8.1 Motion to accept bid for the Louis Street Relief Station Improvements in an amount not to
Martam Construction Inc., Elgin
exceed $196,295.
Type
Action
Preferred Date
Jul 18, 2017
Absolute Date
Jul 18, 2017
Fiscal Impact
Yes
Dollar Amount
196,295.00
Budgeted
Yes
Budget Source
Water and Sewer Enterprise Fund
Recommended
Accept the lowest cost, responsive bid to construct the Louis Street Relief Station Improvements
Action
submitted by Marc Kresmery Construction, LLC of Elgin, Illinois in an amount not to exceed
$196,295.
Backaround
In the current budget, funds available to continue the rehabilitation of the Village's sanitary relief stations. These
stations are utilized to provide relief to the Village -owned sanitary sewer system in the event Metropolitan Water
Reclamation District of Greater Chicago (MWRDGC) receiving sewers become surcharged during rain events.
The Village owns and maintains eight (8) sanitary relief stations and two (2) sewage lift stations. This project will be the
fourth sanitary relief station rehabilitation completed in recent years. George Street North, George Street South and
William Street rehab have already been successfully rehabilitated.
The Louis Street Sanitary Relief Station was built in the 1971 and has been repaired over the years as needed. This
station provides sanitary sewer relief for the area depicted in the attached location map (Louis Street Sewers.pdf).
The planned improvements include replacement of the underground electrical feed, installation of a packaged
replacement pump station with new pumps, guide rails and controllers, along with all associated wiring and other
electrical control equipment. The existing wet well is in very good shape and will be rehabilitated to accommodate the
new equipment. The attached plan sheets depict these proposed improvements.
In 2010, a standby emergency generator with automatic transfer switch was installed at the station in case of a power
outage. This emergency back-up system is operational and will remain. The existing telemetry system will also be re-
used.
Bid Results
Bid invitations were sent to nine (9) area firms who have experience in sewer lift station projects. In addition, the work
was publicly advertised as required by Village Purchasing Policy.
On July 26, 2017, the bids were publicly opened and read as required by Village Code. The following two (2) firms'
submitted bids:
.....................................................................................................................................................................................................................................................................................................................................................................................................
Bidder
Bid
Marc Kresmery Construction LLC, Elgin
$178,450.00
Martam Construction Inc., Elgin
$237,380.00
http://www.boarddocs.com/il/vomp/Board.nsf/Public 1/2
7/26/2017 Board Docs® Pro
Engineer's Estimate: $220,250.00
Discussion
Both bidders properly submitted required documents as well as appropriate bid security. The low bidder, Marc Kresmery
Construction LLC had all the appropriate documents, security and signatures.
The lowest cost, responsive bidder is Marc Kresmery Construction from Elgin, Illinois. A copy of their bid submittal is
attached.
This firm has recently completed similar work for the Village including the George Street South Relief Station project in
2014 and William Street Relief Station Project in 2016. Kresmery performed all work in a satisfactory and timely
manner without incident and under budget.
Since the project will include underground work and the rehabilitation of the existing wet well, there may be some
unforeseen repairs. Staff is requesting a 10% contingency ($17,845) to address any of these unforeseen issues should
they arise. A 10% contingency would bring the project award total to $196,295 ($178,450 base bid plus the 10%
contingency of $17,845).
Alternatives
1. Accept lowest cost, responsive bid to construct Louis Street Relief Station Improvements.
2. Action at discretion of Village Board.
Staff Recommendation
Staff recommends that the Village Board accept the lowest cost, responsive bid to construct the Louis Street Relief
Station Improvements submitted by Marc Kresemery Construction, LLC of Elgin, Illinois in an amount not to exceed
$196,295.
LOUIS ST SEWER.pdf (677 KB) Louis Street Relief Station - Marc Kresmery Bid Form.pdf (4,359 KB)
2017-06-02 Louis Plans (Final).pdf (5,167 KB)
Motion & Voting
Accept the lowest cost, responsive bid to construct the Louis Street Relief Station Improvements submitted by Marc
Kresmery Construction, LLC of Elgin, Illinois in an amount not to exceed $196,295.
Motion by Paul Hoefert, second by Michael Zadel.
Final Resolution: Motion Carries
Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel