Loading...
HomeMy WebLinkAbout11/20/2018 Bid Results for Weller Creek Silt RemovalBoardDocs® Pro Agenda Item Details Meeting Category Subject Access Type Preferred Date Absolute Date Fiscal Impact Dollar Amount Budgeted Budget Source Recommended Action Public Content Information Page I of 2 P .W.1 Motion to accept bid for Weller Creek Silt Removal in an amount not to exceed $87,692. Public Action Nov 20, 2018 Nov 20, 2018 Yes 87,692.00 Yes a roysTo to rem me fflwq� Accept the lowest cost, responsive bid for Weller Creek Sediment Removal submitted by Copenhaver Construction, Inc., of Gilberts, Illinois in an amount not to exceed $87,692. During the Village's annual creek maintenance inspections, Public Works staff observed sediment accumulated in portions a, of Weller Creek between Elmhurst Road and Emerson Street. Sediment build up can begin to restrict the flow and increask" the risk of flooding for adjacent properties. It can also cause plant growth which could also restrict flow. It is important tit, remove the sediment before it constrains the channel. Plans, specifications, and bid documents were prepared by the Public Works Department engineering staff to secure contractual services for the excavation, removal, and disposal of accumulated sediment. A map depicting the location of the proposed project area is attached. The contract time for this project is 22 days. Once a detailed schedule is established, the residents adjacent to this section of Weller Creek will be notified about the project and the notice will be posted on the Village website and social media outlets. ro rewffat� ommiliialiiorem. The bid opening was held on November 12, 2018 at 1:00 PM. Four (4) contractors submitted bids for this project. The bids ranged from a low of $79,720 by Copenhaver Construction to a high of $117,380 by Semper Fi Land, Inc. Below is a summary of the bids: M1 "14 Copenhaver Construction 1$79f720.00 Martam Construction 1$82f5OO.00 Misfits Construction 1$114fOOH .00' Semper Fi Land 1$117f380.00 https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 11/27/2018 BoardDocs® Pro Page 2 of 2 All bidders submitted a bid bond in the amount of 10% of the total bid as required in the bid proposal packet. All bids were checked for their accuracy. No errors were found. All bidders correctly signed their bids and bid bonds. The low bidder, Copenhaver Construction, Inc., is qualified to complete the work involved with this project and meets the requirements of the contract documents. They previously completed multiple detention pond dredging projects and their work was acceptable. The low bid is 33% higher than the Engineer's Estimate of Cost mostly due to increased cost for earth excavation. The reason for the increased cost for earth excavation is attributed to the high volume of water in the sediment. Contractors have explained that the saturated soil will slow production and incur additional cost for trucking excavated material. Staff recommends including a 10% contingency in the project award to allow for quantity variances and unanticipated conditions. In this instance, a 10% contingency added to the lowest cost bid would result in a total contract award of $87,692.00 (Base Bid: $79,720.00 + Contingency: $7,972.00 = Total Recommended Award: $87,692.00). Alternatives 1. Accept lowest cost, responsive bid for Weller Creek Sediment Removal. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board accept the lowest cost, responsive bid for Weller Creek Sediment Removal submitted by Copenhaver Construction, Inc., of Gilberts, Illinois in an amount not to exceed $87,692. -iaLpff ('732 KB) ,waiis .pdf (101 KB) Pl&ns bid.pdf (3,442 KB) Specsffr ................ Co -J-iaver Bid.pdf (4 21. KB) pe�r Administrative Content Executive Content Motion & Voting Accept the lowest cost, responsive bid for Weller Creek Sediment Removal submitted by Copenhaver Construction, Inc., of Gilberts, Illinois in an amount not to exceed $87,692. Motion by Richard Rogers, second by Michael Zadl. Final Resolution: Motion Carries Yea: William Grossi, Eleni Hatzis, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 11/27/2018