HomeMy WebLinkAbout02/17/2015 Construction Engineering for Generator Installation at BPS 11Mount Prospect Public Works Department INTEROFFICE MEMORANDUM �M?/ TO: ACTING VILLAGE MANAGER DAVID STRAHL FROM: WATER/SEWER SUPERINTENDENT DATE: FEBRUARY 12, 2015 SUBJ: CONSTRUCTION ENGINEERING FOR GENERATOR INSTALLATION AT BPS 11 ($25,700) BACKGROUND The Village Board has authorized the installation of emergency, standby generators at the Village's deep well sites. These standby units are designed to provide all of the electrical power sufficient to run the village's deep wells and booster pumps at each site. Over the past several years, the village installed emergency generators at three (3) deep well/booster pumping stations including station 5, 16 and 17. For each project, an electrical engineer was needed to prepare the plans and specifications for both the generator purchase and its subsequent installation. DISCUSSION For the first two sites; staff used the services of the Farnsworth Group of Bloomington, Illinois and for the third unit, Burns & McDonnell Engineers of Downers Grove, Illinois. Burns & McDonnell assisted with the review and purchase of the fourth generator unit which was purchased in 2014 under a joint purchase agreement from Patten Power Systems of Wheaton, Illinois. Staff is recommending the continued use of consulting engineer, Burns & McDonnell Engineers to complete the installation of the fourth unit at Station 11. At staff's request, Burns submitted a proposal to supply specified engineering assistance after contract award that includes oversight of the project and contract administration. Their fee to assist the Village with this project for 2015 is $25,700 based on an estimated four to six weeks of part-time assistance. Engineering services for this type of work usually range between 8-10% of the overall project costs. When the engineering fee is compared to the installation bid award being considered by the Board, this engineering fee proposal is below that percentage range and is considered reasonable by staff. Page 2 of 2 Construction Engineering for Generator Installation at BPS 11 ($25,700) February 12, 2015 Staff has worked well with Burns & McDonnell on several projects over the past few years, including the acquisition and installation of standby generators for the sanitary sewer relief stations, the replacement of George Street North and South sanitary sewer relief stations, and the acquisition and installation of the standby, emergency generator for Booster Pumping Station 17. RECOMMENDATION I recommend that the Village Board authorize a professional services agreement with Burns & McDonnell Engineers of Downers Grove, Illinois, for construction engineering services associated with the installation of a standby emergency generator at Station 11 for an amount not to exceed $25,700. Sufficient funds for this proposed contract exist in the water/sewer enterprise fund. Matt Overeem S P. Dorsey Director of Public Works CC: Village Clerk Lisa Angell H:\Water\projects\2015\gen 11\BOARD PSA Burns BPS 11 Generator.doc