' Bidding Documents -Each bidder shall carefully examine all contract documents and all addenda thereto and shall thoroughly familiarize himself with the detailed requirements thereof prior to submitting a proposal. Should a bidder find discrepancies or ambiguities in, or omissions from documents, or should he/she be in doubt as to their meaning, he/she shall at once, and in any event not later than ten (3) days prior to bid due date, notify the Village Clerk who will, if necessary, send written addenda to all bidders. The Village will not be responsible for any oral instructions. All inquiries shall be directed to the Village Clerk. After the bids are received, no allowance will be made for oversight by the bidder. 6) Mistake in Bid and Bid Cl hard - No bid may be modified after submittal. The bidder must initial erasures on the bid form. 7) IlLid 13indin ,, -Unless otherwise specified, all bids shall be binding for Ninety (90) days following the bid opening date. 8) !2-Laij yes ire C" � tract 1)c c�Nrnap its, - Changes or corrections may be made by the Village in contract documents after they have been issued by the Village to all bidders of record. Such addendum or addenda shall take precedence over that portion of the documents concerned, 21 of 27 Village Demolition — BID and shall become part of the contract documents. Except in unusual cases, addenda will be issued to each of the bidders at least four (4) days prior to date established for receipt of bids. 9) hid Attachments - Bidders shall attach to the bid form any descriptive material necessary to fully describe the merchandise he/she proposes to furnish. 10) Bidde s ("'onipctc� ce, - The Village may require proof of facilities or equipment, insurance coverage and financial resources to perform the work. If required, the bidder shall submit to the Village a properly executed Contractor's Qualification statement, AIA Document A305. The Village reserves the right to require specific references of communities or companies that have purchased like materials. 11) Bid_Openin - At the precise time set for bid opening, bids will legally be made public. Bidders or their representatives are encouraged to attend the bid opening. 12) Bid Awald - The bidder acknowledges the right of the Village to reject any or all bids and to waive informality or irregularity in any bid received and to award each item to different bidders or all items to a single bidder (to accept, split, and or reject part(s) of any of all bids). In addition, the bidder recognizes the right of the Village to reject a bid if the bidder failed to furnish any required bid security or to submit the data required by the bidding documents, or if the bid is in any way incomplete or irregular. AWARD OR REJECTION OF BIDS 1) Award or 1'�eiection - Contracts are awarded to the lowest, most responsible bidder. In determining the responsibility of a bidder, the following are taken into consideration: a) The character, integrity, reputation, judgment, experience an efficiency of the bidder; b) The current, uncompleted work in which a contractor is involved, which might hinder or prevent prompt delivery of the Merchandise; c) The financial resources of the bidder; d) Cash discounts offered; e) Quality, utility, suitability of work or material: the quality of the commodity to be furnished, as well as the price therefore, is to be taken into consideration, and a bid which is low in point of price may be rejected if the material to be furnished is not the best; f) Direct, indirect and incidental costs to the Village; 2) Notice ofAward - A delivered executed contract shall be the binding contract. CONTRACT PROVISION l) Material, L" ui ment and Workmanship: - Unless otherwise specified, the materials and equipment incorporated in the Goods will be new and of good quality. All workmanship will be of good quality and free from defects. CONTRACTOR shall, if required to furnish satisfactory evidence as to the source, kind and quality of the materials and equipment incorporated in the GOODS. Village Demolition — BID 2) Village Supervision - The Village Manager, or his/her designee, shall have full authority over the contracted work. He/she will interpret specifications in the event of a dispute. He/she may order minor changes in a specification if it becomes obvious to do so. Major changes will be treated as "additions". 3) Villa : C IrtsuI-anC I�Ctltl„lrelflnl — Contractors shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the CONTRACTOR, his agents, representatives, employees, or subcontractors. A) Minimum Scope of Insurance Coverage shall be at least as broad as: (l) Insurance Services Office Commercial General Liability occurrence form CG 0001 (Ed. 11/85) with the Village of Mount Prospect named as additional insured; and (2) Owners and Contractors Protective Liability (OCP) policy (if required) with the Village of Mount Prospect as insured; and (3) Insurance Service Office Business Auto Liability coverage form number CA 0001 (ED. 10/90 or newer), Symbol 01 "Any Auto." (4) Workers' Compensation as required by the Labor Code of the State of Illinois and Employers' Liability Insurance. B) Minimum Limits of Insurance Contractor