Loading...
HomeSearchMy WebLinkAbout01/21/2025 Waive the bid process and approve the purchase of Globe turnout gear from Air One at a price not to exceed $72,160 in 202502/04/2024 Motion to accept Northwest Municipal Conference / Suburban Purchasing Cooperative Fuel Bid in an amount not to exceed $500,00002/18/2025 Motion to accept lowest cost, responsive bid submitted by Advanced Landscaping, LLC of Carol Stream, IL for the 2025-2026 Turf Mowing Contract in an amount not to exceed $45,332.10 in 2025.02/18/2025 Motion to accept the Suburban Purchasing Cooperative Bid for the purchase of one 2025 Ford Explorer All-Wheel Drive (AWD) Hybrid Pursuit-Rated Utility Vehicle (Replacement) from Currie Motors in an amount not to exceed $77,392, including a $10,03/04/2025 Motion to accept proposal for Construction Inspection Services from Chastain Consulting Engineers to support the 2025 Street Resurfacing Projects, Group 1 and Group 2, for an amount not to exceed $114,506.03/18/2025 Motion to accept bid for 2025 Combined and Sanitary Sewer Lining (CIPP) Project for an amount not to exceed $1,706,926.03/18/2025 Motion to accept lowest-cost, responsive bid for repairing and repainting Booster Pumping Station 4 Storage Tank in an amount not to exceed $566,970.03/18/2025 Motion to accept the lowest-cost, responsive bid for the 2025 Water Main Replacement Project including the two (2) alternate bid items for an amount not to exceed $6,192,543.99.03/18/2025 Motion to reject the lowest-cost bid as non-responsive to the bid documents and accept the second lowest-cost, responsive bid for the 2025 Storm Sewer Lining Project for an amount not to exceed $789,091.04/15/2025 Motion to accept the 2025/2026 Municipal Partnering Initiative Joint Bid Results for Asphalt Pavement Patching for an amount not to exceed $50,000.05/06/2025 Motion to waive the rules requiring public bidding and award a contract for a 35' tall steel clocktower with carillon bell system from the Verdin Company of Cincinnati, Ohio for a cost not to exceed $259,650.05/20/2025 Motion to accept the lowest-cost, responsive bid for Deep Well No. 16 Rehabilitation for an amount not to exceed $515,080.05/20/2025 Motion to accept the proposal from Civiltech Engineering, Inc. for the Prospect Avenue Limited Boundary Alternatives Analysis Study for an amount not to exceed $114,909.20.06/03/2025 Motion to accept lowest-cost, responsive bid for the Central Gateway Demolition and Restoration Project in an amount not to exceed $186,692.