Loading...
HomeMy WebLinkAbout04/17/2018 CDBG Sidewalk Improvements BoardDocs® ProPage 1 of 3 Agenda Item Details MeetingApr 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m. Category8. VILLAGE MANAGER'S REPORT Subject8.3 Motion to accept bid for Community Development Block Grant (CDBG) Sidewalk Improvements in an amount not to exceed $176,038. AccessPublic TypeAction Recommended ActionAccept the lowest cost, responsive bid as submitted by Schroeder & Schroeder, Inc. of Skokie, Illinois for construction of the 2018 Community Development Block Grant (CDBG) Sidewalk Improvements in an amount not to exceed $176,038. Public Content Information This year’s Community Development Block Grant (CDBG) Sidewalk Program includes new sidewalk to be installed on the north side of Dempster Street, between Redwood Drive and Linneman Road. This fills in the remaining gap in public sidewalk along the north side of Dempster Street between Elmhurst Road and Algonquin Road. Also included in this year’s program is the replacement of existing sidewalk that does not comply with the standards for the Americans with Disability Act (ADA) at eligible locations in the Village; specifically targeting Dempster Street from Elmhurst Road to Algonquin Road. A location map depicting the project area is attached. The CDBG program is a wholly federally funded urban neighborhood improvement program administered by the United States Department of Housing and Urban Development (HUD). It avails federal money for specific improvements in geographic areas that satisfy HUD community needs criteria. A map depicting these areas within the Village is attached. Bid Results A Notice to Bidders was posted on the Demandstar by Onvia website and published in a local newspaper. Copies of the bid documents and project plans are attached. The bid opening for the 2018 CDBG Sidewalk Program was held on April 2, 2018 at 1:00 PM. Six (6) contractors submitted bids for this project. The bids ranged from a low of $96,889.22 by Schroeder and Schroeder, Inc. to a high of $149,068.50 by Globe Construction, Inc. A summary of bid results is denoted in the table below. A detailed bid tabulation is attached. BiddersBid Schroeder & Schroeder, Inc.$96,889.22 ALamp Concrete Contractors, Inc.$99,389.50 Copenhaver Construction, Inc.$120,898.00 Triggi Construction, Inc.$124,999.25 Alliance Contractors, Inc.$133,763.80 Globe Construction, Inc.$149,068.50 Engineer’s Estimate $143,537.75 https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login6/6/2018 BoardDocs® ProPage 2 of 3 Discussion All bidders submitted a bid bond in the amount of 10% of the total bid as required in the bid proposal packet. All bids were checked for their accuracy. One error was found, but it did not change the order of the bids. All bidders correctly signed their bids and bid bonds. The low bidder, Schroeder and Schroeder, Inc. is qualified to complete the work involved with this project and meets the requirements of the contract documents. Schroeder and Schroeder, Inc. has worked on previous Village sidewalk projects, including the 2016 and 2017 New Sidewalk Programs, 2016 and 2017 Shared Cost Sidewalk Programs, and 2015 and 2017 CDBG Sidewalk Programs. All of their work has been satisfactory. The Village received a 2018 CDBG grant in the amount of $176,038 for sidewalk improvements. Unspent grant funds cannot be utilized in other geographic areas or for other purposes. Consequently, it is staff's recommendation that the proposed contract quantities be increased to facilitate the expenditure of the entire grant amount ($176,038) at the low bidder's unit prices to replace additional ADA noncompliant sidewalk. This particular stretch of new sidewalk is located adjacent to Birch Manor Condominiums, which were recently annexed into the Village. Completing the sidewalk gap in this location will be a direct benefit to the residents of Birch Manor and the surrounding neighborhood. Alternatives 1. Accept lowest cost, responsive bid for construction of the 2018 CDBG Sidewalk Improvements. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board accept the lowest cost, responsive bid for construction of the 2018 CDBG Sidewalk Improvements in an amount not to exceed $176,038. Location Map.pdf (43 KB)Specifications.1.pdf (12,758 KB) Plans.2.28.18.pdf (1,398 KB)bid tab.pdf (16 KB) Schroeder & Schroeder.pdf (623 KB)CDBG ELIGIBLE AREAS 2018.pdf (243 KB) Administrative Content NB - added the last paragraph related to birch manor. Executive Content Motion & Voting Accept the lowest cost, responsive bid as submitted by Schroeder & Schroeder, Inc. of Skokie, Illinois for construction of the 2018 Community Development Block Grant (CDBG) Sidewalk Improvements in an amount not to exceed $176,038. Motion by Michael Zadel, second by Richard Rogers. https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login6/6/2018 BoardDocs® ProPage 3 of 3 Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login6/6/2018