shall maintain limits no less than: (1) Commercial General Liability $1,000,000 combined single limit per occurrence for bodily injury, personal injury, and property damage. The general aggregate shall be twice the required occurrence limit. Minimum General Aggregate shall be no less than $2,000,000 or a project/contract specific aggregate of $1,000,000. (2) Business Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. (3) Worker's Compensation and Employers' Liability: Workers' Compensation coverage with statutory limits and Employers' Liability limits of $1,000,000 per accident. C) Deductibles and Self -Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the Village of Mount Prospect. At the option of the Village of Mount Prospect, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the Village of Mount Prospect, its officials, agents, employees and volunteers; or the Contractor shall procure a bond guaranteeing payment of losses and related investigation, claim administration, and defense expenses. D) Other Insurance Provisions The policies are to contain, or be endorsed to contain, the following provisions: (1) General Liability and Automobile Liability Coverages Village Demolition — BID (a) The Village of Mount Prospect, its officials, agents, employees, and volunteers are to be covered as insured as respects: liability arising out of activities performed by or on behalf of the Contractor; premises owned, leased or used by the Contractor; or automobiles owned, leased, hired or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of protection afforded to the Village of Mount Prospect, its officials, agents, employees, and volunteers. (b) The Contractor's insurance coverage shall be primary as respects the Village of Mount Prospect, its officials, agents, employees, and volunteers. Any insurance maintained by the Village of Mount Prospect, its officials, agents, employees, and volunteers shall be excess of Contractor's insurance and shall not contribute with it. (c) Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the Village of Mount Prospect, its officials, agents, employees, and volunteers. (d) The Contractor's insurance shall contain a Severability of Interests/Cross Liability clause or language stating that Contractor's insurance shall apply separately to each insured against who claim is made or suit is brought, except with respect to the limits of the insurer's liability. (2) Workers' Compensation and Employers' Liability Coverage The insurer shall agree to waive all rights of subrogation against the Village of Mount Prospect, its officials, agents, employees, and volunteers for losses arising from work performed by Contractor for the municipality. (3) All Coverages Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, cancelled, reduced in coverage or in limits except after thirty (30) days prior to written notice by certified mail, return receipt requested, has been given to the Village of Mount Prospect. E) Acceptability of Insurers Insurance is to be placed with insurers with a Best's rating of no less than A-, VII, and licensed to do business in the State of Illinois F) Verification of Coverage Contractor shall furnish the Village of Mount Prospect with certificates of insurance naming the Village of Mount Prospect, its officials, agents, employees, and volunteers as additional insured's, and with original endorsements affecting coverage require by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements may be on forms provided by the Village of Mount Prospect and are to be received and approved by the Village of Mount Prospect before any work commences. The Village of Mount Prospect reserves the right to request full certified copies of the insurance policies and endorsements. Village Demolition —BID G) Subcontractors Contractor shall include all subcontractors as insured's under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverage's for subcontractors shall be subject to all of the requirements stated herein. H) Assumption of Liability The Contractor assumes liability for all injury to or death of any person or persons including employees of the Contractor, any sub -contractor, any supplier or any other person and assumes liability for all damage to property sustained by any person or persons occasioned by or in any way arising out of any work performed pursuant to this agreement I) Indemnity/Hold Harmless Provision To the fullest extent permitted by law, the Contractor hereby agrees to defend, indemnify, and hold harmless the Village of Mount Prospect, its officials, agents, and employees against all injuries, deaths, loss, damages, claims, patent claims, suits, liabilities, judgments, cost and expenses, which may in anywise accrue against the Village of Mount Prospect, its officials, agents, and employees, arising in whole or in part or in consequence of the performance of this work by the Contractor, its employees, or subcontractors, or which may in anywise result therefore, except that arising out of the sole legal cause of the Village of Mount Prospect, its agents, or employees, the Contractor shall, at its own expense, appear, defend, and pay all charges of attorney and all costs