Loading...
HomeMy WebLinkAbout8.1 Motion to accept the proposal from FGM Architects for new Police StationBoardDocs® Pro Page I of 2 Agenda Item Details Meeting Apr 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m. Category 8. VILLAGE MANAGER'S REPORT Subject 8.1 Motion to accept the proposal from FGM Architects for architectural services to design the new police headquarters located at 799 Biermann Court in an amount not to exceed 1,197,085.00 and authorize the Village Manager to execute a contract for the same services subject to staff and attorney review. Access Public Type Action Preferred Date Apr 17, 201,V, Absolute Date Apr 17, 2014 Fiscal Impact Yes Dollar Amount 11197,085.00 Budgeted N is: gKoget Source Segregatedl �*Jj =*elFV1r4FMWo9f*WffX0* lZ9419M.-Til Recommended Action Approve to approve a contract with FGM Architects, Inc. for Architectural Design services for the new Police Headquarters. Public Content Information The Village issued a Request For Proposal (RFP) on March 7, 2018 for Architectural Design services for the adaptive reuse of 799 Biermann Court for the new Police Headquarters. The RFP was advertised in the Daily Herald, posted online on the Village website, emailed directly to a number of experienced public safety Architects, and was made available at the Community Development counter. The deadline for submittals was March 28, 2018 at 3:00 pm. Six firms responded with proposals. Proposals were evaluated by a selection team of Village Staff from several departments including the Manager"s Office, the Police Department, Public Works, and Community Development. Evaluations were based upon four major criteria weighted equally: • specific project understanding, • a thorough understanding of the scope of work, • the qualifications of the proposed design team members, an'JJ • overall experience with Police projects. The six responding firms were Legat Architects, Cordogan Clark Architects, the DLR Group, Williams Architects, FGM Architects, and Wold Architects. It was a unanimous decision by the selection team that FGM Architects, Inc. is the most qualified of all the submittals because of their detailed statement of project understanding, their completeness in summary of the scope of work required to complete this project, the overall longevity and experience of their Staff dedicated to this project, and their overall experience with Police projects, more specifically with their nine previous adaptive reuse police stations. Their history working with the Village on previous building projects and the space needs study already performed, FGM Architects is uniquely qualified to perform the design of the new Police Headquarters. https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 6/12/2018 BoardDocs® Pro Page 2 of 2 The second portion of the proposal evaluation was fee based. The low bidder was FGM Architects, Inc. with a bid of $1,197,085.00 while the next closest bidder was Wold Architects at $72,450.00 more expensive and they were considered the 4th most qualified Architect of the group. The second most qualified bidder in staff evaluations was the DLR Group and they returned a fee proposal $223,722.00 higher than FGM. Task FGM Wold AE Legat DLR Groupr I rk Willia Preliminary Design $164,248 $190,444 $261,855 $118,487 $324,471 $210,000 Design Development $232,863 $317,406 $316,570 0 $294,974 $270,000 Construction Documents $440,744 $507,850 $488,235 $839,001 $560,451 $550,000 Furniture Coordination $10,800 0 $3,840 $23,443 $5,00 0 Construction Administration $348,430 $253,925 $272,520 $439,876 $294,974 $470,000 Total Base Fee $1,197,085 $1,269,625 $1,343,020 $1,420,807 $1,479,870 $1,500,000 As FGM Architects, Inc. provided the lowest fee and had the highest rated qualifications, they are the recommended Architect by • complete the design of Police Headquarters. Alternatives 1. Village Board approval of a resolution to contract with FGM Architects, Inc. for Architectural Design services for the new Police Headquarters. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends the Village Board approval of a resolution to contract with FGM Architects, Inc. for Architectural Design services for the new Police Headquarters. Administrative Content Executive Content Motion & Voting Approve to approve a contract with FGM Architects, Inc. for Architectural Design services for the new Police Headquarters. Motion by Michael Zadel, second by Richard Rogers. Yea: Eleni Hatzis, Richard Rogers, Colleen Saccotelli, Michael Zadel Nay: Paul Hoefert https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 6/12/2018 Mount Pmspect Village of Mount Prospect Police Architectural Services for the New Police Headquarters 3:00 P.M., Wlardh1 Proposals Due: Mount Prospect Village Hall Building Department- 2nd Floor 50 S. Emerson Street Mount Prospect, IL 60056 No late proposals will be accepted. Proposals received after the deadline will be rejected. March 7, 2018 Obtain information from and submit proposals to: Mark Rysavy Deputy Director, Building & Inspection Services Village of Mount Prospect 50 S. Emerson Street Mount Prospect, IL 60056 847.818.5350 Note: This cover sheet is an integral part of the contract documents and is, as are all of the following documents, part of the contract executed between the Village of Mount Prospect and any successful firm. Mount Prospect Police Headquarters- Architectural Services Page 2 of 13 TABLE OF CONTENTS Page CoverSheet.................................................................................................... 1 Tableof Contents............................................................................................ 2 Letterof Intent................................................................................................. 3 Special Provisions and Request for Qualifications .......................................... 4 Fee Proposal & Acknowledgement Form................................................8 Conceptual Site Layout......................................................................11 Mount Prospect Police Headquarters- Architectural Services Page 3 of 13 March 7, 2018 Re: Submittal Request Dear Consultant: The Village of Mount Prospect will accept sealed proposals until 3:00 P.M., March 28, 2018 for Architectural Services for the new Police Headquarters. Take note of the necessary signatures, various submission requirements and proposal criteria for this submittal. Please submit one original and eight copies of your proposal. We ask that you submit one electronic version of your proposal on a USB drive. Do not submit on a cd or dvd. Proposals will be evaluated on qualifications and overall fee cost proposals The Village of Mount Prospect reserves the right to reject any or all proposals, to waive any and all technicalities or to accept the proposal deemed most advantageous to the Village. We welcome your submittal Sincerely, Village of Mount Prospect Mark Rysavy Mark Rysavy Deputy Director, Building & Inspection Services Any and all questions shall be submitted via email to rnrysaw mountprospect.org only. No verbal answers will be provided. If a question is answered by the Village it will be distributed to all rfp holders. Mount Prospect Police Headquarters- Architectural Services Page 4 of 13 SPECIAL PROVISIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR THE NEW MOUNT PROPSECT POLICE HEADQUARTERS INTRODUCTION The Village of Mount Prospect (hereafter "Village") is soliciting qualifications from architectural firms licensed in the State of Illinois for the furnishing of architectural services for the design, construction documents, and construction administration for the new Police Headquarters. The Village intends to enter into a contract with the selected firm that is determined to be the best qualified and responsible firm for such services, and accordingly is seeking certain information whereby such professional service capabilities can be evaluated. In addition to qualifications, price proposals will be considered in the selection process. Architectural firms desiring to submit proposals shall follow the outline and instructions as follows, furnishing all requested information. All proposals will become the property of the Village. BACKGROUND The Village has entered into negotiations to purchase the existing 103,000 square feet warehouse building located at 799 Biermann Court within Mount Prospect in anticipation of an adaptive reuse of the building to house the new Police Headquarters. Through a process of partial demolition and a small addition, the police facility would include all functions typically associated with a modern police facility, including detention facilities, evidence storage, indoor squad parking, departmental offices, and a gun range. The expected new building square footage is in the range of 87,000 square feet. Included in this project is a limited amount of site work to provide access to Kensington Road on the north end of the site and the introduction of a new "public face" to the building from this north side of the building. The Mount Prospect Police Department is currently co -located with the Fire Department at 112 E. Northwest Highway in Mount Prospect and has 83 full-time sworn employees, and 19 full-time and 4 part-time civilian employees for a total staff of 106. In addition, 55 police dedicated vehicles will be housed within the building and on the site. The Village seeks the services of a qualified architectural firm with experience in police facility planning and design, construction documents, and construction administration. In addition, the Village plans to hire the construction manager early in the design process to help evaluate the project budget as design is ongoing, and to be part of the design and construction team. Mount Prospect Police Headquarters- Architectural Services Page 5 of 13 GENERAL SCOPE OF SERVICES The contract for architectural services will consist of all labor and material necessary for the design, construction documents, and construction administration of the new Police Headquarters. The contracted Architect will perform or be responsible for the performance of the following services in connection with this project. Tasks may include, but are not limited to: 1) Review and application of the Space Needs Analysis completed by FGM Architects, Inc., dated November 10, 2017. This analysis can be downloaded from the Village website at: .uinu.su�IuIT cI.uIT / cu�cc 1u.s 2) Based on the Space Needs Analysis and meetings with Village Staff identify departmental proximity requirements and develop a preliminary building layout. Preparation for a minimum of two public presentations to the Village Board and/or Committee of the Whole, along with two public open houses to discuss the design is expected; 3) Conduct tours of previously constructed Police Facilities in the Chicago area to Village Staff and Elected Officials to discuss spatial proximities, material selections, and what has worked versus not worked in the previous designs; 4) Once an interior building layout and overall exterior appearance have been settled upon, design developmentwill begin. Building systems, materials and finishes will be discussed. More specific budgeting will be developed in conjunction with the construction manager. Additionally, Village Staff has been working with the ComEd Energy Efficiency Program to design the building to a higher level of efficiency. The architect, by signing this proposal, acknowledges all efforts will be made to incorporate the desired efficiency goals into this design. See attached efficiency program goals exhibit. Preparation for a minimum of two public presentations to the Village Board and/or Committee of the Whole is expected; 5) Upon design development completion, construction documents will be prepared. All structural, MEP, fire protection, civil, and interior designs will be documented on the final permit and bidding documents. If the civil design is performed by the Village Staff, architect shall include fees for coordination in base offering and the cost for actual civil engineering as an alternate as listed on the proposal form; 6) Final budget review and preparation for a minimum of two public presentations to the Village Board and/or Committee of the Whole is expected; and 7) Attend weekly construction meetings to review work completed, issues in the field, and monthly construction pay requests. Complete construction administration after final certificate of occupancy is obtained and all punch list items have been corrected. The Architect should amplify, clarify or expand on the scope of services as appropriate and necessary for the proper performance and completion of the project. SELECTION AND PROJECT SCHEDULE The selection process will entail multiple steps: 1. Issuance of the RFP by the Village. 2. Submittal of written proposals from the Architects. The submittal shall include the Architect's Project Understanding, Scope of Work and other pertinent information to enable the Village to determine the Most Qualified Firm (MQF) for this project. The Mount Prospect Police Headquarters- Architectural Services Page 6 of 13 Architect shall provide a detailed and thorough analysis of the project and the scope of work to clearly demonstrate his understanding and insight into the project. In addition a fixed price proposal form shall be completed. 3. The Village's selection committee will review the proposals received and rank the firms in order to determine the MQF for this project, using both qualifications and fixed price proposal as determining factors. Individual interviews may be scheduled with each of the finalists as identified by the selection committee. 4. The selection committee will meet with the MQF to negotiate the scope of work, the work effort and the fee. If the Village and the Architect come to agreement over the scope of work, the work effort and the fee, then the Village will prepare an engineering agreement between the Village and the Architect for execution by the Architect and Village. If the Village and the Architect cannot come to agreement over the scope of work, the work effort and the fee, then the Village will proceed to negotiate with the second ranked firm. Selection Schedule RFQ Issued 03/07/2018 Proposal Due 03/28/2018 Selection Committee Review 04/06/2018 Interviews & Negotiations 04/18/2018 Committee Agenda 04/24/2018 Board of Trustees Approval 05/01/2018 Project Schedule* Kick -Off Meeting 05/02/2018 Potential real estate closing 05/01/2018 Anticipated ground breaking 12/01/2018 * Architect shall submit a realistic schedule for the completion of the work effort. EVALUATION OF PROPOSALS The Architect shall submit written proposals which meet the requirements outlined herein. All proposals that meet these requirements shall be evaluated based upon a scale of 1 to 10 in the following categories. DETERMINATION OF MOST QUALIFIED FIRM: A) Project Understanding Criteria: Is a clear understanding of the project stated and demonstrated throughout? Is the scope detailed and comprehensive? Is the scope consistent with the teaming and staffing levels? Are innovative techniques presented? Has the Architect included a detailed analysis of the project, its requirements and areas of concern? B) Scope of Work Criteria: Is the scope detailed and comprehensive? Is the scope consistent with the teaming and staffing levels? Are innovative techniques presented? C) Project Team Criteria: Is the project manager qualified to manage all phases of the project? Has the project Architect demonstrated ability in similar projects? Does the support staff have extensive experience with related work? Is there an appropriate mix of professional and technical staff? Are all required disciplines identified for this scope of work? If sub -consultants are proposed, have they worked with the consultant before? Have all team members had similar experience Mount Prospect Police Headquarters- Architectural Services Page 7 of 13 regarding project scope and magnitude? D) Experience Designing Public Facilities Criteria: Has the firm designed a building for a public body? Has the firm designed a police facility? More weight will be given to those firms that have designed police facilities, and especially adaptive reuse projects. Provide visual examples of work, both in exterior pictures and simple floor plans. Provide overall project costs for each example. List the original project budget and the final project budget for each. If a project is over budget, what is the justification? Criteria Weight Project Understanding 25 x score 1-10 Scope of Work 25 x score 1-10 Project Team 25 x score (1 - 10) Experience Designing Public Facilities 25 x score (1-10) Total Maximum Points 1000 PROPOSALFORMAT The name of the firm and the location of the office which will have responsibility for this project must be indicated along with the name, address and phone number of a contact person responsible for and knowledgeable of this proposal. List the project team as follows: 1) Names of all principals/partners and/or parties having any interest in the firm; 2) Date the company was founded; 3) General nature of work experience/specialties; 4) Number of professional and support staff (by general classification) located in Illinois; 5) Organizational chart including office locations for each member; 6) Estimated fee income for professional services in 2018 7) Project history for the past five (5) years 8) List of similar projects performed by the firm Proposals shall be organized in the following manner. ❑ Introduction ❑ Project Understanding ❑ Scope of Work ❑ Proposed Schedule ❑ Project Team and Organization Chart ❑ Project Team Resumes ❑ Project Proposal Form Submit one original and eight copies of your proposal. The VILLAGE would also appreciate one electronic version of your proposal on a USB drive. Do not submit on a cd or dvd. Proposals will be evaluated on qualifications and overall fee cost proposals. Provide an hourly break -down for the project elements identified in your Project Understanding and Scope of Work. Include a detailed listing of items which are not included in the base fee which would be billed as reimbursable expenses. The actual fee shall be negotiated based upon concurrence of the project scope and work effort. Mount Prospect Police Headquarters- Architectural Services Page 8 of 13 Fee Proposal and Acknowledgement Form (Fixed fee pricing to be based on an expected $22,000,000 construction budget and 87,000 s.f. of construction. No percentage based fees will be accepted. All costs within 5% of proposed cost and size shall be covered by this fixed fee. Additional fees beyond 5% will be negotiated.) Base Proposal Pricing: Preliminary Design $ Design Development $ Architectural Construction Documents including: • Mechanical Design • Electrical Design • Low Voltage/data/cctv Design • Plumbing Design • Fire Protection Design • Structural Design • Coordination with Village Supplied Civil Design Coordination with owner supplied furniture designer $ Construction Administration $ Total Base Proposal Pricing: . . . . . . . . . . . . . . . . . . $ Additional Services Pricing: Civil Engineering, including initial surveying $ LEED Silver Commissioning $ LEED Gold Commissioning $ Provide a list of expected hours to complete each of the line items above, along with a current hourly rate chart. See the attached diagram of the building and site modifications anticipated by the owner. Acknowledgements 1. As the Village is committed to energy efficiency in the design and operation of this project, will you agree to design to the level of proposed energy efficiency as set forth in the attached ComEd