Loading...
HomeMy WebLinkAbout04/25/2000 COW agenda COMMITTEE OF THE WHOLE AGENDA Meeting Location: Meeting Date and Time: Mount Prospect Senior Center Tuesday, April 25, 2000 50 South Emerson Street 7:30 p.m. I. CALL TO ORDER - ROLL CALL Mayor Gerald L. Farley Trustee Timothy Corcoran Trustee Dennis Prikkel Trustee Paul Hoefert Trustee Michaele Skowron Trustee Richard Lohrstorfer Trustee Irvana Wilks II. ACCEPTANCE OF MINUTES OF APRIL 11, 2000 III. CITIZENS TO BE HEARD IV. FLOOD CONTROL/STORMWATER MANAGEMENT PROJECT UPDATE Starting back in the late 1980s, the Village embarked on an aggressive Flood Control/Stormwater Management Program designed to lessen the incidents of flooding within the community. The Village's approach has been comprehensive in nature and includes both "bricks and mortar" flood control projects and progressive stormwater management regulations. The results of this effort have benefited substantial portions of the Village by significantly reducing incidences of basement as well as overland flooding. Additionally, stormwater management regulations have enabled Village residents to enjoy very favorable flood insurance rates as well as minimize the impact of FEMA Flood Plain Maps on property values and development potential. Tuesday evening's discussion will provide a comprehensive review of the status of component parts of the Program. The following areas will specifically be covered: Weller Creek Weller Creek is severely eroding along approximately 2,500 feet of its channel length between Route 83 and School Street. The length of the Creek between these two streets is almost 3,000 feet. In 1998, a 500-foot section of the Creek was the subject of a Bank Stabilization Project. Staff is currently working with adjacent residences to develop a comprehensive stabilization plan that will protect the remaining portion of this vital watershed asset. NOTE: ANY INDIVIDUAL WHO WOULD LIKE TO ATTEND THIS MEETING BUT BECAUSE OF A DISABILITY NEEDS SOME A CCOMMODA TION TO PARTICIPATE, SHOULD CONTA CT THE VILLAGE MANAGER'S OFFICE AT lO0 SOUTH EMERSON, MOUNT PROSPECT, ILLINOIS 60056, 847/392-6000, EXTENSION 5327, TDD #847/392-6064. STORMWATER MANAGEMENT PROGRAM In November of 1990, the Village Board adopted a Stormwater Management Program designed to reduce the magnitude and frequency of flooding in selected areas of the Village. The initial Program included 14 different Flood Control Projects Village-wide at an estimated cost of $18.3 million. Since its inception, 13 of the 14 Projects have been started and/or completed at a total cost of $15,991,573. Completion of these projects has significantly reduced the incidents of basement and overland flooding. REVISED FLOODPLAIN MAPS AND LEVEE 37 UPDATE The propensity of the Des Plaines River to overflow its banks has put the far northern portion of the Village at substantial risk for overland flooding. The Village has been working with the U. S. Army Corps of Engineers and other local bodies to establish a viable Flood Control Project that will minimize the risk of future flooding. Substantial progress has been made in that regard with a proposal to construct a floodwall along the eastern edge of River Road receiving a high rating for cost effectiveness. Staff has also been working closely with residents in this area of town to reduce the impact of revised FEMA Floodplain Maps. Our appeal of proposed changes appears to have resulted in modifications that will favorably impact property values in this area. Attached are staff reports, which provide important background information on each of these efforts. Additionally, residents affected by the Weller Creek Bank Stabilization Project have been invited to attend as well as the Village's consulting engineer, Earth Tech. Appropriate Village staff will also be in attendance. All will be on hand to provide background information and facilitate discussion. V. VILLAGE MANAGER'S REPORT VI. ANY OTHER BUSINESS VII. ADJOURNMENT H:\GEN\Cow~Agenda\042500 COW Agenda.doc