HomeMy WebLinkAbout03/16/2016 2016 STREET RESURFACING PROGRAMItem XI. B.: Motion to Accept Bid for 2016 Street Resurfacing Program in an amount not to exceed $3,735,963. Department: PW -Engineering Information: The goal of the Village's Street Resurfacing Program is to maintain an average 20 - year life for all Village streets. This requires that a minimum 6.81 miles of Village streets are resurfaced on a yearly basis. This year's program includes 6.96 miles of streets and is being funded through the Street Improvement Construction Fund. A listing of proposed street segments slated for resurfacing this year are included as Attachment A. A map of proposed streets is enclosed as Attachment B. A notice to bidders was published in a local newspaper. On February 29th at 1:00 PM sealed bids for the 2016 Street Resurfacing Program were publicly opened and read aloud. Five general contractors picked up the bid documents and three contractors submitted bids. The bids ranged from a low of $3,396,330.00 by Arrow Road Construction Company, to a high of $3,963,707.00 by A -Lamp Concrete Contractors. The Engineer's estimate for the project is $3,567,893.00. Below is a summary of the bids. Bidders Arrow Road Construction Co. Johnson Paving Co. A Lamp Concrete Contractors, Inc Engineer's Estimate Total Bid $ 3,396,330.00 $ 3,730,595.40 $ 3,963,707.00 $ 3, 567, 893.00 Village Board Meeting - March 16, 2016 Page 239 of 244 All bidders submitted bid bonds in the amount of 5% of their total bids as required by the bid documents. All bids were checked for accuracy. All bidders correctly signed their bids and bid bonds. The low bidder, Arrow Road Construction Co. has previously completed street improvements for the Village which included the 2014 and 2015 Street Resurfacing Programs. Arrow Road's work was acceptable. The budget allocation for this project is $3,469,000. recommend that the contract be awarded in an amount that includes a 10% contingency ($339,633.00) to allow for variances in contract quantities. The project award, including contingency, would total $3,735,963.00 ($3,396,330.00 bid + $339,633 contingency). Although this proposed expenditure would exceed the allocated 2016 budget by $266,963.00, there are sufficient funds in the Street Improvement Construction Fund balance to accommodate this contingency. Alternatives: 1. Accept lowest cost bid for Street Resurfacing Program. 2. Discretion of the Village Board Budget Impact: This proposed contract will require the expenditure of $3,735.963.00 from the Street Improvement Construction Fund. Recommendation: recommend that the low bidder, Arrow Road Construction Co. be awarded the contract for the 2016 Street Resurfacing Program in the amount not to exceed $3,735.963.00. SUPPORTS THE FOLLOWING STRATEGIC PLAN GOALS: INFRASTRUCTURE: Well designed, well maintained public spaces and facilities ATTACHMENTS: Description Type Upload Date File Name D Attachment A_ Cover Memo 3/9/2016 Attachment—A 2016 - List of Streets List@2016-03-08.pdf Attachment B _ Attachment B ProjectMap- Village Board Meeting - March 16, 2016 Page 240 of 244