and other expenses arising therefore or incurred in connections therewith, and if any judgment shall be rendered against the Village of Mount Prospect, its officials, agents, and employees, in any such action, the Contractor shall at its own expense, satisfy and discharge the same. Contractor expressly understands and agrees that any performance bond or insurance policies required by this contract, or otherwise provided by the Contractor, shall in no way limit the responsibility to indemnify, keep and save harmless and defend the Village of Mount Prospect, its officials, agents, and employees as herein provided. The Contractor further agrees that to the extent that money is due the Contractor by virtue of this contract as shall be considered necessary in the judgment of the Village of Mount Prospect, may be retained by the Village of Mount Prospect to protect itself against said loss until such claims, suits, or judgments shall have been settles or discharged and/or evidence to that effect shall have been furnished to the satisfaction of the Village of Mount Prospect. 4) Deaf plt - The Village may, subject to the provisions specified herein, by written notice of default to the contractor, terminate the whole or any part of this contract in any one of the following circumstances: If the contractor fails to make delivery or to perform the services within the time specified herein or any extension hereof. In the event the board terminates this contract in whole or in part as provided above, the Village may procure, upon such terms and in such manner as the Village may deem appropriate, supplies or services similar to those terminated, and the contractor shall be 25 of 27 Village Demolition —BID liable to the Village for any excess costs for such similar supplies for services; PROVIDED that the contractor shall continue the performance of this contract to the extent not terminated under the provisions of this clause. 5) Bidder's Access to Procurement Infiormation - All procurement information concerning this bid shall be a public record to the extent provided in the Illinois Freedom of Information Act and Public Act 485-1295 and shall be available to all bidders as provided by such acts. 6) A M2tancc - Contracted work will be considered accepted when final payment is made. 7 1'0amerit - a) For services of merchandise ordered by purchase order, payment will be made to a vendor provided and service or merchandise has been properly tendered to and accepted by the Village. Payment by check to a vendor is mailed the week approval of payouts is made by the Board. Payout requests are considered at the regular Village Board meetings on the l st and 3rd Tuesdays of the month. 8) Guarantees and Warranties - a) All material, workmanship, services, and purchased commodities will be guaranteed from defects for a period of at least one (l) year, or for the period of time specified in the bid documents, based on the date of completion. Upon notice of defect, bidder shall make necessary repairs, without delay, at no extra charge to the Village. Said time period shall be based on date of completion. Upon written notice of defect, contractor shall make all necessary repairs, without delay, at no extra charge to the Village. b) All warranties for materials or equipment must be received with title before payment for same is recommended. 9) Chan ges/Additional Services/Deletions, - Any requests for changes or modifications to this contract must be submitted in writing and approved by the Village Manager, or his/her designee, prior to such changes or modifications being made. Any additional service desired from the contractor under this contract will be requested in writing and the additional charges for these services will be in accordance with the rate submitted on the proposal page and will be agreed to with the contractor prior to additional work commencing. In the event that charges for additional services cannot be agreed upon, bids will be requested. The Village reserves the right to negotiate additional services based upon the contractor's price and performance, within all legal constraints. l 0) Qj�nge Order Authorization - Pursuant to Public Act 85-1295 (I11.Rev.Stat.ch.38, paragraph 33E-1 et seq.). no change order may be made in this contract which would authorize or necessitate an increase or decrease in either the cost of the contract by $10,000.00 or more, or the time of completion by 30 days or more unless one of the following certifications is made by either the Village Board or its designee that: Village Demolition — BID a) Circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed; or b) The circumstances said to necessitate the Change were not within the contemplation of the contract as signed; or c) The change is in the best interest of the Village; The party authorized to execute the above certification is the Village of Mount Prospect, VENDOR: Delta Demolition, Inc. President Title...... ................... 