Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
02/17/2015 Construction Engineering for Generator Installation at BPS 11
02/17/2015 Environmental Site Assesment Services for 2-40 N. Main Street
02/17/2015 Installation of Emergency Stand-by Generator at Booster Station 11
02/17/2015 Northwest Highway Streetscape Construction Bid Concurrence
02/17/2015 Parkway Tree Furnishing & Planting Contract
02/17/2015 Turf Mowing
03/03/2015 Parkway Tree Stump Removals
03/03/2015 Street Resurfacing Contract 2015
03/16/2015 CDBG Parkway Tree Furnishing & Planting
03/16/2015 Copier Lease & Maintenance Agreement
04/08/2015 Brick Paver Sealing Contract 2015-2016
04/08/2015 Concrete Restoration Contract 2015
04/08/2015 Downtown Wayfinding Signage Program
04/08/2015 Northwest Highway Streetscape Project
04/21/2015 EAB Insecticide Treatment
04/21/2015 NJPA Contract for the Purchase of one (1) New 2015 John Deere Backhoe/Loader 410L
05/19/2015 Acceptance of Proposal for Demolition of 2004 Scott Terrace
05/19/2015 Booster Pumping Station # 17 Roof Removal & Replacement
05/19/2015 Construction Engineering for 2015 Water Main Improvements
05/19/2015 Proposal to Extend Downtown Streetlight Painting Contract
05/19/2015 Request to Purchase Six (6) 2015 Dodge Charger Pursuit AWD Police Package Vehicles
05/19/2015 Shared Cost Sidewalk Program 2015
05/19/2015 Water Main Improvements 2015
06/02/2015 Levee 37 Tributary Area Drainage Study
06/02/2015 Parkway Tree Stump Removal Contract Termination & New Award Recommendation
06/02/2015 Prospect Meadows Drainage Project
06/02/2015 RFP Results for Design & Construction Engineering Services for Public Works Administrative Roof Replacement
06/02/2015 Waive Bid Process & Accept Proposal for Double Faced Electronic Message Sign Replacement
07/07/2015 CDBG Sidewalk Program 2015
07/07/2015 High Service Pump Rehabilitation
07/07/2015 Reject All Bids- Lincoln Street Bridge Rehabilitation
07/21/2015 Demoliton of 2-40 Main Street
08/18/2015 Busse Ave and Rt 83 Pedestrian Crossing improvements
08/18/2015 Kensington Center Jogging Path
08/18/2015 Requet to Purchase Ruggedized Laptop for Police
08/18/2015 Video Surveillance Acces Control Project
08/18/2015 Waive Bid Process and Purchase Breathing Apparatus
09/01/2015 Central Road and Weller Lane Construction Bid Concurrence
09/01/2015 Lincoln Street Bridge Rehabilitaion
09/01/2015 Police Firing Range Renovation Proposal
09/01/2015 PW Roof Replacement
09/01/2015 Site Remediation Program CLosure and Professional Remediation Services for 2-40 N. Main St (central Plaza)
10/06/2015 2015 Pavement Condition Evaluation Services
10/06/2015 2015/2016 Road Salt Contract
10/20/2015 Automated Pay Station Replacement
10/20/2015 Desktop PC
10/20/2015 Snow Removal and Ice Control Proposal New
11/17/2015 RFP Results for Elevator Maintenance ($10,560)
12/01/2015 2016 Traffic Signal Maintenance - $32,000