Loading...
HomeMy WebLinkAbout05/19/2015 Water Main Improvements 2015Mount Prospect Public Works Department INTEROFFICE MEMORANDUM TO: ACTING VILLAGE MANAGER DAVID STRAHL FROM: VILLAGE ENGINEER DATE: MAY 12, 2015 SUBJECT: BID RESULTS FOR THE 2015 WATER MAIN IMPROVEMENTS (CONTRACT AWARD NOT TO EXCEED $1,458,542) Background In 2008, a comprehensive hydraulic analysis of the Village -owned potable water distribution system was performed. A major outcome of this analysis was a recommendation to increase the size (diameter) of the pipes at or near the base of the elevated tank. The existing pipes are primarily 6" and 12" in diameter. The hydraulic analysis indicated that these pipes tend to be constrictive in nature and contribute to both low pressure and high pressure problems in the distribution system. Specifically, the existing pipes tend to retard the flow of water into and out of the elevated tank thereby limiting the tank's ability to drain and fill. Water distribution system pressure is maintained utilizing elevated tank drain and fill cycles as triggers. As the tank level lowers, booster pumps are turned on to increase pressure. As the tank fills, pumps are turned off and reservoir fill valves are opened to reduce pressure. However, due to the hydraulic lag caused by undersized piping at the base of the elevated tank, booster pumps sometimes stay on too long causing intermittent high pressure and fill valves remain open too long creating intermittent low pressure problems. To correct this problem, staff proposes to replace the existing undersized water mains along Evergreen Avenue and a portion of Maple Street near the elevated tank with larger, 24" and 16" diameter pipes. Bid Results Plans and bid documents for this project were prepared by Burns & McDonnell, consulting engineers of Downers Grove, Illinois and a public notice was placed in the newspaper. Thirteen (13) construction firms picked up bid documents and twelve (12) attended a mandatory pre-bid meeting on April 27, 2015. Bids were opened and read aloud on May 4, 2015. Six (6) bids were received. Each of the bidders submitted a bid bond in the amount of 10% of the total bid as required in the bid proposal packet. All bids were checked for accuracy. No errors were found. All bidders correctly signed their bids and bid bonds. Below is a summary of the bids: Page 2 of 2 Bid Results for 2015 Water Main Improvements ($1,458,542) May 13, 2015 Bidders Total Bid Martam Construction, Inc. $1,325,947.00 DiMeo Brothers, Inc. $1,331,129.00 H. Linden & Sons Sewer & Water, Inc. $1,355,106.00 J. Congdon Sewer Service, Inc. $1,399,225.00 Berger Excavating Contractors, Inc. $1,420,442.20 All -amp Concrete Contractors, Inc. $1,909,704.00 Engineer's Estimate $1,187,907.05 Discussion The low bidder, Martam Construction, Inc., is prequalified by the Illinois Department of Transportation for construction projects and meets the requirements of the contract documents. Martam Construction, Inc. has completed many projects for the Village in previous years, including the installation of water main. All work has been completed to the Village's satisfaction. Staff recommends including a 10% contingency in the project award to allow for quantity variances and unanticipated underground conflicts. In this instance, a 10% contingency added to the lowest cost bid would result in a total contract award of $1,458,542 (Base Bid: $1,325,947 + Contingency: $132,595 = Total Recommended Award: $1,458,542). Recommendation recommend the low bidder, Martam Construction, Inc. of Elgin, IL, be awarded the contract for the 2015 Water Main Improvements in the amount not to exceed $1,458,542. Please include this item on the May 19t" Village Board Meeting Agenda. I concur with the above recommehdation. Director oC1134ibTic Works Sean P. Dorsey cc: Village Clerk Lisa Angell HAEngineering\Utilities\Water Main\2015 Maple-Evergreen\bid & award.doex