6/7/2018 Date 27 of 27 Village of Mount Prospect: Signature Title Date ___—I DELTDEM-01 LLAN ,acoRO CERTIFICATE OF LIABILITY INSURANCE f DATE(MM/DD/YYYY) 06/07/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the polcy(es) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER License # 1 0029 081 9 CONTACT Kim Llanas NAME: Sheboygan, WI HUB International Midwest Limited PHONE FAX 832 Niagara Avenue (AIC, No, Eaa1)� INC, Not an W153081 E -M CL Sheboygan, ADLI ESS: SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Village of Mount Prospect THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 9 P ACCORDANCE WITH THE POLICY PROVISIONS. Community Development Department 50 S. Emerson Street Mount Prospect, IL 60056 AUTHORIZED REPRESENTATIVE { ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD INSURERS: AFFORDING COVERAGE _-- I11Af11II INSURER A: Hallmark Specialty Insurance Company - _ -- -2680$ INSURED INSURER B: Hastings - Mutual Insurance Company _ 14176 Delta Demolition Inc INSURER C: Rockhill Insurance 28053 6832 W North Avenue, Ste. 1A INSURERD:Mt. Hawley Insurance Company 37974 Chicago, IL 60707 - _ INSURERE .. .. ....... _ �. ._..... .................. ...... ..... ........... _...... .... ��.�.�,',_......... COVERAGES CERTIFICATE NUMBER: w .__, REVISION,:M:,,............... THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR ADDL UBR... TYPE OF INSURANCE POLICYNUMBER �... .. POLICY EFF POLICY EXP LIMITS ......_..IP.P.',�.Y,,1....LI/,0,„�,�m_... ..,� .......... . �_......,... ...._._.......,....�a.. A X COMMERCIAL GENERAL LIABILITY EACH OCC16TaRENCE' S 11000,000 CLAIMS -MADE X OCCUR 77GLO17DEFD 10/04/2017 10/04/2018 DAM AQE T R�ticrTED�ealale 50,000 5,000 NILI> LX' (AA_ia one' pfr$zw1) I"ul'RSONAL & ADV IIVJI, RY y, -- _ 1,000,000.. 2,000"000' GEN'L AGGREGATE LIMIT APPLIES PER: GI PTI IRAlIL AC GRI 0,A1 I::. POLICY X JERO LOC Tac,l:Iic.;r> IVIIar�alkAaaz $ 2,000,000 OTHER .,..w._.�..�_ ..e.-..-,,.,..... �a„-..,... __ ....-„-.,.... ,,.,,. _...-.... _.-..-.._.,...m.,,.�_...�..,,.�.�....._._. _ S B -AUTOMOBILE LIABILITY�w... C"OMU�a,A-1 SWIM E' #..V(vfi6'1.�,...,,,w,....-� Ma 1,000,000. X ANY AUTO ACV9966064 10/04/2017 10/04/2018 BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (I }el ra�A^rcta�l.l) 4 X AIIIT ONLY ? AI��fI'� ItTI�i.DY' (PerraccPROPER�nl.)AMAGE. C UMBRELLA LIAR X OCCUR EACH OCCURRENCE $ 5,000,000 X EXCESS LIAB CLAIMS -MADE FF01816801 10/04/2017 10/04/2018 AGGREGATE 5,000'000 DED X RETENTION $ 0 S B WORKERS COMPENSATIONPi.R AND EMPLOYERS' LIABILITY OTH X STAI�UIE ER YIN WC9966065 10/04/2017 10/04/2018 1,000,000 OFFICER/MEMBERANY / EXCLUDED? PROPRIETOR/PARTNER/EXECUTIVE N NIA E.L. EACH ACCIDENT $ (Mandatory in NH) E . DISEASE - EA EMPLOYEE $ 1,000'000 II ies doscnbeaun ei 1,000,000 r) ,SC�r PTPoE'N Or 0PERAiIONS below E41 VVI"�:('A"X, POLICY I..IMIT $ .................Pollut on..�M._.-..........-...........m.._._�m._.-._m................................ EGL0005180........................................................................10104)2017 D 10/04/2018 ...;._....i_...�__...�........_..__.�._...-__........................................ Llmlt 1 .. ,000,000 D Liability EGL0005180 10/04/2017 10/04/2018 Aggregate 2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 191, AddIl lonal Remarks Schedule, may be attached it more space is required) �..____,.-.,�..,_ ...............�..,.,._,.-..�.. Project: Demolition: of 1.9 & 21 S. Emerson Street, Mount Prospect, IL The Village of Mount Prospect, its officials, agents, employees and volunteers are recognized as Additional Insureds on a primary and non-contributory basis with respect to the General Liability policy per forms CG2010 (10/01) & CG2037 (10/1), Automobile policy per form PDO193 (4/10) and Pollution Liability policy per form EGL324 (06/09) . Waiver of subrogation applies to the Additional Insureds per form HGO028 (7/12) on the General Liability and per form WC000313 (4/84) on the Workers Compensation policy. Forms attached. SEE ATTACHED ACORD 101 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Village of Mount Prospect THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 9 P ACCORDANCE WITH THE POLICY PROVISIONS. Community Development Department 50 S. Emerson Street Mount Prospect, IL 60056 AUTHORIZED REPRESENTATIVE { ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD POLICY NUMBER: 77GLO17DEFD COMMERCIAL GENERAL LIABILITY CG 20 10 10 01 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY, ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Person or Organization: Any person or organization that is an owner of real property or personal property on which you are. performing ongoing operations, or a contractor on whose behalf you are performing ongoing operations, but only if coverage as an additional Insured Is required by a written contract or written agreement that is an "insured contract", and provided that the "bodily injury" "property damage" or "personal & advertising injury" first occurs subsequent to the execution of the contract or agreement. All locations otherwise covered by this insurance. With respect to the insurance afforded to these additional insureds the following may apply: 1. If required by written contract or written agreement that is an "insured contract" and provided that the "bodily injury", "property damage" or "personal &advertising injury" first occurs subsequent to the execution of the contract