Loading...
HomeMy WebLinkAbout03/07/2017 Sewer Flow Monitoring Servicesftenda Item Details Meeting Mar 07, 2017 - REGULAR MEETING OF THE VILLAGE BOARD umm�" Category 5. CONSENT AGENDA Subject 5.3 MOTION TO ACCEPT PROPOSAL FOR SEWER FLOW MONITORING SERVICES IN AN AMOUNT NOT TO EXCEED $23,960. Access Public Type Action Preferred Date Mar 07, 2017 Absolute Date Mar 07, 2017 Fiscal Impact Yes Dollar Amount 23,960-00 Budgeted Yes Budget Source Water/Sewer Enterprise Fund Recommended Accept proposal from Burns & McDonnell to provide sewer flow monitoring services for a Action not -to -exceed fee of $23,960. 1� I ' =V! M As part of our long-term maintenance agreement with the Metropolitan Water reclamation District of Greater Chicago (MWRDGC), the Village is required to monitor separate sanitary sewer basins for clear water inflow and infiltration. Clear water can enter separate sanitary sewers during rain events through pipe defects, manhole defects, service line defects, or improper sump pump connections. Separate sanitary sewers are sized primarily to convey wastewater with little add'itional capacity to handle rain water (clear water). As a result, separate sanitary sewers influenced by excess clear water can experience surcharges and/or induce basement back-ups. Flow monitoring involves installing meters in sewer basins during wet weather to record the volume and velocity of flow. High flows during, or immediately after, significant rain events are indications of excess clear water inflow and/or infiltration. The scope of work includes rental, installation, and maintenance of the flow monitors., It also includes engineering analysis of the collected meter data and production of a letter report summarizing the wet weather hydraulic performance of the monitored sewer basins. littps://ww,w.boarddocs.com/ii/vomp/Board.nsf/Private?open&iogi,n, 3/13/2017 Blumi JJ1#1Q�A RIJ11,O)MAD] With a maximum best score of 30 points possible, the proposals were reviewed and scored by staff with the - following results: The Village has had a successful relationship with Burns & McDonnell and they have a good performaince record. Most recently, they successfully provided design and construction engineering services for the Isabella Sewer Improvements project and the Evergreen/Maple Water Main Improvements project., In addition, all references indicated that Burns & McDonnell have successfully performed this type of work for other MWRDGC communities. Afternatives 1. Accept proposal from Burns & McDonneH to provide specified sewer flow monitoring servic 2. Action at discretion of Village Board. I SJA��� Staff recommends accepting the proposal from Burns & McDonnell to provide specified sewer flow monitoring services for a not -to -exceed fee of $23,960. Sufficient funds for this proposed expenditure exist in the Water/Sewer Enterprise Fund., VOMP 2017 Flow Monitodng.pdf (97 KB) Administrative Content Executive Content Motion Accept proposal from Burns & McDonnell to provide sewer flow monftring services for a not -to -exceed fee of $23,960. https://www.boarddocs.coi,m'il/vo�mp/Board,nsf`/`P'rivate?opeini&logii�i 3/13/2017