Efficiency Program documents, as long as it is economically feasible in the project budget? Yes No Mount Prospect Police Headquarters- Architectural Services Page 9 of 13 2. Will all Construction Document drawings be prepared in a 3-D format? a. Architectural Yes_ No b. Structural Yes_ No c. Electrical Yes_ No d. HVAC Yes_ No e. Plumbing Yes_ No f. Fire Protection Yes No 3. Controlling the Cost of Construction is a vital part of this project's success. The Village believes this can be best achieved by the entire team (Owner, A/E and CM) working together to achieve this goal. Will you agree to design to a Budget Amount for each of the disciplines (Architectural, Structural, Electrical, HVAC, Plumbing and Fire Protection)? The Budget Amount for each "trade" will be developed as part of the Pre - Construction process with the collaborative effort of the Owner — Construction Manager and A/E Team. Yes No If no, please explain why. 4. The Village believes that competition among subcontractors and suppliers during the bidding phase is critical to ensuring best value results for the bidding of the work. Therefore it is vitally important that the bidding documents are NOT proprietary or "sole source" in any way. Will you agree to structure the design and specifications to include a minimum of three named manufacturers or suppliers (Please Note: the "basis of design" approach will NOT be an acceptable alternative to providing three manufacturers or suppliers.) for all systems, products, materials, including but not limited to: a. HVAC systems and equipment, temperature control systems and equipment, b. electrical systems and equipment, not including light fixtures, c. plumbing systems and equipment, d. building envelope systems and components (roofing, curtainwall, windows, masonry, etc.) and, e. most finish materials (ceiling systems, paint, wall protections, cabinets, etc.) Only in circumstances where the Village specifically authorizes in advance a sole source will a design and specification approach other than that described above be allowed. Those instances are likely to be with ceramic tile, carpet, vinyl tile, and lighting fixture selections. Yes we agree No we do not agree 5. The Village believes in a negotiable terms for errors and omissions within the drawings. At no point will compensation for errors and omissions be waived in the contract between owner and architect. Do you agree to these terms? Yes No Mount Prospect Police Headquarters- Architectural Services Page 10 of 13 VILLAGE OF MOUNT PROSPECT PROJECT PROPOSAL FORM We hereby agree to furnish to the Village, services as outlined in the accompanying proposal in accordance with provisions, instructions, and specifications of the Village. This form must be signed by an authorized agent of the Architect. If the Architect is a corporation, the corporate seal must be affixed. The successful Architect will be required to agree to sign the Village contract and attached appendices (sexual harassment policy, tax liability, etc.). The proposal shall be binding for ninety (90) days following the proposal due date. My signature certifies that the Proposal as submitted complies with all terms and conditions as set forth in the Notice of Request for Qualifications for ARCHITECTURAL SERVICES FOR THE NEW POLICE HEADQUARTERS. I/We certify that I/We am/are authorized to sign as an agent(s) of the firm: PLACE CORPORATE SEAL HERE By..............................: Print Name ...................: Position / Title ...............: Company Name .............: Address Line 1 ..............: City, State, ZIP ..............: Telephone ....................: Email...........................: Mount Prospect Police Headquarters- Architectural Services Page 11 of 13 Conceptual Site Layouts Ki aNei tog Keay.. Mount Prospect Police Headquarters- Architectural Services Page 12 of 13 OPTION 1 E Mount Prospect Police Headquarters- Architectural Services Page 13 of 13 FGM ARCHITECTS Village of Mount Prospect Mount Prospect Police Department Architectural Services for the New Police Headquarters Mr. Mark Rysavy Deputy Director, Building & Inspection Services Village of Mount Prospect 50 South Emerson Street Mount Prospect, Illinois 60056 847.818.5350 phone mryscivy@mountprospect.org Mr. Raymond Lee, AIA, LEED AP Principal Principal -in -Charge FGM Architects Inc. 1211 West 22"d Street Suite 700 Oak Brook, Illinois 60523 630.574.8711 phone rayl@fgmarchitects.com March 28, 2018 Village of Mount Prospect - Mount Prospect Police Department Qualifications C 2018 FGM Architects FGM ARCHITECTS TABLE OF CONTENTS Tab1 Introduction.......................................................................................................................01 Tab 2 Project Understanding & Scope of Work..........................................................................09 Tab3 Proposed Schedule...........................................................................................................17 Tab 4 Project Team and Organization Chart..............................................................................19 Tab 5 Project Team Resumes.......................................................................................................21 Tab 6 Project Proposal Form....................................................................................................... 77 Village of Mount Prospect - Mount Prospect Police Department Table of Contents © 2018 FGM Architects FGM ARC -'H I T E C T S March 28, 2018 Mr. Mark Rysavy Deputy Director, Building & Inspection Services Village of Mount Prospect 50 South Emerson Street Mount Prospect, Illinois 60056 Re: Architectural Services for the New Police Headquarters Dear Mr. Rysavy, It is with great excitement that we submit our proposal for Architectural Services for the Village of Mount Prospect Police Department New Police Headquarters. Having recently completed the Police Station Space Needs Study, we are very familiar with this project and hope that, during the study process, we have demonstrated our expertise, creativity and commitment to achieving the goals of the Village of Mount Prospect. We sincerely wish to continue our relationship by assisting the Village in designing a new police station for your community. Through our response to your Request for Proposal, we want to again illustrate what we do best — design police stations. FGM's Police Team is Second to None — The team that worked on your feasibility study will continue to serve on this project and includes Ray Lee as Principal -in -Charge, Jason Estes as Project Manager, and Louise Kowalczyk as Project Designer. These three individuals have over 50 years combined experience in the planning and design of police stations and will lead the Village through the process. FGM is a Leader in Police Station Design — As a leader in police station design, we understand the issues of having a facility that is not only welcoming to the public but also secure. We advocate current police station design principles and we are very familiar with CALEA Standards for law enforcement agencies, municipal lockup design and best practice design standards for police facilities. Our continued passion for law enforcement and its changing trends keeps our experience fresh and relevant. We recognize the critical importance of safety and security which is clearly reflected in all of our designs. FGM has Relevant Police Station Experience — Our experience is both current and relevant to your project. Not only have we have worked for many similar size Police Departments on similar size projects, we also have a lot of experience with adaptive reuse projects converting existing buildings into police stations, including three extremely similar projects involving former manufacturing/warehouse facilities. We know how to "stretch your dollar" and work cohesively with the Village, Police Department, and Construction Manager to design a police station that will serve the long term needs of your community. We believe that the combination of the strengths listed above makes FGM Architects uniquely qualified to become your partner for this project. We highly value our previous working relationship with the Village, Police Department and in the community, having worked on many projects over the years including: Fire Station 12 Renovation, New Fire Station 14, Emergency Operations Center, Public Works Addition, Community Connections Resource Center, Mount Prospect Historical Society Central School Restoration, and several projects for the Mount Prospect Public Library. 1211 V4# 71a tr i Wto 700 FGM ARCHITECTS We acknowledge the receipt of your emails dated between March 811 and March 22°1, 2018. A copy of each email has been included in the submittal package as per your request. We sincerely look forward to the possibility of working with the Village of Mount Prospect again on this exciting project. Thank you for the opportunity to reintroduce FGM with our current and, dare we say, exciting qualifications. As always, if you have any questions about our Proposal or to further discuss your Project or our qualifications please contact us. We look forward to hearing from you. TIO Raymond Lee, AIA, LEED AP Principal -in -Charge 630.574.8715 brianw@fgmarchitects.com R�l Brian Wright, AIA, LEED AP Director, Municipal & Recreation 630.574.8715 brianw@fgmarchitects.com Tab 1 Introduction FGM ARCHITECTS INTRODUCTION FGM Architects works with people and institutions that serve others and impact lives. At FGM, we call ourselves a "community-based" architecture firm. That is, our practice is dedicated to enhancing communities through environments that make up the landscape of our daily lives. Over our 70 -year history as a business—and through our work with countless municipalities—we have honed a set of values that have at their core commitment, integrity and people. These values guide everything we do. The design of police stations is an art in itself, whether stand alone or as a part of a public safety facility. When designing a police station, the importance lies in hiring an expert in public safety facilities versus your local general architect. FGM is a specialty firm that partners with communities to plan, design and construct public safety facilities. Each of our design solutions uniquely suits our client's needs and takes their operations to the next level of excellence. We've found that how we work with our clients is just as important as what we design. We believe in face-to-face communication, listening, and observing how users interact with their environment. Our team is committed to delivering world-class design that is aligned with your scope, schedule and budget Because we work with publicly -funded organizations, we understand that the people we serve extend well beyond those we report to on a daily basis. As such, one of the most important things we do is involving stakeholders in every step of a project. The end result is a design solution backed by solid consensus; everyone has participated in its creation and understands the logic of the planning process. We help lead this process and act as a trusted advisor, providing our clients the information and technical advice they need to make decisions quickly and confidently. At the end of the day, it's the client's mission that determines project priorities. To achieve this, we have to be a partner. We bring a balanced, common-sense design approach that considers all aspects of a building, not just the aesthetic. We bring our years of experience in successfully designing public safety buildings to your project, making sure that you look good and don't forget anything. We get you thinking about new and better ways to do your job. With the sophistication of public safety buildings, the guidance of a partner like FGM is imperative to lead you through the process and design a building that meets all of your needs. GROUPS WE SUPPORT Illinois Municipal League Illinois Association of Chiefs of Police International Association of Chiefs of Police American Public Works Association Illinois City Managers Association Village of Mount Prospect - Mount Prospect Police Department Introduction © 2018 FGM Architects Page 1 FGM t MUNICIPAL -MINDED We understand that working with local government involves balancing the interests of elected officials with the needs of municipal staff and the demands of a community that may question the need to spend tax dollars on a capital project. We begin with the end in mind starting with a carefully crafted project goal statement that captures your goals and defines how the project's success will be measured upon completion. This critical first step unifies everyone involved and facilitates important design decisions along the way. From there, we develop innovative practical solutions as we help our clients select the right choices for both the project and their community. As a firm, we structure our services to minimize the risks associated with building projects, including capital cost risk, operating cost risk and potential disruption of operations. No project is ever a one-off. We fully expect to be with our clients and designs for years to come. We are proud that we've worked with some communities for decades and know that the small projects can have just as profound an impact on our client's experience as multimillion -dollar ones FGM's qualifications are enhanced by our core purpose, mission and values. They are the cornerstones for how we manage our company, support the needs of our clients and support the professional development of our associates. Our history and our approach to projects is based on these values. CORE PURPOSE FGM exists to enhance communities by creating quality environments. MISSION We provide architecture, planning and interiors services to a diverse clientele by assembling an integrated professional team who develops strong relationships and works collaboratively with the client to meet the client's present and future needs. VALUES Commitment to Our Clients: We build long-term relationships by providing quality design and service that meets our clients' needs, values and interests. Commitment to the People of FGM: We offer opportunity for quality professional life and support for quality personal life to all. Ethical Conduct: We bring integrity, respect, fairness and honesty to all our relationships. Commitment to FGM: We apply sustainable business practices. These include responsible fiscal management, market diversity and development of future leaders. Page 2 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Introduction FGM ARCHITECTS PRINCIPAL OFFICERS OF THE FIRM John Ochoa, AIA CEO I John C. Dzarnowski, AIA President Timothy E. Kwiatkowski, AIA Executive Vice President and Southern Region Managing Director August F. Battaglia, FAIA Executive Vice President and Design Director James G. Woods, AIA, ALEP, LEED AP Executive Vice President and PK -1 2 Practice Leader Joseph P. Chronister, AIA, LEED AP Executive Vice President and Higher Ed Practice Leader r NUMBER OF STAFF IN ILLINOIS FGM provides services in four practice areas: municipal, PK -1 2 education, higher education and federal, with locations in Illinois and Missouri. The proposed Village of Mount Prospect Police project team works out of the Oak Brook office. Oak Brook Employees 47 Chicago Employees 5 O'Fallon Employees 1 1 :/ , ORGANIZATIONAL CHART Please find the organizational chart on page 19. Andrew J. Jasek, AIA ESTIMATED FEE INCOME Executive Vice President Please find our estimated fee and Northern Region Managing Director i�' income for professional services in 2018 on page 8. DATE COMPANY WAS FOUNDED 1945 PROJECT HISTORY \a, Please find our project histo the past 5 years on page 3', GENERAL NATURE OF WORK EXPERIENCE — FGM has been in continuous operation since 1945. 7 -4 FGM is a professional service firm with an emphasis ] LIST OF SIMILAR PROJECTS on service. Our projects respond to the goals of our - clients, the context of their sites, the environment that Please find our list similar by the fii sustains them and the communities they serve. projects performed b page 39. FGM provides services in four practice areas: municipal, PK -12 education, higher education and e 4. corporate. We practice architecture, interior design and landscape architecture. Our projects touch all aspects of community life— learning, work, protecting and playing. Village of Mount Prospect - Mount Prospect Police Department Introduction © 2018 FGM Architects Page 3 FGM ARCHITECTS FIRM EXPERTISE Developing a successful police station will benefit greatly from a firm with proven expertise. You are preparing to make a significant outlay of funds and in return you deserve to work with a specialist who walks you confidently through every step of the process. With you, we will develop a functional, practical plan to remodel your police station that is not only on budget and on schedule but is inviting, makes staff safety a priority, is functional, environmentally sustainable, low maintenance and uniquely suits your community's needs. FGM has worked hard to develop and deliver a reputation for just that. As a firm dedicated to serving communities, we want to highlight to the Village of Mount Prospect Police the specialized areas of practice offered by our municipal team. FGM's municipal practice is a dedicated group of individuals who focus on your type of project. The specialties most relevant to your project include: POLICE STATION DESIGN: FGM is a leader in police station design in Illinois. FGM offers in-house police station design expertise with over 25 years of experience specializing in police station design in a nationally recognized practice with over 130 local, state and national police projects SUSTAINABLE DESIGN: FGM believes in sustainable design and incorporates "green building" features into every project we design. We have over 24 United States Green Building Council LEED Accredited Professionals on staff. We designed the first LEED Gold police station in the United States with eight additional completed LEED Gold and two LEED Silver public safety projects. RESILIENT DESIGN: This specialized area of practice is multi -faceted and involves designing facilities for ability to prepare and plan for, absorb, recover from and more successfully adapt to adverse events. This includes designing for natural hazards, such as tornadoes and man made threats which includes active shooter situations. Other specialized areas of practice offered by our municipal team include: VILLAGE HALL DESIGN FIRE STATION AND FIRE TRAINING FACILITY DESIGN PUBLIC WORKS FACILITY DESIGN RECREATION FACILITY PLANNING AND DESIGN (includes Community Centers, Golf Course Clubhouses, Aquatic Centers and Parks) We are passionate about municipal design. For all our specialties, we work hard to stay current on trends which we believe helps us to advise our clients to make the best possible decisions for their projects. Page 4 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Introduction FGM ARCHITECTS POLICE EXPERTS TRUSTED LEADERS IN PUBLIC SAFETY DESIGN FGM is a specialty firm that partners with communities to plan, design and construct public safety facilities. Each of our design solutions uniquely suits each department's needs and takes their operations to the next level of excellence. Our project specialists work closely with your command staff and division supervisors to lead you through the design process. We bring our years of experience in successfully designing public safety buildings to your project, making sure that you look good, don't forget anything and get you thinking about new and better ways to do your job. Police officer safety is very important to us; we understand the distinct levels of security within a police station and its 24/7 operation. We have worked with both very small communities and those with over 290 -person sworn police departments. We have designed a multitude of police stations, emergency operation centers and 911 facilities. Our first project was the conversion of Maine North High School into a state-of-the-art facility for the Illinois State Police in 1990. Since then, we have been privileged to work with more than 65 police departments. Our experience includes • Over two decades of experience specializing in police station design nationally recognized practice with over 100 local, state and national police projects • Over 60 police consulting projects including existing conditions analyses, space needs studies, preliminary design, site selection and feasibility studies • First LEED Gold police station in the United States with seven additional completed LEED Gold public safety projects • Projects totaling over 970,000 sf and $225 million in construction POLICE STATION DESIGN DYNAMIC SOLUTIONS TO EVOLVING PUBLIC SAFETY TRENDS AND LOGISTICS When designing a police station, it is important to hire a police expert versus your local generalist architect. Public safety buildings are too sophisticated not to rely on the guidance of a partner like FGM who can lead you through the process. The design of a state-of-the-art police station is an ever evolving process. FGM's goal is to bring a greater depth of knowledge to our next project by learning something new from each department we work with and each successful station we complete. We not only learn through actual project experience but also by probing chiefs thoughts, studying development in law enforcement strategies and brainstorming new solutions. Some elements of good police station design are tried and true; like officer safety, making the public feel comfortable by utilizing CPTED (Crime Prevention Through Environmental Design) design guidelines, understanding the multiple levels of station security, creating a functional path through the building for a patrol officer from the start of his/her shift to the conclusion as well as navigating through Department of Corrections and CALEA standards. There are other items that are evolving, like the sophistication of evidence processing and handling—including safely and permanently storing the vast array of items connected with a case. The technology used in law enforcement has grown and finding effective ways to transport and store these tools in the vehicles and facility has become increasingly creative. Prisoner processing for high crime communities, juvenile offenders, suburban and rural areas each brings its own challenges and finding an operationally effective way to design the path from sally port to processing to lockup and bond out is critical. Page 5 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Introduction FGM ARCHITECTS SUSTAINABLE DESIGN FGM is committed to preserving the environment through sustainable design and energy conservation. We have invested in training to educate our team to value the importance of sustainability which is then incorporated into the planning, design and construction of each of our projects. Our team has 21 employees who are LEED Accredited Professionals and FGM is also a member of the U.S. Green Building Council. This accreditation recognizes expertise in green building and Leadership in Energy and Environmental Design (LEED). The focus on the environment and the incorporation of sustainable design and energy conservation principles is integral to our design process. We have invested in training to educate our team to value the importance of sustainability which is then incorporated into the planning, design and construction of each of our projects. The focus on the environment and the incorporation of sustainable design and energy conservation principles is integral to our design process. These practices contribute to the development of healthy, safe, energy-efficient facilities. Our project team has extensive experience with both the design and commissioning of LEED certified projects. FGM has completed 20 LEED certified projects including the recently Silver certified University of Chicago Lab Schools Gordon Parks Arts Hall project. The project team will prepare all the required design strategies, scorecards, documentation and submittals to the USGBC for certification. SUSTAINABLE PROCESS Village of Mount Prospect - Mount Prospect Police Department Introduction © 2018 FGM Architects Page 6 FGM ARCHITECTS 130+ 48+ Police Projects New and Renovated Police Stations qM 9 65+ Adaptive Reuse Police Clients Police Stations M1I POLICE CLIENTS ILLINOIS Mount Prospect Police Department Addison Police Department Arlington Heights Police Department Bellwood Police Department Bensenville Police Department Broadview Police Department Buffalo Grove Police Department Burr Ridge Police Department Carol Stream Police Department Cary Police Department Chicago Heights Police Department Des Plaines Police Department Edwardsville Police Department Effingham Police Department Elk Grove Village Police Department Fox Lake Police Department Fox River Grove Police Department Franklin Park Police Department Glen Carbon Police Department Glendale Heights Police Department Glenview Police Department Harwood Heights Police Department Highland Park Police Department Hoffman Estates Police Department Itasca Police Department Illinois State Police Kenosha Police Department Kildeer Police Department Lake in the Hills Police Department Lakemoor Police Department Lake Forest Police Department Lincoln Police Department Lincolnshire Police Department Manhattan Police Department Matteson Police Department McHenry Police Department Morton Grove Police Department Mundelein Police Department New Lenox Police Department Northbrook Police Department Northwestern University Police Oakbrook Terrace Police Department Oakwood Hills Police Department Orland Park Police Department Palatine Police Department Park Ridge Police Department Round Lake Police Department Rockford Police Department Roxana Police Department Schaumburg Police Department Skokie Police Department Streamwood Police Department St. Charles Police Department South Barrington Police Department Tower Lakes Police Department Wauconda Police Department Waukegan Police Department Wheaton Police Department Wilmette Police Department Winfield Police Department Winnetka Police Department Woodridge Police Department MISSOURI Cape Girardeau Police Department Farmington Police Department St. Francois County 911 MINNESOTA Duluth Police Department Village of Mount Prospect - Mount Prospect Police Department Introduction © 2018 FGM Architects Page 7 FGM ARCHITECTS ESTIMATED FEE INCOME FOR PROFESSIONAL SERVICES IN 2018 FGM Architects has been in continuous operation since 1945. The CEO of FGM has been with the firm for over 30 years and our board of directors has an average of 17 years' experience with the firm. Through strong management and careful stewardship of the business, FGM has been profitable each year for the past 30+ years. We have a strong and focused mission statement, culture and core values. FGM is in the top quartile of AE firms for financial strength as measured in the Annual Statement Studies published by The Risk Management Association (RMA). FGM holds professional liability insurance to cover financial exposure and proactively manages our project risk by carefully assessing owner relationships, educating staff, and utilizing a proactive project management system and an integrated quality control process. FGM's estimated fee income for professional services for 2018 is $17.4 million. Please contact our financial references for additional information about FGM's financial wherewithal to complete your project. Wintrust Commercial Banking Grant Ohlson, Assistant VP of Commercial Banking 6262 S. Route 83 Willowbrook, Illinois 60527 630.468.8674 gohlson@wintrust.com FGMK LLC Brian L. Cote, Partner 2801 Lakeside Drive, 3rd Floor Bannockburn, Illinois 60015 847.940.3259 bcote@fgmk.com M.G. Weibel & Associates, A Risk Strategies Company Michael Welbel, Vice President 650 Dundee Road Suite 170 Northbrook, Illinois 60062 847.513.6616 mwelbel@risk-strategies.com Page 8 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Introduction Tab 2 Project Understanding FGM ARCHITECTS PROJECT UNDERSTANDING A dedicated and passionate team of professionals will lead the Village of Mount Prospect Police to project success. It starts with listening. Tell us your expectations and we will make sure that they are understood. Our commitment to the Village of Mount Prospect Police is that we will be available to service your needs. Part of our process is to select a dedicated team for the Village of Mount Prospect Police that will be committed to your municipality and all projects. Village of Mount Prospect - Mount Prospect Police Department Project Understanding & Scope of Work © 2018 FGM Architects Page 9 FGM ARCHITECTS PROJECT UNDERSTANDING The Village of Mount Prospect would like an Architectural Design Firm, specializing in the design of police stations in Illinois, to provide complete design and construction services for a new police station in an adaptive reuse of a former warehouse/printing factory located at 799 Biermann Court in Mount Prospect. FGM has worked on many adaptive reuse projects for police stations and this building is an ideal candidate. The police station will be approximately 81,000 to 85,000 sf in size, including 55 indoor parking spaces. The adaptive reuse of 799 Biermann Court for conversion into a police station will include the following items: • The overall intent is to utilize as much of the existing building and sitework as possible. • The main building entry will be located off Kensington Road. This will require removal of a berm along the road and new vehicle entry drives. • The building is approximately 103,000 sf in size on a 5.5 acre site, which is greater than what is required in the program developed by FGM Architects in 2017. Part of the north and northwest sections of the building will be removed to provide space for access drives and parking. • A new facade will be provided where sections of the building have been removed. • The sitework may include provisions for additional parking for CVS which is located immediately adjacent to the west. • The sitework will include new sidewalks along Kensington Road. • A new drive-thru Sally Port addition will be provided. • A portion of the existing parking lot will be fenced to provide secure staff parking. After working with the Mount Prospect Police Department on Space Needs Analyses in 2006 and 2017, FGM has an in-depth understanding of the operations of the Mount Prospect Police Department and the obstacles their current station presents. We have a thorough understanding of the project's goals. The Village also has identified the following goals for the project: • The Village would like the project to be designed in a cost-effective manner while considering overall life cycle costs. • The functionality of the building design is critical. Design considerations need to address how to improve working conditions and increase communication and collaboration opportunities. • The Village would like to demonstrate its commitment to sustainable buildings. • The building design needs to be adaptable to changes in technology. The anticipated construction budget is approximately $22M which includes building and sitework construction costs and contingencies. The Village has selected Construction Management as the project delivery method and the selected architectural firm will be required to work closely and collaborate with the selected construction management company. FGM's Scope of Work and Project Approach for the project is outlined on the following pages. a Page 10 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Understanding & Scope of Work FGM ARCHITECTS SCOPE OF WORK AND PROJECT APPROACH From having completed the work on the Space Needs Analysis, we have a very good understanding of this project and the goals of the Village of Mount Prospect We understand that the Village is seeking a full service proposal for the Architectural and Engineering work to implement an adaptive reuse project to place the police station at 799 Biermann Court. This includes Architecture, Interior Design, Structural, Mechanical, Electrical (including low voltage and data systems), Plumbing and Fire Protection Engineering, Security Consulting (including CCTV and door access controls), Audio Visual Design, and Landscape Design Services. We understand FGM is to coordinate our work with Civil Engineering and Furniture design services which are being provided by the Village. Furthermore, we understand our services will be delivered in a single phase, without multiple bid packages. These services can be enumerated as follows: • Preliminary Design (Schematic Design) • Design Development • Construction Documents • Construction Administration (including Bidding and Project Closeout) In providing these services, FGM will be responsible for coordinating the services of consultants required throughout the project. A detailed description of each element of our services follows: PROJECT KICK-OFF MEETING This first phase of the design process is critical to the future success of both of the projects. It is here the decisions that are made will have the greatest impact on land use, functionality, adaptability and economy. Task 1: To begin this phase, we will meet with the stakeholder groups to gather and confirm existing information and confirm the vision (goals and objectives) for the project. When the study was performed, many elements of the vision were identified. It is only prudent to confirm the goals and objectives moving forward with implementation of the project to ensure we are all moving in the same direction. Our process leads to engagement of stakeholders throughout all stages of the design. Task 2: With the Construction Manager, we will develop initial overall project schedule for design and construction. Village of Mount Prospect - Mount Prospect Police Department Project Understanding & Scope of Work © 2018 FGM Architects Page 11 FGM ARCHITECTS SCHEMATIC DESIGN Upon completion of the Project Kick -Off Meeting with the Village of Mount Prospect, we shall proceed with Schematic Design. As we have already provided to the Village some preliminary concepts, we have a good start in the Schematic Design Phase and can begin immediately in the development of the overall design Task 1: Field verify existing building conditions. We understand that any existing drawings may be limited. FGM utilized laser scanning equipment to document existing conditions. This will provide us with an accurate base condition drawings. Task 2: Conduct tours of previously constructed police facilities in the Chicago area for Village staff, and elected officials to discuss relative merits of each facility and they may or may not apply to the design of Mount Prospect's new police station. Task 3: Site analyses will be performed to address zoning, site restrictions, easements, site circulation, existing buildings, landscape and site design, parking and site utilities. We will meet with agencies having jurisdiction over the project and all local utility companies to ensure coordination and compliance with all requirements. Task 4: Prepared Schematic Design for the new police station. The Schematic Design will include floor plans, site plans and building elevations. A series of meetings will be held with the Project Team and Construction Manager throughout the schematic design phase to build a consensus for the design of the police station. Task 5: At key intervals to be identified by the Project Team, FGM will present initial design to the Village Board to seek feedback and consensus. We have included presentations to the Village Board and/or Committee of the Whole, as well as two public open houses to present the initial design. Task 6: Upon confirmation of a preferred schematic design, final documentation preparation will include plans, supporting data — goals and objectives, site analyses and program. Task 7: Upon confirmation of the selected schematic design option, we will develop an outline description of the building and site improvements. The outline description will include: • Project description • Site plan indicating all major site improvements • Typical architectural building plans and elevations • Non -typical architectural building plans • Typical structural foundation and framing plans • Mechanical and electrical system descriptions and diagrams • Mechanical and electrical equipment locations • Complete area tabulations indicating gross and usable areas • Zoning and code requirement summaries • Architectural rendering(s) of the building exterior(s) Task 8: Assist the Construction Manager in preparation of Schematic Design Budget for the entire project. Task 9: In conjunction with the Construction Manager, review the project for Value Engineering Alternatives. Task 10: We will review alternative options for such major building systems as the exterior envelope and HVAC distribution system. These studies shall be suitable for obtaining preliminary construction cost pricing and life cycle and operation costs to determine the appropriate systems for the building. Task 11: Conduct a Sustainability review with the stakeholders to review the goals regarding energy efficiency and sustainability. Task 12: A preliminary building code review will be prepared. Task 13: Prepare documentation suitable for public meetings, government reviews and cost estimating. Attend meetings as required to present documentation. Task 14: Obtain Village of Mount Prospect approval to proceed into Design Development. Page 12 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Understanding & Scope of Work FGM ARCHITECTS DESIGN DEVELOPMENT The intent of this phase is to refine and further define all design elements of the project. Coordination of all the building systems is addressed and materials and finishes for the exterior and all public spaces are selected. Building standards for meeting rooms, offices, roll call, locker rooms, patrol, investigations, evidence, etc. are developed. Space finishes and materials, where required, are selected. Task 1: Based on the approved schematic design documents and any adjustments authorized by the Village of Mount Prospect to program or budget, we will prepare design development documents consisting of drawings and other documents to fix and describe the size, location and character of each element of the entire project pertaining to architectural, landscape, structural, mechanical and electrical systems and materials. Task 2: Conduct meetings with the Project Team during the design development phase with all current planning groups, consultants and Construction Manager to confirm that the design development documentation is in compliance with the established schematic design direction and to obtain additional information required for the greater level of detail provided by Design Development documentation. Task 3: Coordinate design work with Village's civil engineer. Task 4: Develop initial furniture layouts in conjunction with Village's furniture designer. FGM believes developing initial furniture and equipment layouts early provides for a better overall design as spaces can still be relatively easily manipulated to accommodate identified needs. Task 5: Determine low voltage, data, security, and