or agreement such insurance is afforded by this policy shall be primary insurance, and any insurance or self-insurance maintained by the above additional insured(s) shall be excess of the insurance afforded to named insured and shall not contribute to it. 2. If required by written contract or written agreement that is an "insured contract' and provided that the "bodily injury", "property damage" or "personal &advertising injury" first occurs subsequent to the execution of the contract or agreement, we waive any right or recovery we may have against an entity that is an additional insured per the terms of this endorsement because of payments we make for injury or damage arising out of "your on-going operations" done under a contract with person or organization. (If no entry appears above, information required to Declarations as applicable to this endorsement.) A. Section II —Who Is An Insured is (1) amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of your ongoing operations performed for that insured. B. With respect to the insurance afforded to these additional insureds, the following exclusion is added: 2. Exclusions This insurance does not apply to "bodily in- jury" or "property damage' occurring after: endorsement will be shown In the All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the site of the covered operations has been completed; or ' (2) That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20 10 10 01 0 ISO Properties, Inc., 2004 Page 1 of 1 POLICY NUMBER: 77GLO17DEFD COMMERCIAL GENERAL LIABILITY CG 20 37 10 01 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Person Or Organization: Any person or organization that is an owner of real property or personal property for whom you work or have worked, or a contractor on whose behalf you work or have worked, but only if coverage as an additional insured extending to 'bodily injury" or "property damage" included in the "products/completed operations hazard" is required by a written contract or written agreement that is an "insured contract" and provided that the 'bodily injury" or "property damage" first occurs subsequent to the execution of the contract or agreement. All locations otherwise covered by this insurance With respect to the insurance afforded to these additional insureds the following may apply: 1. If required by written contract or written agreement that is an "insured contract" and provided that the 'bodily injury', "property damage" or "personal &advertising injury" first occurs subsequent to the execution of the contract or agreement such insurance is afforded by this policy shall be primary insurance, and any insurance or self-insurance maintained by the above additional insured(s) shall be excess of the insurance afforded to named insured and shall not contribute to it. 2. If required by written contract or written agreement that is an "insured contract" and provided that the 'bodily injury", "property damage" or "personal &advertising injury' first occurs subsequent to the execution of the contract or agreement, we waive any right or recovery we may have against an entity that is an additional insured per the terms of this endorsement because of payments we make for injury or damage arising out of "your work" done under a contract with person or organization. no entry appears above, Declarations as applicable to this endorsement.) to complete this endorsement will be shown in the Section II —Who Is An Insured is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of "your work" at the location designated and described in the schedule of this endorsement performed for that insured and included in the "products - completed operations hazard". CG 20 37 10 01 © ISO Properties, Inc., 2004 Page 1 of 1 THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. DESIGNATED INSURED - PRIMARY AND NON-CONTRIBUTORY INSURANCE This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below: Endorsement Effective; 1I Countersigned By: (Authorized Representative) Any person or organization with whom you agreed because of a written contract, agreement or permit, to provide Liability Coverage afforded under Section II of the Coverage Form, but only with respect to your ownership, maintenance or use of a covered "auto". This coverage only applies to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. This provision only applies if the written contract or agreement has been executed or permit issued prior to the "bodily injury" or "property damage". The insurance provided to the additional insured applies on a primary and non-contributory basis when a written contract that is signed and executed before the damage occurs, and that is in effect during the policy period, requires this insurance to be primary and non-contributory. PD 01 93 0410 Page 1 of 1 Mt. Hawley Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED -- DESIGNATED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: ENVIRONMENTAL LIABILITY PACKAGE POLICY CONTRACTORS POLLUTION LIABILITY POLICY SECTION 11 — WHO IS AN INSURED Is amended to include as (an) additional insured(s), person(s) or organization(s) shown in the Schedule, but only with respect to liability caused, in whole