HomeMy WebLinkAbout06/02/2015 RFP Results for Design & Construction Engineering Services for Public Works Administrative Roof ReplacementMount Mount Prospect Public Works Department INTEROFFICE MEMORANDUM TO: DIRECTOR OF PUBLIC WORKS, SEAN P. DORSEY FROM: STREET & BUILDING SUPERINTENDENT DATE: MAY 27, 2015 SUBJ: RFP RESULTS FOR DESIGN AND CONSTRUCTION ENGINEERING SERVICES FOR PUBLIC WORKS ADMINSTRATIVE ROOF REPLACEMENT ($22,500) Background The Public Works Facility is approaching 28 years old and still has the original single ply roof installed. The roof has been inspected by two (2) separate roofing consultants at different times within the last five years. Both roofing consultants identified degradation of the roofing system and recommended complete replacement of the roof membrane, insulation, flashing and other associated roofing components. The roofing consultants identified significant shrinkage of the single ply membrane, which is causing the membrane to pull away from the parapet walls causing undue pressure on the structural walls. In addition the roof has experienced a number of leaks at increasing frequency as the roof continues to age. Average leaks experienced over the life of the roof have been two (2) — five (5) a year, but in the last few years the leaks have increased to eight 8) — 10 annually. Lastly, the single ply membrane continues to degrade with age and no longer adequately supports foot traffic. The roof is frequently accessed to check mechanicals located on the roof and the foot traffic is directly contributing to the increased leaks. The life expectancy of the installed single ply roof was 20 years. This is the first year of a two year program to replace the Public Works facility roof. In the current Capital Improvement Plan is the replacement of the roof over the Public Works main garage and vehicle maintenance garage scheduled for 2016. Unfortunately staff lacks the resources and expertise to prepare satisfactory plans, specifications and bidding documents necessary to complete this project. Staff prepared a request for proposal and solicited proposals from four (4) firms qualified to perform this work. The firms were asked to submit proposals to complete the following: developing specifications, conducting a pre-bid walkthrough, reviewing the bids and overseeing the construction of the project per design. Page 2 of 2 RFP RESULTS FOR DESIGN AND CONSTRUCTION ENGINEERING SERVICES FOR PUBLIC WORKS ADMINSTRATIVE AND ROOF REPLACEMENT ($22,500) May 27, 2015 Proposal We sent out (4) four proposals for professional services and received proposals from (3) three out of the (4) four firms. The fourth firm replied by email that they were too busy to take on any new work. Discussion The proposals were reviewed and rated (with a maximum score of 100 points possible) according to these categories: Background of firm, capacity to perform work, project understanding, related project experience, and project schedule. The compiled ratings are noted in the table below: Firm Rating Ehlke Lonigro Architects 92 STR Building Resources 90 Building Technology Consultants, Inc (BTC) 84 Staff has reviewed all three proposals and determined that Ehlke Lonigro Architects has shown a good understanding of the project and have allotted adequate and qualified resources to design and oversee the construction of the requested improvements. Staff contacted the firm's references and all indicated that they performed satisfactory work and they would recommend using Ehlke Lonigro Architects Design for future projects. In addition, Ehlke Lonigro Architects has performed other design work for private business in the Village of Mount Prospect and the Community Development Department has provided positive feedback about their work. Typically, we expect design and construction engineering fees for roof replacement work to cost approximately $5-$8 per square foot. Ehlke Lonigro's fee is $2.05 per square foot; well below recent costs incurred performing similar work. Staff also met with one of the firm's principals, Sean Ehlke, and is confident the firm has sufficient knowledge and experience to perform this work at the proposed price. Recommendation I recommend that the Village Board accept the proposal from Ehlke Lonigro Architects to include field investigation, design, construction documentation preparation, bidding and construction administration services for the Public Works Administrative Roof Replacement for a fee not to exceed $22,500. Sufficient funds for the proposed expenditure are available int 20 5 budget. -- Paul Bures Superintendent of Streets & Buildings Director of Public Works Cc: Deputy Director of Public works Jason Leib File