audio/visual equipment requirements. Task 6: Determine initial interior finish materials and color palate for the project. Task 7: Prepare outline building specifications for the project. This will include information for all major building elements. Task 8: Assist the Construction Manager with the preparation of a cost estimate. Task 9: In conjunction with the Construction Manager, review the project for Value Engineering Alternatives. Task 10: Present the project to the Village Board and/or Committee of the Whole. Task 11: Obtain Village of Mount Prospect approval to proceed into Construction Documents. Village of Mount Prospect - Mount Prospect Police Department Project Understanding & Scope of Work C 2018 FGM Architects Page 13 FGM ARCHITECTS CONSTRUCTION DOCUMENT PHASE The Construction Documents serve to communicate to the Village of Mount Prospect and Construction Manager the work required to complete the project including: quantities of materials and equipment, relationships of materials and systems and quality. Task 1: Upon approval of the design development document phase, and based on the selected alternative system studies, we shall prepare complete construction documents. The construction documents shall consist of complete contract drawings and specifications. FGM will assist the Construction Manager and Village in preparation of the general conditions, instructions to bidders and other necessary documents. Task 2: FGM will provide progress review documents at 50%, 80% and 100% completion for Village and Construction Manager reviews and approvals. During the Construction Document Phase, FGM utilizes a file management system allowing team members access to the latest documents which are updated on a periodic basis. Task 3: Conduct meetings with the Project Team and all planning groups, consultants and Construction Manager as required to obtain necessary information and approvals to complete the Construction Documents. Task 4: Coordinate our work with the Village's civil engineering and furniture design consultant. Task 5: Quality Control Review: FGM has a quality control program that provides both continuous quality monitoring during project design with a strictly enforced system of periodic review. All of our projects are reviewed extensively prior to being released for Bidding. Task 6: FGM will assist the Village of Mount Prospect and the Construction Manager in filing the required documents for building permit approval of authorities having jurisdiction over the project. Task 7: With the Construction Manager, present the final plans and budgets to the Village Board and/or Committee of the Whole. Task 8: Obtain Village of Mount Prospect approval to proceed into the Construction Phase and bid the project. Page 14 C 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Understanding & Scope of Work FGM CONSTRUCTION PHASE The Construction Administration phase will be given our full attention to assure that the projects are completed expeditiously and, in the manner intended. Task 1: Assist the Village and Construction Manager in bidding the project. FGM will attend a pre-bid meeting, respond to requests for information from bidding, and prepare and issue addenda as requ ired. Task 2: Upon receipt of bids, assist the Construction Manager to determination lowest qualified bidders. Review of a bidder's qualification usually proceeds on two levels. From an objective standpoint, information can be gathered reflecting the contractor's or subcontractor's previous experience, financial stability, equipment ownership, organization, etc. by requiring submission of a qualification statement (such as AIA Document A305). Equally important, however, is an assessment of the contractor's or subcontractor's workmanship, efficiency, responsiveness and other more subjective attributes, which cannot be determined by reviewing the standard qualification statement. Here FGM relies on many years of experience in the local construction industry and its special knowledge of municipal building projects. Task 3: Acting as the Village's advocate, we will provide administration of the construction contract including advising and consulting with the Village of Mount Prospect and the Construction Manager; meeting with governing agencies; forwarding all Village instructions to the Construction Manager; review of shop drawings, samples and other submissions of the trade contractors; interpreting the documents for the trade contractors; issuing certifications of payment and certificates of substantial completion and review and issuing change orders. Task 4: FGM shall assist the Construction Manager when requested to answer requests for information (RFI's). Task 5: We will provide an average of one site visit per week for on-site observation and for construction meetings Owner and Construction Manager. Task 6: When the project is substantially complete, we shall prepare and coordinate punch lists of items requiring remedial work or replacement, collect and deliver to the Village of Mount Prospect written warranties and other related documents. Task 7: FGM will assist the Construction Manager as requested to ensure proper system start up procedures are followed and building commissioning has been completed. Task 8: Provide punch list follow up reviews and assist Construction Manager as required to obtain final Certificate of Occupancy. Task 9: Ten months after substantial completion of the project, with Construction Manager, observe building architectural and MEP/FP systems. Prepare a defects list. Assist Construction Manager in the coordination, review and approval of all corrective action under the warranties. Village of Mount Prospect - Mount Prospect Police Department Project Understanding & Scope of Work © 2018 FGM Architects Page 15 FGM ARCHITECTS PROVISION OF SERVICES Services to be provided by FGM in-house include: • Architecture • Interior Design • Landscape Architecture • Services to be provided by FGM's consultants include: • Structural Engineering • Mechanical Engineering • Electrical Engineering (including low voltage and data system design) • Plumbing Engineering • Fire Protection Engineering • Security Consulting (CCN and Door Access Controls) • Audio/Visual Consulting ° Building Commissioning Services to be provided by the Village or Construction Manager includes: • Civil Engineering • Construction Phase Testing • Environmental Consultant (if required) • Furniture Design and Procurement Page 16 C 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Understanding & Scope of Work Tab 3 Proposed Schedule FGM ARCHITECTS PROPOSED PROJECT SCHEDULE Our proposed project schedule for the New Police Headquarters for the Village of Mount Prospect Police Department is outlined below. This schedule, in our experience, will allow time for Village Staff and Board level reviews and public input as outlined in the Request for Proposals dated March 7, 2018. The schedule will be confirmed as part of the Kick -Off Meeting. Because FGM completed the space needs study for the project, we have a very good understanding of the project and can begin design work immediately upon project award. If the Village would like to expedite the schedule, it is possible, but we would like to discuss the assumptions allowed for Owner reviews and approval meetings. ANTICIPATED PROJECT AWARD DATE May 1, 2018 Projected Project Start Date Pre -Meeting Preparation and SCHEDULE PROJECT KICK OFF MEETING May 2, 2018 PROJECT KICK OFF MEETING Week of May 2, 2018 Confirm project goals, project schedule and meeting dates SCHEMATIC DESIGN May 2 — July 10, 2018 Develop Schematic Design of Headquarters Police Station • Village Board Meeting: June 5, 2018 Present initial plans and to Village Board for comment and input • Schematic Design Cost Estimate: June 18 —22, 2018 With Construction Manager, develop Schematic Design Budget • Village Board Meeting: June 26, 2018 Present final schematic design to Village Board. Request permission to begin Design Development Village of Mount Prospect - Mount Prospect Police Department Proposed Schedule © 2018 FGM Architects Page 17 FGM DESIGN DEVELOPMENT June 26 — September 18, 2018 Develop approved Schematic Design to further refine and develop all aspects of the project • Cost Estimate: September 3 —14, 2018 Assist Construction Manager to develop Design Development Budget • Village Board Meeting: September 18, 2018 Present final schematic design to Village Board. Request permission to begin Design Development CONSTRUCTION DOCUMENTS September 19, 2018 — January 8, 2019 Preparation of plans, specifications and permitting work. • 50% CD Cost Estimate: October 29 — November 16, 2018 Assist Construction Manager to develop 50% Construction Document Budget • Submit for Building Permit: December 14, 2018 Submit plans for building permit review. • Village Board Meeting: January 8, 2019 Present final plans and cost estimates to Village Board and request permission to bid the project. CONSTRUCTION ADMINISTRATION January 9, 2019 — May 31, 2020 Includes Bidding and Contract Negotiations, Construction Administration, and Project Closeout Services • Bidding and Contract Negotiation: January 9 — March 8, 2019 Soliciting sub -contractor bids, bid review, bid award, and contract negotiations • Construction Begins: March 11, 2019 Anticipated construction period is 12 months • Substantial Completion: March 6, 2020 Project is substantially complete, occupancy permit is received and Punch List for corrective work required is developed • Furniture Fixtures and Equipment Installation: March 9 — April 20, 2020 Installation of furniture and equipment setup POLICE OPERATIONS BEGIN April 20, 2020 Police Operations begin in new Headquarters FINAL COMPLETION June 12, 2020 Completion of Punch List Page 18 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Proposed Schedule Tab 4 Project Team and Organization Chart FGM ARCHITECTS PROJECT TEAM AND ORGANIZATIONAL CHART N [aunt PI-OSIcct 0 Village of Mount Prospect Mount Prospect Police Department PRINCIPAL -IN -CHARGE Mr. Raymond K. Lee, AIA, CSI, LEED AP PROJECT MANAGER Mr. Jason Estes, AIA PROJECT DESIGNER Ms. Louise Kowalczyk, AIA, LEED AP PROJECT ARCHITECT Ms. Beth Cerny, AIA LANDSCAPE ARCHITECT Mr. Steve Welter, PLA, LEED AP BD+C CONSULTANTS Consolidated Consulting Engineers ( CCE MEP Engineering McCluskey Engineering Corporation Structural Engineering Correct Electronics, Inc. Security Consulting Prasino Engineering, I.I.C. Commissioning Consultant Effective communications are at the heart of any successful team effort or good client relationship. Our team prides itself on our ability to carefully plan and implement your project. Village of Mount Prospect - Mount Prospect Police Department Project Team and Organizational Chart © 2018 FGM Architects Page 19 Tab 5 Project Team Resumes FGM ARC F PROJECT TEAM RESUMES FGM will provide the Village of Mount Prospect and Mount Prospect Police Department with a qualified team of experts who will strive to deliver your project on time and on budget. We offer you individuals with a proven record of experience who are committed to ensuring that your study will be of a highly distinctive quality. FGM has developed a principal -led team dedicated to the Village of Mount Prospect and the Mount Prospect Police Department. We anticipate that this team will work together for all phases of the project. The following pages include resumes of the FGM team. Our municipal experts work with communities throughout Illinois, Missouri and Wisconsin. Our team brings value to our clients' projects, as well as experience, talent and a superior level of communication. With a wide range of previous project involvement, these individuals offer expertise in areas varying in detail with regard to municipal facilities. 0 QPM"roti �-`' F it __ t Village of Mount Prospect - Mount Prospect Police Department Projed Team Resumes © 2018 FGM Architects Page 21 FGM ARCHITECTS Ray has worked with local municipal governments and those who lead them for more than 30 years. CONTACT RAY 630.574.8711 phone rayl@fgmarchitects.com THOUGHT LEADERSHIP American Institute of Architects ASIS International (Security) Cal EMA Safety Assessment Program Disaster Service Worker Volunteer Construction Specification Institute DuPage County Chiefs of Police Association Illinois Association of Park Districts Illinois Association of Police Chiefs Illinois Park and Recreation Association y International Association of Chiefs of Police Lake County Chiefs of Police Association National Recreation & Parks Association North Suburban Association of Chiefs of Police U.S. Green Building Council PROJECT ROLE Ray will serve the Village of Mount Prospect Police Department as the Principal -in -Charge. EDUCATION BS in Architectural Studies, University of Illinois at Chicago, 1985 CERTIFICATIONS Licensed Architect Illinois, Missouri & Wisconsin, 1990, 2013 & 2017 Crime Prevention Through Environment Design (CPTED) Certified Practitioner LEED AP NCARB Certification RAYMOND K. LEE, AIA, CSI, LEED AP PRINCIPAL / PRINCIPAL -IN -CHARGE Ray specializes in the programming, planning, design and construction of public safety and municipal facilities. He is recognized for his deep understanding of police, fire, and 911 operations which greatly benefits the organizations he works with. Ray also has an outstanding knowledge of resilient design focusing on best practices for safety and security from man-made threats and natural disasters. SELECT EXPERIENCE VILLAGE OF MOUNT PROSPECT Mount Prospect, Illinois Police, EOC, Fire & Public Works TAOUTIES STUDY Police & Fire Department sPACENEEDssruDl, VILLAGE OF ADDISON Addison, Illinois Police Communication Center RENouATIoN 911 Communication Center NEw VILLAGE OF ARLINGTON HEIGHTS Arlington Heights, Illinois Police Station EXTERIOR RENOVATION Police Station TEASIBIUTI'5TUDI'(2015) VILLAGE OF BENSENVILLE Bensenville, Illinois Police Station EEASIBIury&sPACENEEDssrUDY Police Station NEw VILLAGE OF BROADVIEW Broadview, Illinois Police Station SPACENEEDSSTUDV Village Hall and Police Station and 911 ADDITION & RTNOV,4TION VILLAGE OF BUFFALO GROVE Buffalo Grove, Illinois Police Station Interview Room RENoVATIoN CITY OF CAPE GIRARDEAU Cape Girardeau, Missouri Police Station SPACENEEDSSTUDY VILLAGE OF CAROL STREAM Carol Stream, Illinois Police Evidence Storage sPACENEEDssTUDV CITY OF CHICAGO HEIGHTS Chicago Heights, Illinois 911 Center MASTERPLAN 911 Center INTERNACRECOC9TION&RENOVATION CITY OF DES PLAINES Des Plaines, Illinois Police Station sPACENEED5ANAcrs15 CITY OF DULUTH Duluth, Minnesota Police Station NEw CITY OF EDWARDSVILLE Edwardsville, Illinois Public Safety Facility (PD/FD) SPACE NEEDS STUD' CITY OF ELMHURST Elmhurst, Illinois Police Station SPACENEEDSSTUDV CITY OF FARMINGTON Farmington, Missouri Police Station TTASIBIUTvsrUDv Library, City Hall, Police Station, Civic Center, Senior Center, & Aquatic Center TEASIBIUTvsrUDv VILLAGE OF FRANKLIN PARK Franklin Park, Illinois Police Station SPACENEEDSSTUDV Police Station NEw VILLAGE OF GLENDALE HEIGHTS Glendale Heights, Illinois Police Station NEw Civic Center RENoVATIoN Page 22 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS RAYMOND K. LEE, AIA, CSI, LEED AP VILLAGE OF GLENVIEW VILLAGE OF MORTON GROVE CITY OF ST. CHARLES Glenview, Illinois Morton Grove, Illinois St. Charles, Illinois Police Station SPACENEEDSSrUDv Police Station FEASBEIDVANALYS/S Police Station SPACENEEDSSrUDv&S/DESDUD/ES Police Station NEw CITY OF HIGHLAND PARK VILLAGE OF NEW LENOX Highland Park, Illinois New Lenox, Illinois VILLAGE OF SOUTH BARRINGTON Police Station 5PACENEED55IIDI, Police Station NEw South Barrington, Illinois Police Station NEw Police Station DESIGNASSISDANCE NORTHWESTERN UNIVERSITY VILLAGE OF HOFFMAN ESTATES Evanston, lhinois VILLAGE OF STREAMWOOD Hoffman Estates, Illinois Police Station ADADmEREu5E1mA/oRRENouAnoN Streamwood, Illinois Police Station S/DE&CosrsrUDv Police Station SPACENEEDSSrUDv VILLAGE OF ORLAND PARK Police Station NEw ILLINOIS STATE POLICE Orland Park, Illinois Des Plaines, Illinois Police Station ADAPTIVEREUSE/MAJORRENOVATION CITY OF WAUKEGAN District Chicago HQ Waukegan, Illinois ADAPT1VF RHISE/MAJOR RENO VA TION VILLAGE OF PALATINE Palatine, Illinois Police Department SPACENEEDS&DESIONSDUDY VILLAGE OF ITASCA Police, Fire, Village Hall & Public Works CITY OF WHEATON Itasca, Illinois FA OL/TIEssrUDl' Wheaton, Illinois Police Station D:ACENEED55IIDv Police Department Firing Range CITY OF PARK RIDGE KENOSHA JOINT SERVICES Park Ridge, Illinois RENOVATION Kenosha, Wisconsin Police Station D:ACENEED55IIDI, VILLAGE OF WILMETTE Shooting Range NEw City Hall & Police MASDERPLAN Wilmette, Illinois 911 Regional Dispatch Expansion LAKE FOREST FD CITY OF RACINE Study FEASIBIurvsruDv Lake Forest, Illinois Racine, Wisconsin PSB FD Locker Room RENoVATIoNSTIIDI, Public Safety Building (PD/FD) VILLAGE OF WOODRIDGE SPACENEEDSSTUDV Woodridge, Illinois CITY McH Police Station with 911 Communication r Illinooisis McHenry, CITY OF ROCKFORD Center EXPAN510NIRENOVATIONDE51GN Municipal Campus Space Needs Study Rockford, Illinois Police 911 Communication Center & Police Department sPACENEEDsANAIvs/s VILLAGE OF BROADVIEW Administration RENOVATION District Police Station No. 1 NEw Broadview, Illinois Police Department Conceptual District Police Station No. 2 Village Hall & Police Station Planning STUDV ADAPTIVE REUSE/MAJOR H1STORICAc RENOVATION SPACE NEEDS STUD v Civic Center Reception Area RENoVATIoN District Police Station No. 3 Village Hall & Police Station VILLAGE OF MANHATTAN ADAPTIVE REUSE/MAJOR RENOVATION ADDITION & REMODEUNG Manhattan, Illinois VILLAGE OF ROXANA VILLAGE OF CLARENDON HILLS Police Department/Village Hall Roxana, Illinois Clarendon Hills, Illinois ADAPTIVEREUSF Village Hall, Police & Fire Village Wide (VH/PW/FD/-Frain Station) VILLAGE OF MATTESON FACIUDI'ASSESSMEND&MASTER PbIN FACIUTIEs sruDv Matteson, Illinois VILLAGE OF SCHAUMBURG CITY OF COUNTRYSIDE Village Hall Board Room & Police Schaumburg, Illinois Countryside, Illinois Station RENoVATIoN Police 911 Communications Center NEw City Hall & Police Station VILLAGE OF MUNDELEIN Police Station Cell RENOVATION SPA OF NEEDS STUD v(20 76) Mundelein, Illinois Police Station HVAC Analysis sDUDI, ELK GROVE VILLAGE Police Station 5PACENEED55rUDl' Elk Grove Village, Illinois Police Station NEw VILLAGE OF SKOKIE Administration & Public Safety Complex Skokie, Illinois Reception Desk SECURIDI'RENOVATION Police Station ADAPTIVEREu5E1mAJoRRENoVATIoN (VH/PD/FD) NEw&RENoVATIoN Public Safety Building (PD/FD) Council Chambers RENoVATION SPACE NEEDS SDUDV Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 23 FGM ARCHITECTS PROJECT ROLE Jason will serve the Village of Mount Prospect Police Department as the Project Manager. EDUCATION BS in Architecture, Illinois Institute of Technology, 1997 JASON ESTES, AIA PRINCIPAL / PROJECT MANAGER CERTIFICATIONS Licensed Architect Illinois, 2006 NCARB Certification Jason has a vast amount of experience working on public safety projects including police, fire and 911. He is skilled in the design of new facilities as well as the addition and remodeling of existing facilities. Jason's in-depth technical knowledge of municipal facilities, together with his leadership abilities, has resulted in successful projects with admiration from clients and accolades and award recognition. Jason has worked with local SELECT EXPERIENCE municipal governments and those who lead them for more than 20 years. VILLAGE OF MOUNT PROSPECT VILLAGE OF EAST DUNDEE Mount Prospect, Illinois East Dundee, Illinois CONTACT JASON Police & Fire Department 5PACENEED55ruDl, Police & Village Hall 5PACENEED5ANAL1315 630.574.8714phone 630.574.8714VILLAGE East Dundee Summit School VH/Police jasone@fgmarchitects.com OF ADDISON Addison, Illino?- CITY OF RACINE Police Department Consolidated Racine, Wisconsin Dispatch Center Public Safety Building (PD/FD) THOUGHT LEADERSHIP DuPAGE PUBLIC SAFETY SPACE NEEDS STUDY American Institute of Architects COMMUNICATIONS (DU -COMM) VILLAGE OF GLENDALE HEIGHTS Illinois Association of Fire I Glendoie sleights, iliinois Glendale Heights, Illinois Protection Districts Back -Up Dispatch Facility 5PACENEED55ruDl, Police Station & 911 Dispatch Center Illinois Fire Chiefs Association Renovation Work M15CEC NEOUs 5MA11 PRo✓ECT5 NEW Kane County Fire Chiefs CITY OF ELMHURST ADDISON FPD National Council of Architectural Elmhurst, Illinois Addison, Illinois Registration Boards Police Station 5PACENEED55ruDl, HQ Station No. 1 RENovATIoN VILLAGE OF GLENDALE HEIGHTS Station No. 2 ADDIDoN&RENovAT7oN Glendale Heights, Illinois ARLINGTON HEIGHTS FD Police Station NEW Arlington Heights, Illinois Civic Center RENovATIoN Station No. 4 ADDIT7oN&RENovAT7oN KENCOM PUBLIC SAFETY DISPATCH Station No. 3 ADDIT7oN&RENovAT7oN Yorkville, Illinois BARTLETT FPD Kencom RENovATIoN Bartlett, Illinois 911 Dispatch Center RENovATIoN District -wide EACVD'5PACENEED5ANAc615 VILLAGE OF CLARENDON HILLS Station No. 2 RENovATIoN Clarendon Hills, Illinois Station No. 2 sruDY Village Wide (VH/PW/FD/Train Station) BRAIDWOOD FD EACUTIEs srUDY Braidwood, Illinois CITY OF PARK RIDGE HQ Station ADDmoN& RENovATIoN *Project completed while Jason was Park Ridge, Illinois City Hall & Police MASTERPLAN CARBONDALE FD affiliated with another firm Carbondale, Illinois Station No. 2 NEW Page 24 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS JASON ESTES, AIA BRISTOL KENDALL FPD FOREST VIEW FD OSWEGO FPD Yorkville, Illinois Forest View, Illinois Oswego, Illinois Station No. 2 NEw HQ Station 5PACENEED55TIIDI, Central Station NEw Station No. 3 NEw HQ Station NEw St Station No. 2 sruDv Station No. 1 Administrative Station No. 2 NEw PLAINFIELD FPD East Dundee, Illinois FRANKFORT FPD Plainfield, Illinois sPACENEEDssruDl' Frankfort, Illinois Administration Campus MAsrERPLAN Station No. 1 Bunk Room RENoVAr7oN Station No. 4 NEw HQ Campus NEw Station No. 1 Dayroom/Kitchen Station No. 5 NEw Administration & Training Facility NEw RENOVATION Station No. 1 ADM/N/srR TIoNsrUDV Station No. 2 NEw Station No. 1 Pavement Replacement GLENVIEW FD Maintenance Facility NEw RENOVATION GENESEO FPD Station No. 3 NEw Station No. 1 Flooring Replacement Geneseo, Illinois WEST CHICAGO FPD RENOVATION HQ Station ADDITION&RENoVATIoN Station No. 4 NEw Station No. 1 NEw DIXON RURAL FPD GENEVA FD Dixon, Illinois Geneva, Illinois FPD Station No. 1 sTIlDl, HQ Station sPAcENEEDssruDv La Grange Grange Yiighlands, Illinois HQ Station NEw St Station No. 2 sruDv EAST DUNDEE FPD Station No. 2 NEw Station No. 2 ADDmoN&RENoVATIoN East Dundee, Illinois Station No. 3 RENoVATIoN HQ Station sPAcENECDssruDr GENOA -KINGSTON FPD District -wide sPAcENEEDsANAcrsis HQ Station NEw Genoa, Illinois HQ Station EEAsieiurvsruDv SYCAMORE FD ELBURN & COUNTRYSIDE FPD Sycamore, Illinois Elburn, Illinois GLENVIEW FD Station No. 2 NEw HQ Station NEw Glenview, Illinois Station No. 1 sPAcENEEDssruDv Station No. 13 East Lake NEw WEST CHICAGO FPD Station No. 2 NEw Station No. 14 The Glen West Chicago, Illinois Station No. 2 NEw Station No. 3 sTIlDl, ILLINOIS FIRE SAFETY ALLIANCE (IFSA) Station No. 3 NEw ELGIN FD Mt. Prospect, Illinois Station No. 1 RENoVATIoN Elgin, Illinois IFSA EACILID'srUDv Department Wide EAODD'SPACENEEDssruDY VILLAGE OF WEST DUNDEE Station No. 6 NEw KNOLLWOOD FPD West Dundee, Illinois Lake Bluff, Illinois Public Safety Building No. 2 NEw Station No. 7 NEw HQ Station sPAcENEEDsANAcrsis Station No. 8 EEASBIDD'sruDl' WINFIELD FPD Station No. 8 PLANNING&PRoGR mmlNG LA VISTA FD Winfield, Illinois La Vista, Nebraska District -wide EACIDD'57TDl' ELK GROVE VILLAGE FD Department sPAcENEEDssruDv Station No. 2 srUDl, Elk Grove Village, Illinois Station No. 2 NEw District -wide sLrESTIIDI, Station No. 10 NEw Station No. 8.5 NEw LIMESTONE FPD VILLAGE OF CLARENDON HILLS Peoria, Illinois Clarendon Hills, Illinois ELMHURST FD District Wide 5PACENEED55TIIDI, Village Wide (VH/PW/FD/Train Station) Elmhurst, Illinois Central Station NEw EACLUr7E5 57TDl' Station No. 2 5PAcENEED55ruDv Station No. 2 ADD1TIoN/RENoVAnoN Station No. 2 NEw Station No. 4 ADD1T1oN1RENoVAnoN STREAMWOOD PUBLIC WORKS HARLEM-ROSCOE FPD Station No. 5 RENoVATION Streamwood, Illinois Roof REPLACEMENTRoscoe, Illinois Station No. 1 sPAcENEEDsANAcrsis LOCKPORT TOWNSHIP FPD Lockport, Illinois Station No. 1 ADDITION& RENO VA TION HQ Station No. 6 NEw Station No. 2 ADDITION& RENO VA TION Station No. 4 NEw Station No. 3 ADDITION& RENO VA TION Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 25 FGM ARCHITECTS PROJECT ROLE EDUCATION CERTIFICATIONS Louise will serve the Village BS in Architecture, Licensed Architect of Mount Prospect Police University of Illinois at Illinois, 1989 Department as the Project Chicago, 1985 LEED AP Designer. Louise has worked with local municipal governments and those who lead them for more than 22 years. CONTACT LOUISE 630.574.8713 phone lou isek@fgmarch itects.corn THOUGHT LEADERSHIP Association of Licensed Arch itects American Institute of Architects Illinois Park and Recreation Association Northern Suburban Association of Chiefs of Police Women in Leisure Services U.S. Green Building Council r LOUISE G. KOWALCZYK, AIA, LEED AP PRINCIPAL / PROJECT DESIGNER Louise has experience in the design and construction of police stations, fire service and municipal projects. She has outstanding planning and design talents, particularly in developing unique, attractive exterior building elevations and interior color and material schemes. Functionality and facility longevity are always top priorities in her designs. SELECT EXPERIENCE VILLAGE OF MOUNT PROSPECT Mount Prospect, Illinois Fire Department EAcluTIESSTUDr Police, EOC, Fire & Public Works EAOUTIES STUD r Police & Fire Department sPAcENEEDssrUDv VILLAGE OF ADDISON Addison, Illinois 911 Communication Center NEW Addison Consolidated Dispatch Center NEW VILLAGE OF ARLINGTON HEIGHTS Arlington Heights, Illinois Police Station EEA5IBIUTr57UDr(2015) VILLAGE OF BENSENVILLE Bensenville, Illinois Police Station EEASB/UTr&sPACENEEDssrUDv Police Station NEW VILLAGE OF BROADVIEW Broadview, Illinois Police Station sPACENEEDssrUDv Village Hall and Police Station and 911 ADDITION & RENOVATION CITY OF CAPE GIRARDEAU Cape Girardeau, Missouri Police Station sPACENEEDssrUDv CITY OF CHICAGO HEIGHTS Chicago Heights, Illinois 911 Center MASTER PIAN 911 Center INTERNACREcoCATIoN&RENoVATIoN NORTHWESTERN UNIVERSITY Evanston, Illinois; Police Station & 911 Dispatch Center ADAPTIVE REUSE/MAJOR RENOVATION VILLAGE OF HARWOOD HEIGHTS Harwood Heights, Illinois Police Station & 911 Dispatch Center ADAPTIVE REUSE Police Station &Village Hall ADAPTIVEREusE CITY OF DES PLAINES Des Plaines, Illinois Police Station SPACE NEEDS ANAL YS/S 911 Communications Center EXPANSION&RENOVATION CITY OF DULUTH Duluth, Minnesota Police Station NEW CITY OF ELMHURST Elmhurst, Illinois Police Station sPACENEEDssrUDv VILLAGE OF FRANKLIN PARK Franklin Park, Illinois Police Station NEW VILLAGE OF GLENDALE HEIGHTS Glendale Heights, Illinois Police Station NEW VILLAGE OF ORLAND PARK Orland Park, Illinois Police Station ADAPTIVE REu5E/MAJoR RENoVATIoN Police Back Up Dispatch & Emergency Operations Center STUDr Page 26 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS LOUISE KOWALCZYK, AIA, LEED AP VILLAGE OF GLENVIEW Glenview, Illinois Police Station SPACENEEDSSTUDV Police Station NEW Police Station Range Upgrades RENOVATION CITY OF LINCOLN Lincoln, Illinois Police Department ADAPTIvEREuSE CITY OF HIGHLAND PARK Highland Park, Illinois Police Station & 911 Dispatch Center N, VILLAGE OF MORTON GROVE Morton Grove, Illinois Police Station FEASIBILITI'ANALYS/S VILLAGE OF NEW LENOX New Lenox, Illinois Police Station NEW VILLAGE OF PALATINE Palatine, Illinois Police Station NEW CITY OF ROCKFORD Rockford, Illinois District Police Station No. 1 NEW District Police Station No. 2 ADAPTIVE REUSE/MAJOR HISTORICAL RENOVATION District Police Station No. 3 ADAPTIVE REUSE/MAJOR RENOVATION VILLAGE OF SKOKIE Skokie, Illinois Police Station & 911 Dispatch Center ADAPTIVE REUSE/MAJOR RENOVATION CITY OF ST. CHARLES St. Charles, Illinois Police Station SPACENEEDSSTUDv&S/TESTUD/ES VILLAGE OF CLARENDON HILLS CITY OF McHENRY Clarendon Hills, Illinois McHenry, Illinois Village Wide (VH/PW/FD/Train Station) Municipal Campus SPACENEEDSSTUDI, FACILITIES STUDY CITY OF COUNTRYSIDE Countryside, Illinois City Hall & Police Station SPACE NEEDS STUDY X20? CITY OF EDWARDSVILLE Edwardsville, Illinois Public Safety Facility (PD/FD) SPACE NEEDS STUDY Public Safety Facility (PD/FD) NEW ELK GROVE VILLAGE Elk Grove Village, Illinois Administration & Public Safety Complex (VH/PD/FD) NEW&RENOVATION VILLAGE OF GLENDALE HEIGHTS Glendale Heights, Illinois Police Station & 911 Dispatch Center NEW Civic Center RENOVATION CITY OF HIGHWOOD Highwood, Illinois City Hall, Police Department & Library RENOVATION STUDY VILLAGE OF LAKEMOOR Lakemoor, Illinois Village Hall/Police Station SPACENEEDS STUDY Village Hall/Police Station NEW TOWN OF LEDGEVIEW Ledgeview, Wisconsin Town Hall & Fire Station No. 1 FEASIBILITvsrUDr Town Hall & Fire Station No. 1 NEW VILLAGE OF STREAMWOOD VILLAGE OF MANHATTAN Streamwood, Illinois Manhattan, Illinois Police Station NEW Village Hall/Police Department/Fire Department SPACENEEDSSTUDv CITY OF WAUKEGAN Police Department/Village Hall Waukegan, Illinois ADAPTIVEREUSE Police Department SPACENEEDS&DES/GNSTUDV VILLAGE OF MATTESON VILLAGE OF MAYWOOD Matteson, Illinois Maywood, Illinois Village Hall Board Room & Police Train Station Warming Shelter RENOVATION Station RENoVATION CITY OF OAKBROOK TERRACE Oakbrook Terrace, Illinois City Facilities coNCEPT5 CITY OF PARK RIDGE Park Ridge, Illinois City Hall & Police MASTERPLAN CITY OF RACINE Racine, Wisconsin Public Safety Building (PD/FD) SPACE NEEDS STUDY VILLAGE OF ROXANA Roxana, Illinois Village Hall, Police & Fire FACIUTVASSESSMENT & MASTER PLAN Administration Building, Fire & Police Center NEW CITY OF DES PLAINES/NORTH SUBURBAN EMERGENCY COMMUNICATIONS CENTER Des Plaines, Illinois 911 Communications Center EXPANSION & RENOVATION HARLEM-ROSCOE FPD Roscoe, Illinois Station No. 1 & 911 Dispatch Center ADDITION & RENOVATION VILLAGE OF NORTHBROOK Northbrook, Illinois Police Station & 911 Dispatch Center EXPANSION/RENOVATION Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 27 FGM ARCHITECTS Beth has worked with local municipal governments and those who lead them for more than 13 years. PROJECT ROLE Beth will serve the Village of Mount Prospect Police Department as the Project Arch itect. EDUCATION Master of Architecture, University of Minnesota, 2005 BS in Architecture, University of Minnesota, 2002 ELIZABETH CERNY, AIA ASSOCIATE / PROJECT ARCHITECT CERTIFICATIONS Licensed Architect Illinois, 2012 NCARB Certification Beth offers talent, passion and dedication to each project she touches. She is an adept problem solver and a skilled collaborator in the design process, working closely with the project team to help ensure that each client's project goals are incorporated into the design. She has more than 13 years experience specializing in the design of public safety and municipal facilities. As a key member of your project team, Beth will see your project through from conception until final completion. SELECT EXPERIENCE CONTACT BETH VILLAGE OF MOUNT PROSPECT VILLAGE OF DOWNERS GROVE* 630.574.8725 phone Mount Prospect, Illinois Downers Grove, Illinois bethc@fgmarchitects.com Police & Fire Department 5PACENEED55ruDl, Village Hall, Police, Fire & Public Works FACIUTl'NEED5 AssEssMEN7° VILLAGE OF ADDISON Addison, Illinois VILLAGE OF GLEN ELLYN* THOUGHT LEADERSHIP Police Department Consolidated Glen Ellyn, Illinois American Institute of Architects Dispatch Center NEw Village Hall & Police National Council of Architectural FACIUD'NEED5A55E55MEN7` Registration Boards VILLAGE OF BROADVIEW Broadview, Illinois VILLAGE OF HANOVER PARK* Police Station 5PACENEED55ruDl, Hanover Park, Illinois Village Hall and Police Station and 911 Village Hall & Police ADDITION & RENOVATION FAGUTV NEEDS ASSESSMEN7` CITY OF CAPE GIRARDEAU KENOSHA JOINT SERVICES Cape Girardeau, Missouri (SHERIFF AND POLICE) Police Station SPACENEEDSSTUDV Kenosha, Wisconsin Shooting Range NEw CITY OF DeKALB* DeKalb, Illinois VILLAGE OF LOMBARD* Police Facility 5PACENEED55ruD,* Lombard, Illinois Police Facility NES Village Hall, Police, Fire & Public Works FACIurvNEEDSAssEssMENT* *Project completed while Beth was affiliated with another firm CITY OF ELMHURST Elmhurst, Illinois Police Station SPACENEEDSSTUDV VILLAGE OF HANOVER PARK* Hanover Park, Illinois Police Station NES TOLLESON POLICE DEPARTMENT* Tolleson, Arizona Police & Court Facility NES CITY OF RACINE Racine, Wisconsin Public Safety Building (PD/FD) SPACE NEEDS STUDY VILLAGE OF ROMEOVILLE* Romeoville, Illinois Village Hall & Police Facility NES Page 28 0 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ELIZABETH CERNY, AIA CITY OF WEST CHICAGO* DEPARTMENT OF DEFENSE* West Chicago, Illinois Indianapolis, Indiana City Hall MASTERPLAN* Major Emmet J. Bean Center Police Facility FACIUTVNEED5A55E55MEN7* UPGRADE & REMODEL* Major Emmet J. Bean Center Roof CITY OF WICHITA FALLS* Renewable Energy UPGRADES* Wichita Falls, Kansas City Hall & Police FAC7UD'NEED5A55ES5MEN7* Major Emmet J. Bean Center DOD Security UPGRADES ELK GROVE VILLAGE FD Elk Grove Village, Illinois DEPARTMENT OF CORRECTIONS & REHAB* Station No. 10 NEW Stockton, California California Health Care Facility Station No. 8.5 NEW DESIGN BUILD PROPOSAL FOR NEIN FACIUT➢* HARLEM-ROSCOE FPD Roscoe, Illinois Station No. 2 ADDITION&RENOVATLON Station No. 3 ADDITION&RENOVATION LOCKPORT TOWNSHIP FPD Lockport, Illinois Station No. 1 NEW ROMEOVILLE FIRE DEPARTMENT* Romeoville, Illinois Station No. 8 NES 911 Dispatch Center NEkJ* VILLAGE OF HANOVER PARK* Hanover Park, Illinois Police Firing Range NEN! VILLAGE OF ROMEOVILLE* Romeoville, Illinois Police Firing Range NkJ" CITY OF WHEATON* Wheaton, Illinois Police Department Firing Range RENOVATION* VILLAGE OF BARTLETT* Bartlett, Illinois Public Works FAC7UTV NEEDS ASSESSMENT* Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes 0 2018 FGM Architects Page 29 FGM ARCHITECTS Steve has worked with local municipal governments and those who lead them for more than 34 years. PROJECT ROLE EDUCATION CERTIFICATIONS Steve will serve as the BS in Landscape Licensed Landscape Landscape Architect for the Architecture Architect, Illinois, 1992 Village of Mount Prospect The Ohio State University, LEED AP BD+C Police Department. 1982 STEVE W. WELTER, PLA, LEED AP BD+C LANDSCAPE ARCHITECT American Society of Landscape HQ Station No. 1 RENoVArIoN Steve will strive to successfully blend the qualities of the natural environment with the needs of the client. Whether the client requires design for new construction, enhancement of existing landscapes or full renovation, he provides the guidance, knowledge and creative design that will allow them to attain their objectives. Ultimately, your economic requirements for this project will determine the most suitable land -use plan. Balancing these requirements with the site's resources and limitations requires careful planning, market understanding and land -use sensitivity. SELECT EXPERIENCE CONTACT STEVE 630.574.8736 phone VILLAGE OF ADDISON CITY OF OAKBROOK TERRACE stevewQfgmarchitects.com Addison, Illinois Oakbrook Terrace, Illinois 911 Communication Center NEw City Facilities co^�cwr� Village Hall NEw THOUGHT LEADERSHIP HQ Station No. 1 NEw VILLAGE OF RIVER FOREST American Society of Landscape HQ Station No. 1 RENoVArIoN River Forest, Illinois Municipal Building RENoVArIoN Architects (ASLA) Station No. 2 ADDITION&RENOVATION Forest Park Chamber of Station No. 3 NEw VILLAGE OF ARLINGTON HEIGHTS Commerce & Development Arlington Heights, Illinois The Morton Arboretum VILLAGE OF BENS ILLE Village Hall NEw The Chicago Botanical Garden Bensenville, Illinois ois Police Station EEAslelury&sPACENEEDssruDv Station No. 4 ADDIIToN&RENoVATIoN U.S. Green BuildingCouncil Police Station NEw Station No. 3 ADDIIToN&RENoVATIoN Station No. 2 NEw VILLAGE OF NEW LENOX Station No. 1 NEw New Lenox, Illinois Police Station NEw VILLAGE OF HODGKINS Hodgkins, Illinois HARLEM-ROSCOE FPD Village Hall DE51ON Roscoe, Illinois 911 Dispatch Center ADDITION&RENOVATION VILLAGE OF LAKE IN THE HILLS Station No. 1 sPACENEEpsANAcrsis Lake in the Hills, Illinc Village Hall NEw Station No. 1 ADDITION&RENOVArION Station No. 2 ADDITION&RENOVATION ALGONQUIN-LAKE IN THE HILLS FPD Station No. 3 ADDITION&RENOVATION Lake in the Hills, Illinois HQ Station NEw VILLAGE OF LAKEMOOR Station No. 2 NEw Lakemoor, Illinois Village Hall/Police Station NEw FLORISSANT VALLEY FPD Florissant, Missouri CITY OF LINCOLN House No. 1/Admin NEw *Project completed while Steve was Lincoln, Illinois House No. 2 NEw affiliated with another firm Police Department ADAPTIVEREusE Administration Building slrEsruDlEs Page 30 0 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM A R C H, _ CONSULTANTS We make it a practice to enlist only those consultants who have demonstrated exceptional performance, especially in public safety experience. FGM is a professional architectural design firm. In order to integrate other discipline firms into our team of professionals, we are extremely meticulous and particular as to how firms are selected to work on our projects. We have longstanding relationships with many of the consultants with whom we work, some going back over 40 years. We understand the importance of selecting the appropriate experts for your village. The experts we have selected complete our public safety facilities according to a high standard and client expectation. We have provided listings of the consultants with whom we have worked and/or are currently working with on a variety of projects. We have a long working relationship with each of these consultants and are a tried and proven team. Each team has a variety of expertise in varying project types and we propose to work with the Village of Mount Prospect Police to discuss the best team to deliver engineering services to meet the needs of your project. MEP ENGINEERING Consolidated Consulting Engineers 212 South Milwaukee Avenue Wheeling, Illinois 60067 847.215.0690 phone cceng.net STRUCTURAL ENGINEERING McCluskey Engineering Corporation 1887 High Grove Lane Naperville, Illinois 60540 630.717.5335 phone mccluskeyeng.com SECURITY CONSULTING Correct Electronics, Inc. 1807 South Washington Street, Suite 110 Chicago, Illinois 60606 630.689.1 190 phone COMMISSIONING AGENT Prasino Engineering, LLC 747 East Boughton Road Suite 208 Bolingbrook, Illinois 60440 630.800.4579 phone prasinoeng.com Village of Mount Prospect - Mount Prospect Police Department Projed Team Resumes © 2018 FGM Architects Page 31 FGM ARCHITECTS 4"-..Wz16k CONTACT CONSOLIDATED CONSULTING ENGINEERS 212 South Milwaukee Avenue Wheeling, Illinois 60067 847.215.0690 phone cceng.net MEP ENGINEERING EXPERTISE Consolidated Consulting Engineers has been deeply involved in the municipal sector in both renovation and new projects. They understand the differences between municipalities and where they are with respect to heir budgets and goals. Their engineers are familiar with the wide range of mechanical and electrical systems, which make up this sector and the codes and standards by which the various occupancies are required to meet. Above all, they understand who will be