Loading...
HomeMy WebLinkAbout08/06/2013 Golfview Estates Drainage ProjectMount Mount Prospect Public Works Department INTEROFFICE MEMORANDUM TO: VILLAGE MANAGER MICHAEL E. JANONIS FROM: PROJECT ENGINEER DATE: JULY 30, 2013 SUBJECT: GOLFVIEW ESTATES DRAINAGE PROJECT (CONTRACT AWARD NOT TO EXCEED $119,870) Background The Golfview Estates Subdivision is bounded by Busse Road to the west, Lonnquist Boulevard to the south, and the Mount Prospect Golf Course to the east and north. The subdivision does not have storm sewers and relies on ditches for storm water drainage. Inconsistencies in the flow lines of several of the ditches has created local summits that reduce the capacity of the ditches and low areas that collect and hold water long after the rain has ended. The Golfview Estates Drainage Project reestablishes a consistent flow line to both improve the drainage of the ditches and to eliminate the water ponding in the ditches. Bid Results A Notice to Bidders was published in a local newspaper as required and invitations were sent to contractors familiar with this program. At 1:00 P.M. on July 29, 2013 sealed bids were publicly opened and read aloud. Eight (8) contractors submitted bids for this project. The bids ranged from a low of $104,235.00 by LIFCO Contractors, Inc., to a high of $220,055.00 by J. Congdon Sewer Service, Inc. The Engineer's estimate for the project was $150,800.00. Each of the bidders submitted a bid bond in the amount of 10% of the total bid as required in the bid proposal packet. All bids were checked for their accuracy. No errors were found. All bidders correctly signed their bids and bid bonds. Below is a summary of the bids: Bidders Total Bid LIFCO Contractors, Inc. $104,235.00 Concrete, Etc., Inc. $126,865.00 Maneval Construction, Inc. $147 Copenhaver Construction $151,610.00 Prime Construction, Inc. $163,450.00 Lenny Hoffman Excavating, Inc. $166,787.00 Century Contractors, Inc. $189,200.00 J. Congdon Sewer Service, Inc. $220,055.00 Engineer's Estimate $150,800.00 A bid was also received by Martam Construction, Inc. The bid bond was submitted, but the bid form was left blank, thus, it was counted as an unresponsive bid. Discussion The low bidder, LIFCO Contractors, Inc., has completed work within the Village and it has been satisfactory. Page 2 of 2 Golfview Estates Drainage Project (Contract Award Not To Exceed $119,870) July 30, 2013 Recommendation I recommend the low bidder, LIFCO Contractors, Inc. of Carol Stream, IL, be awarded the contract for the GOLFVIEW ESTATES DRAINAGE PROJECT in the amount not to exceed $119,870.00, which includes a 15% contingency. There are sufficient funds in the 2013 Budget to cover this proposed contract. Please include this item on the August 6 1 Village Board Meeting Agenda. Donna M. Brown, P.E. I concur with the above Director of Peip.lWorks Sean Dorsey cc: Village Clerk Lisa Angell H :\Engineering\Drainage \Golfview Estates Drainage Project \Recommendation.doc