HomeMy WebLinkAbout02/21/1991 FC minutesFINANCE COMMISSION
Minutes of the Meeting
February 21, 1991
I Call to Order
The meeting was called to order at 7:30 p.m. Commission members in attendance
were Richard Bachhuber, Paul Davies, John Engel, Vince Grochocinski, Jim
Morrison, Tom Pekras, Ann Smilanic, and Earl Sutter. Also present were Village
Trustee George Van Geem, Village Manager John Dixon, Public Works Director Herb
Weeks, Deputy Public Works Director Glen Andler, Planning and Zoning Director
David Clements, Inspection Services Director Chuck Bencic, Finance Director
David Jepson, Assistant. Finance Director Carol Widmer, one Village resident,
and one member of the press. Mayor Gerald L. Farley was in attendance at the
meeting from approximately 7:45 p.m. to 8:30 p.m.
II Approval of Minutes
The minutes of the February 7, 1991 meeting were accepted as presented.
III 1991/92 Budget. Review
A. Planning and Zoning
Planning and Zoning Director David Clements presented the budget for
Planning and Zoning and the Community Development Block Grant Program. The
professional staff of the Planning and Zoning Department is responsible
for zoning administration, permit review, long-range planning projects
including studies of redevelopment. areas, and monitoring the effectiveness
of the Comprehensive Plan. The staff administers the Community Develop-
ment Block Grant Program and also works closely with a number of Boards
and Commissions, as well as coordinating all economic development efforts.
In 1991/92 the staff will work with Broadacre, the preferred developer for
the downtown redevelopment. project to prepare development plans for the
downtown area.
The proposed 1991/92 budget includes activities similar to last year with
one exception. Staff will begin work in-house on revisions to the Zoninq
Ordinance and Development Code and there is a $10,000 item in the proposed
budget. for a land use expert or consultant to review staff work. This
project will address conflicts and inconsistencies in current ordinances.
The facade program is expected to generate increased interest and activity
in 1991/92 as property owners remove nonconforming signs as required by
the Sign Ordinance. Therefore, the facade services allocation has been
increased from $5,000 to $10,000.
Under the CDRG portion of the budget funding is proposed at $322,630 in
1991/92, a reduction of $267,095 from the $589,725 budgeted in 1990/91.
The primary reason for the decrease is the completion of the Boxwood Area
street and parking improvements except for a one block stretch of Dogwood
Lane. $60,000 is proposed for this improvement. in the 91/92 budget. There
will be continued funding of the successful single-family rehabilitation
and weatherization programs as well.
Commissioner Paul Davies asked if any CDRG funds could be used for flood
control projects. Dave Clements explained that CDBG funds are being used
to pay for engineering services in one eligible area. Commissioner Ann
Smilanic asked what duties the part-time interns perform. Dave Clements
said that the interns are assigned two responsibilities: one is to update
the Village sign inventory and the other is to create some development
scenarios for properties in redevelopment or undeveloped areas.
B. Inspection Services
Chuck Rencic, Director of Inspection Services, presented the proposed
1991/92 budget. for Inspection Services. The Inspection Services Depart-
ment is made up of three divisions: Building Code Division, Environmental
Health Division and the Engineering Division.
The Building Code Division is responsible for plan review, issuance of
permits and inspection of all buildings and structures in the Village,
both new and remodeling projects. In 1989, 2,031 permits were issued with
a value of $53,731,873 and during 1990, 1,936 permits were issued with a
value of $33,640,161.
The Environmental Health Division inspects all food establishments,
swimming pools, day care centers, health clubs and multi -family resi-
dential rental units. During 1990 this division performed 4,067
inspections and responded to 1,558 citizens' complaints on property
maintenance, insect and rodent control and public health matters.
The Engineering Division inspects all private site developments and the
design, contract preparation and inspection of Village projects such as
street resurfacing and reconstruction, sewer and water main replacements,
the shared -cost and new sidewalk programs, and bridge repair contracts.
They also review plans for proposed State and County roadway and traffic_
signal improvements along with other special projects.
The total proposed budget for 1991/92 is $1,017,700 compared to $958,080
for 1990/91, an increase of $59,620. The increase can be attributed to
increases in personal services and employee benefits. There is also a
request for $12,000 for a microfilm reader/printer and $5,000 for micro-
filming services for engineering plans.
In response to a question regarding training, Chuck explained that there
is cross training for the inspectors and a continuing plan to keep current
on BOCA regulations.
2
C. Public Works
Herb Weeks presented the Public Works Department proposed 1991/92 budget.
The amount proposed for the Street Division totals $4,441,040 compared
with $5,486,735 in 1990/91 for an overall decrease of $1,045,695. Some of
the noteworthy reductions include: deferring bridge reconstruction
($60,000), reducing new sidewalk construction ($15,000) and reducing the
General Fund contribution to street paving/construction ($250,000). Also,
several contractual services such as tree trimming, catch basin cleaning
and ground maintenance have been reduced by a total of $51,000. Specifi-
cally in the Forestry Program, a reduction in funding will necessitate the
extension of the 5 -year cycle on tree trimming beyond 5 years. Also, the
average cost of a 2-1/2" diameter tree in the share -cost program now costs
an average of $250; therefore, it is recommended that the resident share
be increased from $50 to $100 to cover some of the additional costs. In
the Forestry Program, a seasonal intern position has also been eliminated.
The funding for the purchase of flowers and shrub replacements in the
beautification program has been reduced by 50% and two seasonal employees
have been eliminated from this portion of the budget.
The Schoenbeck Road project which was budgeted at $400,000 in 1990/91 has
been completed and accounts for $400,000 of the 1991/92 reduction.
Although the disposal site that has been used for the past 15 years will
no lonqer be available, the fall leaf removal program will be continued.
Based on the total yards of leaves harvested in 1990 it would have cost
$85,000 in tipping fees at a state -approved compost site. In this budget
the praovision for leaf disposal charges have been removed from the leaf
program and have been added to the Refuse Disposal Program. The solid
waste contract with BFI will terminate on July 31, 1991 and it is expected
that bids for a new contract will be received by the end of March.
The Water and Sewer Division proposed budget totals $6,346,700, a decrease
of $364,770 from the 1990/91 budget of $6,711,470. The decrease can be
attributed largely to a scale -back of Capital Expenditures. Water main
improvement costs have been reduced by $325,000 and the booster pump
replacement program has been cut back by $30,000.
Some of the significant projects proposed in the 1991/92 budget include
the continuation of the booster pump replacement. program at a reduced
level of spending of $55,000, replacement of the water system control
panel ($40,000), replacement water mains ($115,000), and replacment sewer
mains ($90,000).
One significant expenditure that was expected to be included in the
1991/92 budget was the major rehabilitation project on the elevated water
storage tank. The project was estimated to cost. $260,000. Director Weeks
said the work could be delayed another year or two without harm to the
tank.
3
Seven vehicles have been budgeted for replacement in the Motor Equipment
Pool Fund. The total cost of these proposed replacements is $321,000.
The vehicles include replacements for a 1979 tractor w/mower, 1973 sewer
jet, 1985 utility truck, 1970 leaf machine, a 1983 Ford pickup, and two
1981 dump trucks.
Herb answered several general questions from the Finance Commission
regarding the street resurfacing program and the current. condition of the
elevated water tank.
IV The next meeting will be March 7, 1991, at which time the proposed 1991/92
budgets for Human Services, Police Department and Fire Department will be
presented.
The meeting was adjourned at 10:15 p.m.
CLW/sm
4
Respectfully submitted,
eaw "fal�'WA)
Carol L. Widmer
Assistant Finance Director