using the facilities and who will be maintaining the facilities. Every system they design must be safe, comfortable and reliable for the end users. CONSOLIDATED CONSULTING ENGINEERS MEP ENGINEERING The professional service Consolidated Consulting Engineers offers encompasses a wide range of mechanical and electrical engineering. It is their goal to provide each of their clients with a complete environmental balance of ventilation, air conditioning, plumbing and electrical systems that is not only the best possible option within your economic and energy saving limitations, but one that is also an integral and compatible part of the architectural design. SELECT EXPERIENCE VILLAGE OF MOUNT PROSPECT Mount Prospect, Illinois Fire Station 14 Public Works ADD/TION Emergency Operations Center ADDITION VILLAGE OF BENSENVILLE Bensenville, Illinois Police Station CITY OF DES PLAINES/NORTH SUBURBAN EMERGENCY COMMUNICATIONS CENTER Des Plaines, Illinois 911 Communications Center ExPANNoN& RENOVATION ELK GROVE VILLAGE Elk Grove Village, Illinois Administration & Public Safety Complex (VH/PD/FD) NEw&RENoVA77oN VILLAGE OF FRANKLIN PARK Franklin Park, Illinois Police Station NEw VILLAGE OF GLENDALE HEIGHTS Glendale Heights, Illinois Police Station NEw Civic Center RENoVA77oN VILLAGE OF GLENVIEW Glenview, Illinois Police Station NEw CITY OF HIGHLAND PARK Highland Park, Illinois Police Station NEw VILLAGE OF HOFFMAN ESTATES Hoffman Estates, Illinois Police Station NEw VILLAGE OF LAKEMOOR Lakemoor, Illinois Village Hall/Police Station NEw VILLAGE OF MANHATTAN Manhattan, Illinois Police Department/Village Hall ADAPTIVE REusE VILLAGE OF MATTESON Matteson, Illinois Village Hall Board Room & Police Station RENoVA77ov VILLAGE OF MUNDELEIN Mundelein, Illinois Police Station NEw VILLAGE OF NEW LENOX New Lenox, Illinois Police Station NEw VILLAGE OF PALATINE Palatine, Illinois Police Station NEw VILLAGE OF SKOKIE Skokie, Illinois Police Station ADAPrNEREu5EImA✓oRRENoUATIoN CITY OF ST. CHARLES St. Charles, Illinois Police Station 5PAcENEED55ruDv&5/TE5TUD/E5 Police Station NEw Page 32 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS II 11 CONTACT McCLUSKEY ENGINEERING CORPORATION 1887 High Grove Lane Naperville, Illinois 60540 630.717.5335 phone mccluskeyeng.com STRUCTURAL ENGINEERING EXPERTISE McCluskey Engineering Corporation offers preparation of contract structural documents for new construction or remodeling of existing structures, consultation of construction methods including cost comparisons and value engineering and evaluation of existing structures or distressed conditions. McCluskey also provides the structural design and shop drawing preparation for the precast concrete industry. McCLUSKEY ENGINEERING CORPORATION STRUCTURAL ENGINEERING McCluskey Engineering Corporation was founded in 1988 to provide a wide range of structural engineering design and consulting services to architects, contractors and owners. The extensive experience of the firm's principal and key staff members allows McCluskey to offer a full range of engineering services. SELECT EXPERIENCE VILLAGE OF MOUNT PROSPECT Mount Prospect, Illinois Public Works Building ADDITIoNs Fire Station No. 12 & 14 VILLAGE OF ADDISON Addison, Illinois New 911 Communication Center NEw VILLAGE OF BENSENVILLE Bensenville, Illinois Police Station NEw CITY OF CHICAGO HEIGHTS Chicago Heights, Illinois 911 Center MAs-ERPLAN ELK GROVE VILLAGE Elk Grove Village, Illinois Administration & Public Safety Complex (VH/PD/FD) NEw & RENoPA.- VILLAGE OF FRANKLIN PARK Franklin Park, Illinois Police Station NEw VILLAGE OF GLENDALE HEIGHTS Glendale Heights, Illinois Police Station & 911 Dispatch Center VILLAGE OF HOFFMAN ESTATES Hoffman Estates, Illinois Police Station NEw KENOSHA JOINT SERVICES Kenosha, Wisconsin Shooting Range NEw VILLAGE OF LAKEMOOR Lakemoor, Illin Village Hall/Police Station NEw LAKE COUNTY Libertyville, Illinois Dept. of Transportation Facility ExPANsloN VILLAGE OF MANHATTAN Manhattan, Illinois Police Department/Village Hall VILLAGE OF MATTESON Matteson, Illinois Police Station ADD/TION MICHIGAN CITY POLICE DEPARTMENT Michigan City, Indiana Police Station sruDl, VILLAGE OF NEW LENOX New Lenox, Illinois Police Station NEw VILLAGE OF ORLAND PARK Orland Park, Illinois Police Station ADADTIvEREu5E VILLAGE OF PALATINE Palatine, Illinois Police Station NEw CITY OF ROCKFORD Rockford, Illinois Police Department sPAcENEEDSANAcrsis District Police Station No. 1 NEw District Police Station No. 2 ADADTIvEREusE District Police Station No. 3 ADADTIvEREusE VILLAGE OF SKOKIE Skokie, Illinois Police Station ADADTIvEREu5E NORTHWESTERN UNIVERSITY Evanston, Illinois University Police ADAPnUEREus€ Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 33 FGM ARCHITECTS CONTACT CORRECT ELECTRONICS 1807 South Washington Street Suite 110 Naperville, Illinois 60565 630.689.1 190 phone SECURITY CONSULTING EXPERTISE Correct Electronics, Inc. provides services for electronic security systems services, detention doors, hardware and equipment, design, contract development and construction administrative services. CORRECT ELECTRONICS, INC. SECURITY CONSULTING Correct Electronics specializes in providing security consulting to Police Departments. Correct Security's goal is to provide cost effective, total security solutions that provide a seamless integration of security electronics and security hardware. SELECT EXPERIENCE VILLAGE OF ADDISON Addison, Illinois New 911 Communication Center NEw CITY OF AURORA Aurora, Illinois Police Station NEw VILLAGE OF BENSENVILLE Bensenville, llliro s Police Station VILLAGE OF BOURBONNAIS Bourbonnais, Illinois Police Station NEw VILLAGE OF HARWOOD HEIGHTS Harwood Heights, Illinois Police Station & Village Hall ADAPTIVEREusE CITY OF HIGHLAND PARK Highland Park, Illinois Police Station NEw VILLAGE OF HOFFMAN ESTATES Hoffman Estates, Illinois Police Station NEw VILLAGE OF LAKEMOOR Lakemoor, Illinois Village Hall/Police Station NEw CITY OF CRYSTAL LAKE VILLAGE OF MANHATTAN Crystal Lake, Illinois Manhattan, Illinois Police Station NEw Police Department/Village Hall ELK GROVE VILLAGE ADAPTIVE REUSE Elk Grove Village, Illinois VILLAGE OF NEW LENOX Administration & Public Safety Complex New Lenox, Illinois (VH/PD/FD)NEwaREN- Police Station NEw VILLAGE OF FRANKLIN PARK Franklin Park, Illinois Police Station NEw VILLAGE OF GLENCOE Glencoe, Illinois Police Station VILLAGE OF GLENDALE HEIGHTS Glendale Heights, Illinois Police Station NEw VILLAGE OF GLENVIEW Glenview, Illir, Police Station VILLAGE OF GRAYSLAKE Grayslake, Illinois Police Station NEw VILLAGE OF PALATINE Palatine, Illinois Police Station NEw VILLAGE OF ROUND LAKE Round Lake, Illinois Police & Public Works Facility NEw VILLAGE OF SCHAUMBURG Schaumburg, Illinois Police 911 Communications Center NEw VILLAGE OF SKOKIE Skokie, illinois Police Station & 911 Dispatch Center ADAPTIVE REUSE/MAJOR RENOVATION Village Hall RENoVATIoN Public Works RENoVATIoN Fire Department RENoVATION Page 34 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS IL 1) PRASINO ENGINEERING PRASINO ENGINEERING, LLC 747 East Boughton Road Suite 208 Bolingbrook, Illinois 60440 630.800.4579 phone prasinceng.com COMMISSIONING EXPERTISE Prasino Engineering, LLC has international experience, specializing in Mission Critical, K-12 Education, Healthcare, Higher Education, Government, Industrial, Commercial, Waste Water, and Food Service. The firm is owned and operated by licensed Professional Engineers with over 35 years of industry experience. PRASINO ENGINEERING, LLC COMMISSIONING CONSULTANT Prasino Engineering, LLC is a consulting engineering firm with an integrated approach in which the firm closely interacts with Owners, Architects, Contractors and Inspectors to provide a cohesive solution. The firm offers commissioning, retro -commissioning, design, designtbuild, energy analysis, master planning, facility assessments, drawing review, code analysis, construction services, and AutoCAD/Revit services. SELECT EXPERIENCE CICERO SCHOOL DISTRICT 99 Cicero, Illinois Warren Park Summer 2017 Evaluations Sherlock Elementary School J. STERLING MORTON SCHOOL DISTRICT 201 Cicero, Illinoi Morton High School Administration Building CHICAGO PUBLIC SCHOOLS Chicago, Illinois Electrical Assessments ADVOCATE HEALTHCARE LUTHERAN GENERAL Park Ridge, Illinois ED & Surgery Expansion Park Ridge Chiller Rooftop Unit Data Center PALOS COMMUNITY HOSPITAL Palos Heights, Illinois Power Quality Analysis PRESENCE ST. JOSEPH Chicago, Illinois Generator Paralleling Switchgear BMO HARRIS - ILLINOIS Tier II Data Center BMO HARRIS - WISCONSIN Tier III Data Center BMO HARRIS - NEW YORK Tier III Data Center SPINNING WHEEL RESTAURANT Restaurant Renovation HUB GROUP Oak Brook, Illinois Disaster Recovery TEAM TECHNOLOGIES Batavia, Illinois Data Center PANDUIT Romeoville, Illinois Disaster Recovery Romeoville Relocation Orland Park iPDU Romania iPDU Warehouse UNITY TEMPLE Oak Park, Illinois Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 35 FGM ARCHITECTS HKM tXNtKItNLt The greatest benefit the FGM team can bring to the Village of Mount Prospect Police Department is to ensure that your needs are translated into reality. Our experience brings value to your project. We provide quality design that responds to the functional and aesthetic requirements of each project. We consistently deliver projects that are reflective of the high level of energy and creativity of our team. We have the leadership expertise to oversee the schedule, budget, communication and management issues involved in projects. The projects we have highlighted on the following pages are just a few of the solutions FGM has provided to our clients to meet their special and unique needs. Page 36 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ADAPTIVE REUSE POLICE STATIONS Our experience includes many adaptive reuse police station projects. Several of these projects are very similar to this project which involves converting former manufacturing/warehouse facilities into a police station. BENSENVILLE POLICE DEPARTMENT Bensenville, Illinois Adaptive reuse of a former manufacturing facility which was abandoned for serveral years HARWOOD HEIGHTS POLICE DEPARTMENT Harwood Heights, Illinois Adaptive reuse of a former manufacturing facility LINCOLN POLICE DEPARTMENT Lincoln, Illinois Adaptive reuse of a former school MANHATTAN POLICE DEPARTMENT Manhattan, Illinois Adaptive reuse of a former retail space (drug store) NORTHWESTERN UNIVERSITY POLICE Evanston, Illinois Adaptive reuse of a former administration facility for the United Methodist Church ORLAND PARK POLICE DEPARTMENT Orland Park, Illinois Adaptive reuse of a former printing facility/carpet and the warehouse ROCKFORD POLICE DISTRICT NO.2 Rockford, Illinois Adaptive reuse and histroical preservation of former Swedish School and medical clinic ROCKFORD POLICE DISTRICT NO.3 Rockford, Illinois Adaptive reuse of a former U.S. Post Office facility SKOKIE POLICE DEPARTMENT Skoie, Illinois Adaptive reuse of a former soft drink bottling plant Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes 0 2018 FGM Architects Page 37 FGM ARCHITECTS PROJECT HISTORY FOR THE PAST 5 YEARS The following is our police project experience for the past five years. ARLINGTON HEIGHTS POLICE DEPARTMENT Arlington Heights, Illinois Police Station FEA51BIUTV STUDV & SPACE NEEDS ANALYSIS BENSENVILLE POLICE DEPARTMENT Bensenville, Illinois Police Station FEA51B/OTV&5PACENEED5ANAir5/5 Police Station NEw BROADVIEW POLICE DEPARTMENT Broadview, Illinois Police Station 5PACENLLD5510DV Village Hall, 911 Center and Police Station RENOVATIONANDADDITION CITY OF CAPE GIRARDEAU Cape Girardeau, Missouri Police Station 5PACENEED55TUDV CITY OF EFFINGHAM Effingham, Illinois Police, 911 Dispatch Center & Emergency Operations Center 5IID1, Police, 911 Dispatch Center & Emergency Operations Center NEw ELMHURST POLICE DEPARTMENT Elmhurst, Illinois Police Station SPACENEED55TUDV FRANKLIN PARK POLICE DEPARTMENT Franklin Park, Illinois Police Station NFw CITY OF HIGHWOOD Highwood, Illinois City Hall, Police Department & Library RENOVATION STUDY CITY OF COUNTRYSIDE KENOSHA JOINT SERVICES Countryside, Illinois Kenosha, Wisconsin City Hall & Police Station 5PACENEED55IID1, Firing Range 5IID1,ANDRENoVATIoN CITY OF EDWARDSVILLE Edwardsville, Illinois Public Safety Facility (PD/FD) SPACE NEEDS STUDV Public Safety Facility (PD/FD) NEw FARMINGTON POLICE DEPARTMENT Farmington, Missouri Police Station FEA51BIED'57UD1' Police Station RENOVATION CITY OF KINLOCH Kinloch, Missouri City Hall & Police Station NEw CITY OF MCHENRY McHenry, Illinois Municipal Campus SPACENEED55TUD1, Police Administration & 911 Center RENOVATION Police Station PLANNING5TUDr CITY OF LAKE FOREST Lake Forest, Illinois Public Safety Building (PD/FD) Lobby and Police Records RENOVATION VILLAGE OF LAKEMOOR Lakemoor, Illinoiz Village Hall/Police Station 5PAOFNEED5 STUDV Village Hall/Police Station NEw CITY OF LINCOLN Lincoln, Illinois Fire Department/Police Department MASTER PLAN City Hall & Police Department CONCEPTUAL PLANNING STUDV Police Department ADAPTIVEREusE MANHATTAN POLICE DEPARTMENT Manhattan, Illinois Police Department/Village Hall ADAPTIVE REU5E MORTON GROVE POLICE DEPARTMENT Morton Grove, Illinois Police Station MA5TERPLAN MUNDELEIN POLICE DEPARTMENT Mundelein, Illinois Reception Desk 5ECURM'RFNOV4pC' Page 38 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS POLICE EXPERIENCE 2013 - 2018 VILLAGE OF MOUNT PROSPECT Mount Prospect, Illinois Police, EOC, Fire & Public Works FACIUTIEs STUDY Police and Fire Department SPACE NEEDS sTUDV Police Station CONCEPTUAL DES/GNSTUDV NEW LENOX POLICE DEPARTMENT New Lenox, Illinois Police Station NEw NORRIDGE POLICE DEPARTMENT Norridge, Illinois Police Station 5PACENEED55rUDv NORTHWESTERN UNIVERSITY Evanston, Illinois Police Station ADAPTIVE REUSE/MAJOR RENoVATIoN CITY OF PARK RIDGE Park Ridge, Illinois City Hall and Police Department MASTER PLAN sTUDV CITY OF RACINE Racine, Wisconsin Police and Fire Department SPACE NEEDS sTUDV VILLAGE OF ROXANA Roxana, Illinois Village Hall, Police & Fire FACIUTVASSESSMENT & MASTER PLAN Village Hall, Police & Fire NEw ROCKFORD POLICE DEPARTMENT Rockford, Illinois Police Department SPACE NEEDSANAcrs15 District Police Station No. 1 NEw District Police Station No. 2 ADAPTIVE REUSE/MAJOR RENOVATION District Police Station No. 3 ADAPTIVE REUSE/MAJOR RENOVATION VILLAGE OF SHILOH Shiloh, Illinois Village Hall and Police Station SPACE NFED5 STUDV SOUTH BARRINGTON POLICE DEPARTMENT South Barrington, Illinoi-- Police Station DES/GNASs/STANCE ST. CHARLES POLICE DEPARTMENT St. Charles, Illinois Police Station 5PACENEED55ruDv&5/TE5TUD/ES Police Station NEw VILLAGE OF TOWER LAKES Tower Lakes, Illinois Village Hall & Police Station SPACE NEEDS STUDY CITY OF WHEATON Wheaton, Illinois Police Department Firing Range RENOVATION Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 39 FGM ARCHITECTS ADAPTIVE REUSE POLICE STATION The Village of Bensenville first turned to FGM for a space needs study and test fit for its police department facilities. The evaluation found that the existing public safety building was deficient in size and had code issues. FGM determined that the village's facility needs were 36,000 sf and the team weighed three different locations the village had earmarked for potential new sites. HIGHLIGHTS Project Role Architect of Record Located in Bensenville, Illinois Size 45,697 sf Completed Spring 2015 Estimated Cost $12,152,800 Actual Cost $12,426,992 LEED Gold certified Page 40 © 2018 FGM Architects Ultimately, the village opted for an existing 46,000 sf manufacturing building that had been vacant since 1998. Due to the success of the study, the village worked with FGM to create the schematic design of the new police headquarters. The abandoned manufacturing building at 345 East Green Street was an unattractive community element that would benefit the community were it repurposed. The adaptive reuse project consisted of a complete renovation, creating a community -centric and user-friendly building. The new state-of-the-art headquarters addresses its numerous functional and operational issues. The headquarters is ADA compliant, allows reports to be taken in private and provides for a safer environment for officers, prisoners and the general public. It is designed to facilitate modern and professional police investigations, operations and training, and includes a large multipurpose room, allowing for more interaction with the public at meetings. The headquarters also serves as a fully equipped Emergency Operations Center. This project is LEED Gold certified. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS BENSENVILLE POLICE & EMERGENCY MANAGEMENT HEADQUARTERS rz I• -L 14 w.' POLICE AkAG E r� FIRING I I RANGE EVIDENCE = F P I BOOKIN.G E -i 8 , FITNESS - �- LOCK R O MS LUNCH r.: - ,ATROL ISVESTIGA IONS LOCKER_ :I MECHANICAL ROOMS RECORDS 1 - d I Wi � PP 6CE I 4i1 PEJBLIC MULTI-PURPO�k,..-- -t -–� —r– - - Village of Mount Prospect - Mount Prospect Police Department Projed Team Resumes © 2018 FGM Architects Page 41 FGM ARCHITECTS ADAPTIVE REUSE POLICE STATION ir Ir OIL,, i' IH LINCOLN POLICE STATION ADAPTIVE REUSE The City of Lincoln Police Department operated in a building leased to them by the county. The department had outgrown the space and the building posed myriad deficiencies including co -mingling of staff and visitors presenting both safety and privacy concerns, a cramped lobby with no discernible entrance, a lack of parking, an inefficient operational layout and rising repair and maintenance costs. HIGHLIGHTS Project Role Architect of Record Located in Lincoln, Illinois Size 13,589 sf Completed May 2018 (estimated) Estimated Cost $2,813,000 Page 42 © 2018 FGM Architects After a thorough space needs analysis, FGM made recommendations for a new station that would meet the department's needs today and in the future. A former school in Lincoln was identified as a potential location for the new station and FGM conducted a test fit of the site. The former school and site was selected by the City of Lincoln. Benefits of adapting the existing school included being in a good location within the city, proximity to major streets, room for public parking, an annex lot for squad parking as well as the space needed within the building to accommodate the planned 14,000 sf police station. There is also a playground on the existing site, which will remain. The new station gives the City of Lincoln precisely what it wwneeded — a new home for the police department with the space needed, increased operational efficiency and a prominent location within the community as well as a very cost effective solution. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS LINCOLN POLICE STATION ADAPTIVE REUSE WOMEN'S V LOCKERS FITNESS STORAGE/FUTURE DEPUTY CHIEF �NIIIE STORAGE N ASl � JCLGUM �.IgftRE; CLEANING LOCKERS MECHANICAL �u. BREAK ` ROOM ILI MEN'S VEN01G � ARMORY IT HN TRAINING _ ROOM TRAINING C STORAGE / ADMINISTRATION _ '...,r - MEN WOMEN LOBBY RECOFDS i- REPORT - 000T�qLK� FILES JISTRATIO CHIEF I IDENCE ROCESSING , EVIL ` STC SHARED ONFERENCE PATROL INVESTIGATIONS 0' 4' 8' Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 43 FGM ARCHITECTS ADAPTIVE REUSE POLICE STATION r N. In 2008, FGM completed a thorough space needs analysis of all of the village's municipal facilities. In 2013, the village decided to move forward with the renovation of an existing building to house a 6,000 sf police station with an 850 sf addition. HIGHLIGHTS Project Role Architect of Record Located in Manhattan, Illinois Size 850 sf addition 6,000 sf renovation Completed April 2015 Estimated Cost $2,072,813 Actual Cost $2,054,048 Page 44 © 2018 FGM Architects The renovation was part of the village's long-term plans to update their public safety facilities. FGM's ability to effectively program spaces with challenging parameters was key to FGM's selection. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ADAPTIVE REUSE POLICE STATION Northwestern University's (NU) Police Department had outgrown its former facilities. Working out of a residential home that had been converted into a station, the tight space made servicing the Big 10 school (with regular football games, noteworthy speakers, diplomats and politicians) difficult. Therefore, the NU Police Department realized it was in need of a larger, more professional space from which to operate. HIGHLIGHTS Project Role Architect of Record Located in Evanston, Illinois Size 58,000 sf Completed March 2013 Estimated Cost $5,000,000 Actual Cost $5,180,199 The police department was allocated space alongside the Office of Alumni Relations and Development (which occupies roughly 58,000 sf) in an early 20t1 century storage building the university wanted to convert. With the goal of creating a professional facility that also commanded a community presence, FGM was approached due, in part, to how impressed NU's Police Department had been with the nearby Skokie Police Station FGM had completed. Working closely with both NU's Police Department and University Facilities, FGM sought to create a dynamic, functional and professional looking design that met the police department's needs. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes The design process took the mechanical and spatial limitations of the allocated site into consideration to deliver a final design that was both aesthetically pleasant and within budget. The completed station features a state-of-the-art communications center, a command suite, administrative offices, field services, suspect processing, an evidence room, a garage and a prominent entry -way that boldly announces the department's presence within the community. © 2018 FGM Architects Page 45 FGM ARCHITECTS NORTHWESTERN UNIVERSITY POLICE STATION EXISTING •1 MECH L.._ LUNCH J E%ISrINc.. J ELEC. —. EXISTING IT FITNESS r -- I Partial First Level Page 46 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ADAPTIVE REUSE POLICE STATION ORLAND PARK POLICE STATION STUDY & CONVERSION The Village of Orland Park wanted to develop an environmentally sustainable renovation of an existing warehouse building within the municipal campus and to provide space and growth for the large police department. HIGHLIGHTS Project Role Architect of Record Located in Orland Park, Illinois Size 93,175 sf Completed March 2007 Estimated Cost $12,544,650 Actual Cost $12,544,650 LEED Gold certified The existing warehouse, with its tall structure, afforded for tremendous overhead value, which was coupled with floor to ceiling windows to create wonderful spaces with natural light. The large footprint of the existing building allowed for a highly efficient layout on a single level. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes A number of environmentally sustainable design strategies were employed, including savings in energy, water and materials, leading to LEED Gold certification, the first in the U.S. for police stations. This project is LEED Gold certified. © 2018 FGM Architects Page 47 - - ----------- -- --- - The Village of Orland Park wanted to develop an environmentally sustainable renovation of an existing warehouse building within the municipal campus and to provide space and growth for the large police department. HIGHLIGHTS Project Role Architect of Record Located in Orland Park, Illinois Size 93,175 sf Completed March 2007 Estimated Cost $12,544,650 Actual Cost $12,544,650 LEED Gold certified The existing warehouse, with its tall structure, afforded for tremendous overhead value, which was coupled with floor to ceiling windows to create wonderful spaces with natural light. The large footprint of the existing building allowed for a highly efficient layout on a single level. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes A number of environmentally sustainable design strategies were employed, including savings in energy, water and materials, leading to LEED Gold certification, the first in the U.S. for police stations. This project is LEED Gold certified. © 2018 FGM Architects Page 47 FGM ARCHITECTS ORLAND PARK POLICE STATION STUDY & CONVERSION Page 48 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ADAPTIVE REUSE POLICE STATION The City of Rockford is one of Illinois' largest metropolitan areas with a robust police force that operated out of one centralized facility. Rockford Police covers a 65 -mile radius area and they determined that a district station approach would best support the community -policing philosophy of the department. HIGHLIGHTS Project Type Adaptive Reuse Project Role Design Architect Location Rockford, Illinois Size 41,570 sf Completed January 2017 Estimated Cost $8,300,000 Actual Cost $7,918,281 FGM completed a study to evaluate the logistics of moving from one centralized department to three district stations. A historic elementary school that was closed by the school district is the new home of the District 2 station. The adaptive reuse of the 29,800 sf building, located centrally within District 2, provided the best option to develop the new station. The three-story building (including a basement) was completely renovated and a 2,200 sf addition was added to accommodate district command, patrol, investigations, temporary holding, temporary evidence storage and support spaces. The renovated facility includes a renovated Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes gymnasium space which is used for meetings and community outreach events. A new elevator and stairs were placed in the addition to ensure accessibility to the entire building. 112 sworn officers will serve the community from the District 2 station. The historic nature of the building required that all original interior partitions remain in place. Windows were replaced and updated. The adaptive reuse and renovation of the District 2 station has helped the department more evenly disperse officers throughout the city. Shorter responses to calls, better community integration and, ultimately, a reduction in crime are the goals of the decentralized model. © 2018 FGM Architects Page 49 FGM ARCHITECTS ROCKFORD POLICE DEPARTMENT DISTRICT STATION NO. 2 Page 50 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ADAPTIVE REUSE POLICE STATION The City of Rockford is one of Illinois' largest metropolitan areas with a robust police force that operated out of one centralized facility. Rockford Police covers a 65 -mile radius area and they determined that a district station approach would best support the community -policing philosophy of the department. HIGHLIGHTS Project Type Adaptive Reuse Project Role Design Architect Located in Rockford, Illinois Size 32,500 sf Completed January 2017 Estimated Cost $5,600,000 Actual Cost $4,966,000 FGM completed a study to evaluate the logistics of moving from one centralized department to three district stations. A former United States Post Office building is the new home of the District 3 station. The adaptive reuse of the 32,500 sf building, located centrally within District 3, provided the best option to develop the new station. The one-story building was completely renovated and includes spaces for the public, police department administration, district command, investigations, patrol, temporary holding, temporary evidence storage and support spaces. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes The facility also has a training center for the department. 59 sworn officers will serve the community from the District 3 station. The adaptive reuse and renovation of the District 3 station has helped the department more evenly disperse officers throughout the city. Shorter responses to calls, better community integration and, ultimately, a reduction in crime are the goals of the decentralized model. © 2018 FGM Architects Page 51 FGM ARCHITECTS ROCKFORD POLICE DEPARTMENT DISTRICT STATION NO. 3 Page 52 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ADAPTIVE REUSE POLICE STATION In transforming their existing police station, a nondescript industrial space, the Village of Skokie wanted to reuse as much of the existing building as possible. With the initial goal of achieving LEED Silver certification, the village envisioned an environmentally responsible station that welcomes the public, respects Skokie's history and promotes interdepartmental interaction. HIGHLIGHTS Project Role Architect of Record Located in Skokie, Illinois Size 79,300 sf Completed October 2010 Estimated Cost $21,054,229 Actual Cost $21,756,486 LEED Gold certified The team's design solution reused or recycled all of the previous building. Although the new station footprint is smaller than the original structure, existing columns and roof planks were repurposed to create deep overhangs and a parking garage. Interior courtyards provide public areas for employees and visitors to gather. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes Surrounding the courtyards are glass corridors which contribute to the open plan and filtration of natural light into the building's interior spaces. Smart sustainability measures positioned the new station to exceed the village's goal and receive LEED Gold certification. This project is LEED Gold certified. 0 2018 FGM Architects Page 53 FGM ARCHITECTS SKOKIE POLICE NEEDS ANALYSIS & POLICE STATION Page 54 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes �A` FGM ARCHITECTS JIEDWARDSVILLE SPACE NEEDS STUDY & PUBLIC SAFETY FACILITY The City of Edwardsville commissioned FGM to perform a space needs, feasibility and master plan study in preparation for a combined police and fire headquarters. Both the city's police and fire departments had outgrown their facilities. HIGHLIGHTS Project Role Architect of Record Located in Edwardsville, Illinois Size 51,500 sf Completed October 2017 Estimated Cost $11,890,000 Actual Cost $11,965,000 Using the information the study produced, a new combined headquarters station was designed to be located just south of downtown, which allows the departments to be operational during construction. The new 51,500 sf facility houses the full police department and the fire department's administration and primary fire house functions. A major challenge with any combined building is to design for shared space to save cost while also providing the appropriate separation of the departments for security and privacy. To accomplish this, the lobby, community room and fitness room were designed as shared spaces and logically centered between the departments with access controlled doors. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes The final plan allows for both departments to cohabitate while maintaining privacy. The public enters into an inviting two-story space which directs people to either the police or fire departments. The facility has a large training room which also serves as an emergency operation center and community room. The room is dividable to host several different events simultaneously, saving the city money. A major consideration for the city was that the facility had to be consistent with the overall historic architectural character of the buildings in the downtown area. © 2018 FGM Architects Page 55 FGM ARCHITECTS ELK GROVE VILLAGE ADMINISTRATION & PUBLIC SAFETY COMPLEX The village wanted a building that was inviting to the public and environmentally sustainable. Portions of the existing village hall/ police station were demolished and a new village administration space and a police station were constructed in its place. HIGHLIGHTS Project Role Architect of Record Located in Elk Grove, Illinois Size 106,000 sf Completed April 2009 Estimated Cost $24,000,000 Actual Cost $21,200,000 LEED Gold certified The new complex includes a 25 -yard shooting range, indoor underground parking, holding facilities, training/ emergency operations center, a local cable television studio and administration space. A separate bond -out area adjacent to the sally port, but removed from the public entry, puts safety first by keeping released detainees away from the public entrance. This facility received LEED Gold certification with over 13,000 sf of green roof, 21%of recycled materials and plumbing fixtures that reduce water usage by 41 %. This project is LEED Gold certified. Page 56 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ELK GROVE VILLAGE ADMINISTRATION & PUBLIC SAFETY COMPLEX Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 57 FGM ARCHITECTS The new Village of Franklin Park Police Station is a LEED Gold facility that provides the village a strong civic presence. The facility design began with establishing programmatic goals to alleviate some of the functional and operational issues experienced in their previous station, which was located on a different site. HIGHLIGHTS Project Role Architect of Record Located in Franklin Park, Illinois Size 36,700 sf Completed August 2013 Estimated Cost $11,258,284 Actual Cost $13,514,752 LEED Gold certified Page 58 © 2018 FGM Architects This new police station addresses recent changes to policing, such as evidence retention requirements. With a growing community of over 19,800 residents, 43 full-time sworn officers and 26 auxiliary personnel, the new station was designed to serve the police department for the next 50 yea rs. Exterior building materials include brick, precast concrete and metal panels. Responsibly forested wood doors, recycled carpet and low VOC paint and stain are used in the interior. The public is welcomed into an open lobby and community/adjudication room, which is strategically removed from police functions and prisoner areas so both officer and public safety is never compromised. Bond -out occurs on the opposite side of the building from the public areas and the sallyport allows arrestees to be directly transported into the booking and detention areas as to avoid public and private areas, further assuring officer and public safety. This project is LEED Gold certified. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS FRANKLIN PARK POLICE STATION Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 59 FGM ARCHITECTS The combined police station and village hall was experiencing rapid growth which led to space issues. In addition, the village wanted to have a new "look" for the building and relocate the main entrance to the west side of the building. HIGHLIGHTS Project Role Architect of Record Located in Glendale Heights, Illinois Size 40,000 sf Completed January 2013 Estimated Cost $12,385,760 Actual Cost $11,836,172 The design created a new facade along the west side of the station where the new entrance is located and blended the new addition into the existing building. Included in this station are a range, lock-up, a training room, a small garage for a mobile command vehicle and dispatch. In addition to the expansion, the design called for a renovation to some of the existing building for improved evidence storage and lab facilities. Page 60 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS GLENDALE HEIGHTS POLICE STATION Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 61 FGM ARCHITECTS After completing a space needs study and existing building conditions analysis for the City of Highland Park, it was determined that an additional 19,533 sf was needed to meet current operational needs and future requirements of the police department. HIGHLIGHTS Project Role Architect of Record Located in Highland Park, Illinois Size 47,651 sf Completed August 2006 phase June 2007 phase 2 Estimated Cost $9,607,065 Actual Cost $9,911,487 Based on the existing building condition study, the village decided to replace the existing building rather than add the additional square footage. This new station was built on an extremely tight existing site between two major streets and needed to remain operational throughout the project. The building is a two-story structure with a mezzanine and communications tower. To create a more cohesive design, some elements such as the limestone panels continue from the exterior to the interior. A formal plaza with ceremonial flags creates a strong civic presence for public visitors. The station was demolished and built in phases to keep the department fully operational throughout construction. Page 62 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS HIGHLAND PARK POLICE STATION a I 1W �7 Village of Mount Prospect - Mount Prospect Police Department Projed Team F cumes © 2018 FGM Architects Page 63 FGM ARCHITECTS T-1ifm HOFFMAN ESTATES POLICE STATION The biggest challenge with the design of the Hoffman Estates Police Station was to design a cost-effective facility with civic presence that incorporated sustainable building techniques and a highly prominent public portion of the police station that would welcome the community. HIGHLIGHTS Project Role Architect of Record Located in Hoffman Estates, Illinois Size 77,800 sf Completed July 2010 Estimated Cost $21,415,000 Actual Cost $21,200,000 LEED Gold certified Page 64 © 2018 FGM Architects The new station has an expansive green roof to mitigate storm water run-off and keep the building cool during the summer months. A private roof top patio for the officers' use is an amenity highlight A resource center adjacent to the lobby space serves the community in a variety of ways—from blood drives to after-school programs. The lobby, with a high ceiling and ample natural light, has a graphic mural of the police department interacting with citizens and a kiosk with scrolling news, notes and events. This project is LEED Gold certified. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS HOFFMAN ESTATES POLICE STATION Village of Mount Prospect - Mount Prospect Police Department Projed Team Resumes © 2018 FGM Architects Page 65 FGM ARCHITECTS The Village of Lakemoor outgrew its existing municipal facilities and looked to FGM to spearhead the space needs study for the police department and village hall. The police station facility had been torn down and the department was working in a temporary space. HIGHLIGHTS Project Role Architect of Record Located in Lakemoor, Illinois Size 17,000 sf Completed October 2016 Estimated Cost $5,500,000 Actual Cost $5,516,756 The village was in need of upgrades to public facilities and wanted to retool the look and feel of Lakemoor's public spaces. After FGM assessed the department's specific issues, Lakemoor chose FGM to plan and build new municipal facilities to accomplish these goals for the village. Another goal for the village was envisioning the look of the building and assisting them in creating a new brand for the village. The combination of a village hall and police station poses a different set of challenges for the FGM team in balancing the uses and needs of both of these spaces. FGM's municipal experience helped the village re -envision this public space and plan for the future. Page 66 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS LAKEMOOR VILLAGE HALL & POLICE STATION SPACE NEEDS STUDY & MUNICIPAL CENTER %,E �g E n.