or in part, by your acts or omissions or the acts or omissions of those acting on your behalf: A. In the performance of your ongoing operations; or B. In connection with your premises owned by or rented to you. Name of Person or Organization Those persons or organizations who you are required to add as additional insured on this policy under a written contract or written agreement. ALL OTHER TERMS AND CONDITIONS OF THIS POLICY REMAIN UNCHANGED. EGL 324 06 09 Contains copyrighted material of Insurance Services Office, Inc. Page 1 of 1 Insured THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - ONGOING OPERATIONS (With Primary and Waiver of Transfer of Rights of Recovery) This endorsement modifies insurance provided under the following Coverage Part: COMMERCIAL GENERAL LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART SCHEDULE Name of Additional Insured Person(s) or Oroanization(sl: Location(s) of Covered Operations Any person or organization that Is an owner of real All locations otherwise covered by this property or personal property on which you are insurance performing ongoing operations, or a contractor on whose behalf you are performing ongoing operations, but only if coverage as an additional Insured Is required by a written contract or written agreement that is an "insured contract", and provided that the "bodily Injury", "property damage" or "personal & advertising injury" first occurs subsequent to the execution of the contract or agreement Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section If Who Is An Insured is amended to include as an additional insured the person(s) or organizations(s) shown in the Schedule, but only with respect to liability of 'bodily injury", "property damage or "personal and advertising injury" caused, in whole or in part, by; 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; In the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. HG 00 28 07 12 Page 1 of 2 Includes copyrighted material of Insurance Service Office, Inc. with its permission.. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY, B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to 'bodily injury" or "property damage" occurring after: 1. All work including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operation has been completed; or 2. That portion of *your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations fora principal as a part of the same project C. With respect to the insurance afforded to these additional insureds the following may apply: 1. If required by written contract or written agreement that is an "insured contract" and provided that the 'bodily injury", 'property damage' or 'personal &advertising injury" first occurs subsequent to, the execution of the contract or agreement such insurance is afforded by this, policy shall be primary insurance, and any insurance or self-insurance maintained by the above additional insured(s) shall be excess of the insurance afforded to named insured and shall not contribute to it. 2. If required by written contract or written agreement that is an 'insured contract* and provided that the"bodily injury". -property damage- or "personal &advertising injury" first occurs subsequent to the execution of the contract or agreement, we waive any, right or recovery we may have against an entity that is an additional insured per the terms cf this endorsement because of payments we make for injury or damage arising out of 'your on-going operations" done under a contract with person or organization. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. HG 00 28 07 12 Page 2 of 2 includes copyrighted material of Insurance Service Office, Inc. with its permission. POLICY NAMED INSURED AND ADDRES ITEM 1. DELTA DEMOLITION INC 6832 W NORTH AVE STE 1A rwT rAr.n TL 60707 STANDARD WORKERS COMPENSATION TEL. NO. 920-457-7781 MARITIME INSURANCE GROUP INC 832 NIAGARA AVE SHEBOYGAN WI 53081 WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT WC 00 03 13 (ED. 04-84) COPYRIGHT 1983 NATIONAL COUNCIL ON COMPENSATION INSURANCE WE HAVE THE RIGHT TO RECOVER OUR PAYMENTS FROM ANYONE LIABLE FOR AN INJURY COVERED BY THIS POLICY. WE WILL NOT ENFORCE OUR RIGHT AGAINST THE PERSON OR ORGANIZATION NAMED IN THE SCHEDULE. (THIS AGREEMENT APPLIES ONLY TO THE EXTENT THAT YOU PERFORM WORK UNDER A WRITTEN CONTRACT THAT REQUIRES YOU TO OBTAIN THIS AGREEMENT FROM US.) THIS AGREEMENT SHALL NOT OPERATE DIRECTLY OR INDIRECTLY TO BENEFIT ANY ONE NOT NAMED IN THE SCHEDULE SCHEDULE BLANKET WAIVER FOR WORK PERFORMED UNDER CONTRACT REQUIRING THIS AGREEMENT nc�n+ %Tn Tdf'GTD nr' In PELTA lilac 06/07/2018 Page 1 of 14 About Us Delta Demolition, Inc. specializes in complete and total demolition of industrial, commercial and residential buildings. We are a well-established, family-owned business located in Chicago, Illinois and were incorporated in 1993. We bring over 50 years of business experience and employee expertise in the total demolition industry to each job we complete. Delta Demolition, Inc. is a Class "A" demolition contractor for the City of Chicago, and as such has shown our capabilities to perform a wide range of demolition and demolition -related services that are similar to the scope of demolition work required for projects that the Village of Mount Prospect manages. Delta Demolition, Inc. has performed numerous demolition and disposal projects of various size and scope for municipalities, housing authorities, school districts, corporations and private owners. We look forward to the possible opportunity of working with the Village of Mount Prospect. Our Employees Delta Demolition, Inc.'s employees have extensive experience in the demolition industry, with specific experience with municipalities, school districts and housing authorities. Our employees have completed hundreds of jobs for the City of Chicago and the Chicago Housing Authority since 1993 when Delta Demolition, Inc. was incorporated. Our operators, laborers and truck drivers have broad experience in the demolition industry and are qualified to perform wide ranging demolition projects. Our operators, laborers and truck drivers are members of the International Union of Operating Engineers — Local 150, Laborers Local 225 and Teamsters Local 731, respectively. Our projects are managed by Jeff Finucane, President of Delta Demolition, Inc. and the on-site operator, David Martin. Their resumes are included on Pages 3 and 4 of this Statement of Experience. Our Work and References Delta Demolition, Inc. is qualified to provide the labor, supervision, equipment and materials that are required to complete demolition projects in a safe, efficient and high quality manner. We are fully licensed, bonded and insured. We strive to complete all projects on time, on budget and with quality workmanship. We fully own a wide variety of vehicles and equipment that are used in our operations. This includes trucks, cranes, excavators, lifts, bobcats and crushers. These vehicles and equipment are regularly maintained to avoid mechanical delays. Listed on the following pages 5 through 14 are some of the projects we have performed. Additional project information and references are available on request. 06/07/2018 Page 2 of 14 Jeffrey M. Finucane Work Experience: Delta Demolition, Inc., Chicago, Illinois 1993 -Present President & Scheduler Oversee daily operations at individual job sites, organize daily scheduling of jobs and truck destinations, operate financial and executive decisions for the business, and perform demolition job duties when needed. L&J Hauling, Inc., Chicago, Illinois President & Scheduler 1990-1993 Operated a full scale demolition company on a smaller level, performed all aspects of a demolition business which included driving a truck, operating machinery, laboring, and organizing all employees and business decisions. K&B Wrecking, Inc., Summit, Illinois 1988-1990 Truck Driver, Operator, & Foreman Performed all duties of a demolition company. I learned all aspects and duties needed to run a demolition job and company. G.M. Demolition, Thornton, Illinois Truck Driver Operated a truck which hauled demolition debris to the dump and moved various machinery to the demolition jobs. Education: Marquette University, Milwaukee, Wisconsin 1984-1987 Studied Engineering and Business Management 06/07/2018 Page 3 of 14 David Martin Certified and Licensed Crane Operator, City of Chicago Work Experience: Delta Demolition, Inc., Chicago, Illinois Heavy Equipment Operator 6/1999 -Present Operate all types of heavy equipment in demolition of buildings, including front end loaders, backhoes and cranes. Supervise demolition projects, manage demolition field crew. M & R Wrecking, Inc., McCook, Illinois 1997-1999 Heavy Equipment Operator Performed same duties as above. National Wrecking Co., Chicago, Illinois 1996-1997 Heavy Equipment Operator Performed same duties as above. K & B Wrecking Co. McCook, Illinois 1995-1996 Heavy Equipment Operator Performed same duties as above. G.M. Wrecking, Thornton, Illinois 1985-1995 Heavy Equipment Operator Performed same duties as above. 06/07/2018 Page 4 of 14 References Customer: City of Chicago Marlene Hopkins Managing Deputy Commissioner City of Chicago Department of Buildings 2045 W. Washington Chicago, IL 60607 Phone: 312-744-3449 MMaarlene.h skinscityaf i uca .org Jorge Herrera Chief Inspector Demolition City of Chicago Department of Buildings 2045 W. Washington Chicago, IL. 60607 Phone: 312-743-3556 &rLgJ1er-L cSi y f hac cammglg We have performed hundreds of demolition projects for the City of Chicago. A couple of recent projects with the City of Chicago include: 1. Prject Location: 7439! S. Cottage Grove Project Number: 17-346 Gross Revenue: $90,650 Start Date: 6/19/2017 Completion Date: 8/17/17 Services Provided: Wreck and remove a 50+ year old, 3 story, 18,750 square feet, brick storefront and warehouse building. 2. Pr9j4zct,Locatio X842 W 53,d place Project Number: 17-371 Gross Revenue: $15,150 Start Date: 8/25/2017 Completion Date: 8/28/17 Services Provided: Wreck and remove a 50+ year old, 2 story frame residential building. 