- - LT rs. m aF � o Tr Lj&j Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 67 FGM ARCHITECTS N RENOVATION The City of McHenry had previously completed a space needs analysis and master plan to renovate their municipal center which included the city hall and police station. This was the second phase of the implementation of the master plan and addressed the needs of the police department which were driven by the 911 consolidation efforts of McHenry County. HIGHLIGHTS Project Role Architect of Record Located in McHenry, Illinois Size 6,100 sf Completed March 2017 Estimated Cost $1,297,101 Actual Cost $1,295,087 Page 68 © 2018 FGM Architects The City of McHenry was selected to be one of three regional dispatch agencies in McHenry County. To accommodate the additional agencies to be dispatched, the 911 center needed to be enlarged to accommodate nine dispatch positions. To make space for the 911 center expansion, the police department administration was relocated to the second floor of the municipal center building and included much needed conference room and office space. FGM provided full architectural and engineering services including network infrastructure and audio-visual design. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM After the success of FGM's work to design and construct the Village of New Lenox's village hall, the village hired FGM again in the fall of 2012, this time to design the new Police Station. FGM worked with both the village and police team on the programming and design. HIGHLIGHTS Project Role Architect of Record Located in New Lenox, Illinois Size 30,401 sf Completed December 2014 Estimated Cost $12,243,947 Actual Cost $11,575,740 FGM was called on to make the design of the police station complementary to the design and aesthetics of the village hall. FGM had the challenge of designing for future growth while also developing a seamless look for the building. The village required the station have the "appropriate look" on New Lenox's Veterans Parkway. This station's proximity to the parkway makes it highly visible to the village as a whole, making the facility the backdrop of outdoor events and village functions held on Veterans Pa rkway. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 69 FGM ARCHITECTS NEW LENOX POLICE STATION Page 70 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes I WEAPONS ARMORY ' HOLDING HOLDIN / DUTY BAGS i GARAGE TOILET GUN ___ ____ - — — — — — EL CTRICAL FITNESS LEANT EVIDENCE GARAGE BOOKING ND OUT ❑ _ �) PATROL MACHINE ELEVATOR EQUIPM T ROOM l INTERVIEW STUDY AOA. SERVER! / — — BAGGING JUVENILE DETENTIO PHONE /� _ ETENTIO DETEN �0 MECHANICAL WOMEN'S LOCKERS —_-_ -_—_ MEN'S LOCKERS PROCESSING A.DA - _ DETENn STORAGE G C O EVIDENCE STORAGE Lower Level n �I _ SOFT VIDEO OFFIGE -J— — INVES7�.1 INTERVIEW - _ 4 I-1 OFFICE PATROL . - _ SERVIICCES CONF - — CONF. � — _II IIJ �I �I ,II i I — J— J BREAK ROOM _ SERGEANT PATROL COPYo STORAGE - — - a \ :� �l COMP. z SGTS. \ INVEST. I ! _a E_ ELEVATOR INTERVIEW INTERVIEW V_ v� o INVESTIGATIONS — STORAGE K "— / / F J JANITOR Ll CO. I l Lu— LD LDF. ROLLCALL MEN FILES WOMEN FILES STORAGE! I�J �-E UI f—i I�f ADMIN. 1 T CONFERENCE A/VU FIE WAITING ADMIN. I✓ o _ ASSIST. �u--- COPY TOILET �SUPR. RECORDS REPORT p MULTI-PURPOSE WORE MEN OFFICE DEPUTY DEPUTY CHIEF CHIEF CHIEF J LOBBY REPORT _ Upper Level 0' 4' 8' 16' 32' Page 70 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS ITPALATINE VILLAGE WIDE FACILITIES STUDY & POLICE STATION IMPLEMENTATION The Village of Palatine commissioned a village wide facilities study which identified the long-term needs for the village hall, police, fire and public works departments. This police station project was implemented to address the needs identified by the study. The Palatine Police Department had overcrowded facilities that were causing traffic congestion on a narrow residential street. HIGHLIGHTS Project Role Architect of Record Located in Palatine, Illinois Size 90,700 sf Completed February 2012 Estimated Cost $19,600,000 Actual Cost $20,304,000 A site near a residential neighborhood a few blocks away became available and was the logical choice for the new police station. The design solution projects a professional, welcoming interior and exterior, reflective of a modern police department in a traditional suburban community. AWARDS 2014 Chicago Building Congress, Merit Award Finalist Soaring glass windows maximize natural light, while sustainable concepts and efficiencies minimize the building's environmental impact. Friendly but secure, the new facility reflects the spirit of Palatine's growing downtown area and the department's progressive direction. By providing a landscape berm and privacy fence between the residents and the station, the village demonstrates its commitment to remaining a good neighbor. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 71 FGM ARCHITECTS PALATINE VILLAGE WIDE FACILITIES STUDY & POLICE STATION IMPLEMENTATION 7. Lm 11R�-It,[ Fr -F, 1 ?5 mms i i ■ i ■■ p `- i First Floor Page 72 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS PALATINE VILLAGE WIDE FACILITIES STUDY & POLICE STATION IMPLEMENTATION Second Floor Page 73 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS Iq The City of Rockford is one of Illinois' largest metropolitan areas with a robust police force that operated out of one centralized facility. Rockford Police covers a 65 -mile radius area and they determined that a district station approach would best support the community -policing philosophy of the department. HIGHLIGHTS Project Role Design Architect Located in Rockford, Illinois Size 20,680 sf Completed August 2017 Estimated Cost $6,000,000 Actual Cost $5,979,979 FGM completed a study to evaluate the logistics of moving from one centralized department to three district stations. The first of the decentralized stations is Station No. 1. The new station supports the city's geo-policing initiative. Located within the district it serves, the new station includes a community room which the police department hopes the community will utilize and will help build community and trust between residents and the police. In addition to district command, patrol, investigation, community services, crime reporting, temporary holding, temporary evidence storage and support spaces. 119 sworn officers will serve the community from the District 1 station. This transition and the development of the District 1 station has helped the department more evenly disperse officers throughout the city. Shorter responses to calls, better community integration and, ultimately, a reduction in crime are the goals of the decentralized model. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes 0 2018 FGM Architects Page 74 FGM ARCHITECTS ROCKFORD POLICE DEPARTMENT DISTRICT STATION NO. I 011 011 'il ■11 oil iii ®■ 110 110 11■ 110 . °■ ■ inti ■ 110011 ■ 11001 ■ 11■■II 0 11001 ■ iiiiii � 11001 nm 11001 11011 11■■1 11001 iiiii 11001 11.01 110011 n■■u 11■■II n■■u iiiiii n■■° 11■ 110 110 1■ 11■ ii ii oil iii ti0 �l oil ■: ■ �� 0u ■u ■u ■u �' 11001 111111 11001 11001 l���I viii 11001 11001 11nu 11nu oii11 100001 ii i® 11■ ii ii Page 75 © 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes FGM ARCHITECTS The Streamwood Police Department had significantly outgrown their existing station and with its poor condition, the village elected to replace it. The design of the new station was to also complement the design of the existing village hall which is located on the same municipal campus. HIGHLIGHTS Project Role Architect of Record Located in Streamwood, Illinois Size 68,129 sf Completed July 2007 phase 3 November 2007 phase 4 Estimated Cost $11,541,072 Actual Cost $11,270,800 The new two-story police station was designed as part of a comprehensive re -design of the municipal campus site that also contains a village hall, veteran's memorial and community service garage. Some of the features of the station include a community/ training room, large firing range and a 23 -space indoor parking garage for police vehicles. Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes © 2018 FGM Architects Page 76 FGM ARCHITECTS STREAMWOOD POLICE STATION STAIR (NNRE) BULK EVIDENCE PROCESSING ILJI ER. UNIT COAT 00 ( c C W RK REA. C—E - STAIR p4 yI �6 A//y STOR. ENO. 'lam INiERNEW �fV1PROD. _ CONFCORR. ERENCE S° DENCE OF - I PACKAGING TOR. NE,. FS - STORAGE CORRIDOR HOLD CORR. \' _ RIMS MGR COFFEE/COPT_, A/V - - F GIRL'S ONSOLRE-UP 'E OKRM�' S70R. 0IL. T I' CELL - /QUI SQUAD PARKING (23) CORK -� MEry 5 1 YEN'S 2 JCL AOR �. CORR. MEN'S TOILET _ �y �/ CQ2R CORR. _ - !TRAINING ROOM I MN'S 4 LO INTE -. 9 S S S CLO ..®.9 Q _ CORR. MEN < -JAN. 9 9 FJ� REPoars - } DORR _ \ J STAIR -I� TEC T EN' TO .CORDS AK CORR. CORR. _ VEST W I BUl1PEN _ 0. T 3 MN'S 2 WDMN'S ADDED CELL I- ZI STAR I _L F _--_ T - - CORR ❑O EL. x ') P� ORR Jam- 4 -. ZJ E: FJ ZJ El EJ �1 MEN - '------- ° CORRIDOR _ WOMEN WAITNG LOBBY [ OUT ° INTER VEST.I �' L BOND OUT VESTSULE SALLWG�2T I ° COATS I First Floor Second Floor Lower Le Page 77 C 2018 FGM Architects Village of Mount Prospect - Mount Prospect Police Department Project Team Resumes Tab 6 Project Proposal Form FGM ARCHITECTS VILLAGE OF MOUNT PROSPECT PROJECT PROPOSAL FORM We hereby agree to furnish to the Village, services as outlined in the accompanying proposal in accordance with provisions, instructions, and specifications of the Village. This form must be signed by an authorized agent of the Architect. If the Architect is a corporation, the corporate seal must be affixed. The successful Architect will be required to agree to sign the Village contract and attached appendices (sexual harassment policy, tax liability, etc.). The proposal shall be binding for ninety (90) days following the proposal due date. My signature certifies that the Proposal as submitted complies with all terms and conditions as set forth in the Notice of Request for Qualifications for ARCHITECTURAL SERVICES FOR THE NEW POLICE HEADQUARTERS. I/We certify that I/We am/are authorized to sign as an agent(s) of the firm: PLACE CORPORATE SEAL HERE By.......................................... Print Name ............................: John Dzarnowski Position /Title .......................: President Company Name ....................: FGM Architects Address Line 1 ......................: 1211 West 22nd Street, Suite 700 City, State, ZIP ......................: Oak Brook, Illinois 60523 Telephone .............................: 630.368.8319 Email .....................................: John D(a)-fgmarch itects.com Village of Mount Prospect - Mount Prospect Police Department Projed Proposal Form © 2018 FGM Architects Page 77 O O O O O O �t to O O Ln Ln a Rt � 0 CF) o o r; r; rf of Ol N N - M Ln O O O O O O 00 M 4 O O Lf; C N 00 I, 00 Rt O C'J � m Rt r-Io Rt m LL M r l {/) O O O O O O tA O O O V)- O O E O O O O O R O O O O O r-I I- Ln I- O N N Ln Rt Ln O O O O O O Q. I-� O ci M 6 P� 3 00 V)- O Rt r- O O Rt O Rt 00 00 y 00 Cn M CP O c-I M N M N oc c-I 00 4A Rt -e 0 � Y i O O O O O O U r- r- Ln O r- n Rt m Rt O m 00 O R N 00 0) to V), 0) I- M N Ln N -e O U O O O O O O Ln O Ln O O O ++ 00 Ln N 00 Ln O � c-I l0 00 M N M to c-I 00 V)- rl J N M Rt N M C O N +' (6 C C +, N O v C E.0 q0 E UCL C E 0 0 Q O O O1 L O U O 0) to N 0 4' U N 4' U C L R m L L � •� BVI N � L N LOi a U I Li U H VILLAGE OF MOUNT PROSPECT PROJECT PROPOSAL FORM We hereby agree to furnish to the Village, services as outlined in the accompanying proposal in accordance with provisions, instructions, and specifications of the Village. This form must be signed by an authorized agent of the Architect. If the Architect is a corporation, the corporate seal must be affixed. The successful Architect will be required to agree to sign the Village contract and attached appendices (sexual harassment policy, tax liability, etc.). The proposal shall be binding for ninety (90) days following the proposal due date. My signature certifies that the Proposal as submitted complies with all terms and conditions as set forth in the Notice of Request for Qualifications for ARCHITECTURAL SERVICES FOR THE NEW POLICE HEADQUARTERS. I/We certify that I/We am/are authorized to sign as an agent(s) of the firm: PLACE CORPORATE SEAL HERE By........................... .......... . Print Name .............. ............: John Dzarnoski Position / Title .............. President Company Name.. ............. FGM Architects Address Line 1 .............. ........: 12111 West 22"d Street Suite 700 City, State, ZIP ......................: Oak Brook, Illinois 60523 Telephone .............................: 630.368.8319 Email ....................... ...........: JohnD f marchitects.com Fee Proposal and Acknowledgement Form (Fixed fee pricing to be based on an expected $22,000,000 construction budget and 87,000 s.f. of construction. No percentage based fees will be accepted. All costs within 5% of proposed cost and size shall be covered by this fixed fee. Additional fees beyond 5% will be negotiated.) Base Proposal Pricing: Preliminary Design Design Development Architectural Construction Documents including: • Mechanical Design Electrical Design + Low Voltage/data/cctv Design • Plumbing Design • Fire Protection Design • Structural Design • Coordination with Village Supplied Civil Design Coordination with owner supplied furniture designer Construction Administration $ 164.248 $ 232.863 11 ,� ' w Mi 10.800 Total Base Proposal Pricing:... ..................... ..„„„„„.............„$ 1,197,085 Includes Landscape Architecture and code required commissioning Additional Services Pricing: Civil Engineering, including initial surveying $ 20.185 LEED Silver Commissioning” $ 106,278 LEED Gold Commissioning” $ 116.478 Provide a list of expected hours to complete each of the line items above, along with a current hourly rate chart. *” See attached sheets for anticipated hours for each line item above and for items included in LEED Commissioning Costs See the attached diagram of the building and site modifications anticipated by the owner. Acknowledgements 1, As the Village is committed to energy efficiency in the design and operation of this project, will you agree to design to the level of proposed energy efficiency as set forth in the attached ComEd Efficiency Program documents, as long as it is economically feasible in the project budget? Yes X No 2. Will all Construction Document drawings be prepared in a 3-D format? a. Architectural Yes X No b. Structural Yes X No c. Electrical Yes No X d. HVAC Yes No X (partial) e. Plumbing Yes No X f. Fire Protection Yes No X 3. Controlling the Cost of Construction is a vital part of this project's success. The Village believes this can be best achieved by the entire team (Owner, A/E and CM) working together to achieve this goal. Will you agree to design to a Budget Amount for each of the disciplines (Architectural, Structural, Electrical, HVAC, Plumbing and Fire Protection)? The Budget Amount for each "trade" will be developed as part of the Pre - Construction process with the collaborative effort of the Owner — Construction Manager and A/E Team. Yes X No If no, please explain why. 4. The Village believes that competition among subcontractors and suppliers during the bidding phase is critical to ensuring best value results for the bidding of the work. Therefore it is vitally important that the bidding documents are NOT proprietary or "sole source" in any way. Will you agree to structure the design and specifications to include a minimum of three named manufacturers or suppliers (Please Note: the "basis of design" approach will NOT be an acceptable alternative to providing three manufacturers or suppliers.) for all systems, products, materials, including but not limited to: a. HVAC systems and equipment, temperature control systems and equipment, b. electrical systems and equipment, not including light fixtures, c. plumbing systems and equipment, d. building envelope systems and components (roofing, curtainwall, windows, masonry, etc.) and, e. most finish materials (ceiling systems, paint, wall protections, cabinets, etc.) Only in circumstances where the Village specifically authorizes in advance a sole source will a design and specification approach other than that described above be allowed. Those instances are likely to be with ceramic tile, carpet, vinyl tile, and lighting fixture selections. Yes we agree X No we do not agree 5. The Village believes in a negotiable terms for errors and omissions within the drawings. At no point will compensation for errors and omissions be waived in the contract between owner and architect. Do you agree to these terms? Yes X No Village of Mount Prospect IIFGM ARCHITECTS Police Department Headquarters March 28, 2018 Expected Hours and Additional Services Pricing FGM #: MK-4938 .... ..................... It emHours .a... --............. Base Proposal Antic) ...,,ted Hours Preliminary Design 1,093 Design Development 1,782 ...... _ CDs ............. 3,426 . Coordination with Furniture .... 80 .,------- CA 2,098 Total Anticipated Hours ... 8 480 _ _ .. Civil EngineennnAlternate Incl. Surveying 168 - .- �. LEED Alternate Fees For LEED Fees, the buildng size is estimated at 86,000 square feet LEED S'Iv"..... m er Com isslonin Costs _ �,...�... ,w Cost GBCI Fees _.. Registration Fees.. �.. $ 1..500 ------ Design Review ... _..®. $ 41042 _.. Construction Review �$. $ 1 37 Appeal m ed 1 appeal) -....w �� s (assumed........, 1 306 0 ProjectJ- CIRs (assumed 3 CIRs) 660 $ 400 Additional Design Fees (paperwork, etc)®� .. _ � $ . F GM Architects 300.,_. $ � 39 ,000 Consolidated Consultin g En Engineers �. J 92 .... $ 1 1,000 ......... .......... Civil (if provided by FGM) ,.r 55 $ 6,000 __.,_...... Energy Modeling 157 $ 22,000 Enhanced Commissioning (additional over co e required) 93 $0 14,00 Contingency $ 5,000 Tot I its nal Fees to Pursue LEED Silver 106,278 LEED Gold GBCI Fees -. .... ........m .. Registration Fees$ Po .. _ 1,500 Design Review $ 4,042 Copstruction Review $ 1 376 Apeals (assumed 1 appeal) _ $ 1,300 ProjectI(assume3 CIs') CRs d m $ 660 J, _) - __.,_...... ...... _. _. _�. � .. 0 AdPlaque , ditional Design Fees ( t .,paperwork, etc.) � $ _40 FGM Architects ............ 340 $ 44,200 Consolidated Consulting Engineers 183 $ 20,000 Civil (if provided by FGM) . .... ...... - 55 $ 6,000 Energy Modeling 157 � ... . 20,000.., Enhanced Commissioning (additional over code required) 93 $ 12,000 . Contingen cY$ 5,000' _ Total Additional Fees Pursue E of .... � i $ 116,478 .. ,w ---- \\fgm inc,com\cloud\dala\jobs\mk_oh\MK-4938.00\Fee Calculation,xls 1 FGhA ARCHITECTS HOURLY RATE SCHEDULE Effective November I, 2017* Where the fee arrangements are to be on an hourly basis, the rates shall be those that prevail at the time services are rendered. Current rates are as follows: FGM Architects Principal (Board of Directors) $250.00 Arch IV $185.00 Arch III $145.00 Arch II $115.00 Arch 1 $90.00 Intern $65.00 Interior Designer IV $175.00 Interior Designer III $170.00 Interior Designer II $105.00 Interior Designer 1 $85.00 Landscape Architect $160.00 Project Administrator III $110.00 Project Administrator II $85.00 Project Administrator 1 $75.00 McCluskey Engineering Corporation (Structural Engineering) Principal Engineer $155.00 Senior Engineer $130.00 Engineer $108.00 Drafting Supervisor $102.00 Draftsman $87.00 Clerical $55.00 Consolidated Consulting Engineers (MEPFP Engineering) Principal/Associate Engineer $150.00 Design Engineer $125.00 Drafting $95.00 Clerical $80.00 Correct Electronics (Security Consulting) Security Consultant $120.00 Prasino Engineering (Commissioning Agent) Principal $185.00 Project Manager $175.00 Senior Analyst $165.00 Commissioning Agent $150.00 Senior Specialist $150.00 Level III Analyst $145.00 Level II Analyst $135.00 Page 1 of 2 � 94 ff IV, WMAI 11110 El Level I Analyst $125.00 Administrative $80.00 Webster, McGrath and Ahlberg (Civil Engineering - Additional Service) Senior Engineer $155.00 Landscape Architect $155.00 Project Engineer $120.00 Senior Land Surveyor $165.00 Land Surveyor $152.00 *Hourly rates are subject to adjustment on November 1 each year. Page 2 of 2