06/07/2018 Page 5 of 14 References Customer: Krause Construction Daniel J. Krause Krause Construction 3330 Edison Street Blue Island, IL 60406 Phone: (708) 269-9507 dk[gyd t@kraL�s.ecsi.com. Project Revenue: $59,750 Start Date: 6/26/2017 Completion Date: 7/3/2017 Services: Wreck and remove 4 buildings in Summit, IL Prigt a4dc r ss, 7°" Street Harlem '57"h' _I ace. SumrnIt Four Structures 5700 S_ Harlem 5702 S. Harlem 5706 S_ Harlem 5710 S_ Harlem 06/07/2018 Page 6 of 14 References Customer: Village of Hanover Park Reference: Andy Sikich Interim Village Engineer Public Works, Village of Hanover Park 2041 Lake Street Hanover Park, IL 60133 Phone: 630-823-5650 Project Name: Ontarioville and Church Rd. Demolitions Gross Revenue: $73,000 Start Date: 1/8/2018 Completion Date: 2/2/2018 Services Provided: Demolish and remove 3 residential buildings 1909 1931 & 1945 ODntarioville and 7N536 Church Road 06/07/2018 Page 7 of 14 References Customer: Novotny Engineering/Village of Lyons James L. Cainkar, P.E., P.L.S. Novotny Engineering 545 Plainfield Road, Suite A Willowbrook, IL 60527 Phone: (630) 887-8640 jin�dair7n�C�r,fra�r�4cnov�nw� i�terrrlg;,±cmrls BEOMMOMMM&II71's,, Project Name: 4043 South Joliet Avenue Gross Revenue: $16,700 Start Date: 7/10/2017 Completion Date: 7/13/2017 Services Provided: Demolish and remove a 1 story commercial building. 06/07/2018 Page 8 of 14 References Customer: The Chicago Housing Authority Reference: Ms. Cynthia Brewer Project Manager, Capital Construction Division The Chicago Housing Authority 60 E. Van Buren Chicago, IL 60605 Phone: 312-913-7344 cb�mwer.'�hecl°ra pl:g We have completed many projects for the CHA including high-rise, mid -rise and low-rise demolition projects and our total work with the CHA exceeds $18M in revenue. Three examples of our work with the CHA are: 1. Pro"ect Name: Ida B. gi Mid -Rise Buildings (r buildingsl!. Project Number: CHA 7076-07 Gross Revenue: $2,365,700 Completion Date: 6/1/2009 Addresses: 511 E. Browning, 527 E. Browning, 540 E. 361h Street, 559 E. Browning, 575 E. Browning, 574 E,. 36th Street. 2. PEaDj ct Naime: LeCiaire Homes (Groups 1-3) 06/07/2018 Page 9 of 14 Project Numbers: CHA 1067, 1068 & 1069 Gross Revenue: $1,196,410 Completion Date: 8/1/2011 Various Addresses: Group 1: 4414-20 S. Cicero/4434-40 S. Cicero; 4400-10 S. Cicero; 4801-23 W. 44th St; 4422-32 S. Lacrosse/4425-35 S. Lacrosse; 4413-23 S. Lacrosse/4437-47 S. Lacrosse; 4406-11 S. Lacrosse; Group 2: 4841-55 W. 44th Place; 4442-52 S. Cicero; 4800-22 W. 45th St./4832-54 W. 45th St.; 4449-59 S. Lacrosse; 4452-62 S. Lacrosse/4461-71 S. Lacrosse/4431-41 S. Lamon; 4473-79 S. Lacrosse; Group 3: 4839-49 W. 44th St./4405-15 S. Lamon; 4852-54 W. 44th PI/4400-02 S. Lacrosse/4428-30 S. Lacrosse/4401-03 S. Lamon; 4438-48 W. 44th PI/4416-26 S. Lacrosse; 4404-14 S. Lacrosse l 3. Project Name: Ida Wells Low-RiseHusj g j16 buildings Project Number: CHA 601-05 Gross Revenue: $1,037,190 Completion Date: 9/1/2005 Various Addresses: 601-07 E. 38th PI.; 629-39 E. 38th PI.; 3841-59 S. Vincennes; 609-17 E. 38th PI/612-18 E. 39th St.; 619-27 E. 38th PI./620-28 E. 39th St.; 641-47 E. 38th PI./642-48 E. 39th St.; 600-10 E. 39th St; 630-40 E. 39th St.; 601-07 E. 38th St.; 631-41 E. 38th St.; 3809-29 S. Vincennes; 609-19 E. 38th St./618-26 E. 38th Pl.; 621-29 E. 38th St./628-39 E. 38th PI.; 643-51 E. 38th St./650-58 E. 38th PI.; 606-16 E. 38th PI.; 638-48 E. 38th PI. 06/07/2018 Page 10 of 14 References Customer: Town of Cicero Project Management: Frank Novotny & Associates, Inc. Reference: Tim Geary, P.E. Frank Novotny & Associates 825 Midway Drive Willowbrook, IL 60527 Phone: 630-887-8640 tg ary@fr nkr►s my g'rs tij Project Name: Town of Cicero: Project #13 Gross Revenue: $280,785 Start Date: 11/2014 Completion Date: 3/2015 Services Provided: Demolish and remove 3 residential and 2 commercial buildings 5350 W.Cermak Road 1342 S. 50th Court 4900 W. 301h Place 4632-34 W. 211t Place 06/07/2018 Page 11 of 14 References Customer: New Life Covenant Church Project Management: McKissack and McKissack Project Manager and Reference: Derrick Bailey McKissack and McKissack 205 N. Michigan Avenue Suite 1930 Chicago, Illinois 60601 Phone: (312) 622-8869 Dgrack . „mckiss ckrn w.corn Pr�ctAddresses:751^ . re�e�rnrlatacd 7621 .Gr+een�wood, Gross Revenue: $639,908 Start Date: 11/1/2014 Completion Date: 6/30/2015 Services Provided: Demolish and remove two brick commercial buildings to prepare for construction on the site.. 06/07/2018 Page 12 of 14 References Customer: Cicero School District 99 Project Management: ICI, Inc. Project Manager and Reference: Thomas E. Binder, LEED AP BD+C ICI, Inc. 977 South Route 83 Elmhurst, IL 60126 Direct Phone: 630.941.6845 Cell Phone: 630.936.3625 jErq jgcctAddress: 1225 — 1239 S. 60' C'our't„ Project Name: Cicero School District 99 Gross Revenue: $497,000 Start Date: 2/15/2015 Completion Date: 4/15/2015 Services Provided: Demolish and remove a 2 -story school and two residential buildings to prepare for construction on the site. 06/07/2018 Page 13 of 14 References Customer: S Oiler LLC / Allied Metal Company Reference: Joel Fink President and CEO, Allied Metal Company 4528 W. Division St. Chicago, IL 60651 Phone: (312) 225-2800 Finkerinv@aol.com Project Address: 4500 W. division Project Name: 4500 W. Division Gross Revenue: $240,000 Start Date: 7/9/2015 Completion Date: 9/1/2015 Services Provided: Demolish and remove a 1 % story industrial building. 06/07/2018 Page 14 of 14